Modern Coach Factory
Important Info
AOC Description
Modern Coach Factory has published Supply Of ss hexagon bush 50 x 25 to specn, ss hexagonal reducing nipple 1 1/2 inch & ss hexagon bush 32 x 15 , ss hexagonal reducing nipple 1 1/2 inch x 1 1/4 inch n8 to specn.is:1879 2010 with amend no. 3 (reaffirmed 2020), sec-7, table-24 material aisi -304, taper thread as per is o 7/1. packing condition pi-042 ver1 [ warranty period: 30 months after the date of delivery ] ] , ss hexagon bush 32 x 15, is 1239-pt-2 2011,tab-27, aisi 30 4.%a0%a0packing conditi on pi-042 ver1. [ warranty period: 30 months after the date of delivery ] ] , ss hexagonal bush 40 x 15 mm, n4 to specn. is: 1879 2010, sec-7,tab-23 material aisi -304, parallel thread as per iso 7/1. packing condition pi-042 ver1. [ warranty period: 30 months aft er the date of delivery ] ]. Last date of submission for this tender is 2026-09-07. This is a Railway Ancillaries tender in Rae Bareli, Uttar Pradesh
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

