Modern Coach Factory
- AOC value
- ₹27.58L
- AOC date
- 11 Jun
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 11 Jun 25AOC date
- -Published
- -Closes
- -Bid opens
- 11 Jun 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 11/06/2025
- Authority
- Modern Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Modern Coach Factory has published Supply Of End Wall Construction Assembly Completeend Wall Construction Assembly Complete,End Wall Construction Assembly Complete Fitted Along With Shutter Complete To Drawing No. 2 10113.0.76.300.012 Alt. R1 For Lhb Coaches. The Exterior Of End Wall Shall Be Without Buldges Or Depressions That Might Appear After Painting. The Concavity And Convexity Shall Be Less Then 1.5Mm I N Length Of 2.5 Meter And In This Proportion For Shorter Length (Eft Cover Assembly To Be Supplied Loo Se Condition) To Drg.No. Le15250 Alt D. Packing Instruction: Mcfpi187 Ver.0. [ Warranty Period: 8 4 Months After The Date Of Delivery ] ]. Last date of submission for this tender is 2025-05-06. This is a Railway Ancillaries tender in Rae Bareli, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free