Modern Coach Factory
- AOC value
- ₹4.74Cr
- AOC date
- 11 Jun
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 11 Jun 25AOC date
- -Published
- -Closes
- -Bid opens
- 11 Jun 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 11/06/2025
- Authority
- Modern Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Modern Coach Factory has published Supply Of Supply & Installation Of Frp Modular Toilet For Lhb Gs Coaches.Supply & Installation Of Frp Modular Toilet For Lhb Gs Coaches.,Supply & Installation Of Frp Modular Toilet For Lhb Gs Coaches. Follow Col Our Shade As Per Lno. Rbl Md46271 (Part-1) Dated 22-05-2024, As Per Drawing: Mdts-214 Rev- 12 With Addendum As Per L. No.Md46111 Dated 16.04.2024 And Corrigendum-1 As Per L No. Md46111 Dated 18.04.2024 With Modification As Advised By Mcf Design Letter No. Rbl-Md4 6118 Dated 18.12.2024, Note-The Supply Of Lavatory Module Is To Be Done In Knockdown C Ondition Which Shall Be Fully Assembled Inside The Coach By The Firm (No. Of Pieces Of La Vatory Module May Be Increased Up To 4 Maximum Which Can Be Fully Assembled Inside Th E Coach) .Packing Instruction Pi111 Ver-2.0 [ Warranty Period: 78 Months After The Date Of Delivery ] ]. Last date of submission for this tender is 2025-05-15. This is a Toilet Bathroom tender in Rae Bareli, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free