Modern Coach Factory
- AOC value
- ₹1.51Cr
- AOC date
- 13 Mar
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 13 Mar 26AOC date
- -Published
- -Closes
- -Bid opens
- 13 Mar 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 13/03/2026
- Authority
- Modern Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Modern Coach Factory has published Supply Of Supply Of Stainless Steel Tubes With Stainless Steel Double Ferrule Fittings (Dff)Supply Of Stainless Steel Tubes With Stainless Steel Double Ferrule Fittings (Dff),Supply Of Stainless Steel Tubes With Stainless Steel Double Ferrule Fittings For Vp/Parcel V An/Lhb Design High Capacity Parcel Van With Collapsable Doors And Luggage Racks With Fiat Bogies As Per Specification No.- Icf/Md/Spec-166, Issue Status: 01, Rev. No.04, Date:- 28/08/2019 With A Mendment No. 1 , Date Of Issue 07/01/2022 And Amendment No.2, Date Of Issue 24/11/2022 And Mate Rial Schedule No. Icf/Sk-10-2-681, Issue Status-01, Rev-00. Packing Instruction :Spi042 (Dff) [ Warrant Y Period: 48 Months After The Date Of Delivery ] ] , Supply Of Stainless Steel Tubes And Double Ferrule Fittings For Air Spring Pneumatic Con Trol Equipment And Fiba Pipe Arrangement. As Per Icf Spec No.-Icf/Md/Spec-166, Issue Status: 01, Rev No.04, Date:- 28/08/2019 With Amendment No. 1 Date Of Issue 07/01/2022, Amendment No.2 Date Of Issue 24/11/2022 And Material Schedule Icf/Sk-10-2-637, Issue Status- 01, Rev No.00 Dated 07.04.2 017, Cs-01 Dated 09.11.2017, Mcf Cs-04 Dt. 22.02.2022, Mcf Cs-05 Dt. 18.07.2022 And Mcf Cs-06 Dt . 11.04.2025. Packing Instruction: Spi042 (Dff) [ Warranty Period: 48 Months After The Date Of Deliv Ery ] ] , Supply Of Stainless Steel Tubes With Stainless Steel Double Ferrule Fittings For Lwscz & L Wsczac Coaches. As Per Drg. No. As Per Icf Specification No.-Icf/Md/ Spec-166, Issue Status: 01, Rev. No.04, Date:- 28/08/2019 With Amendment No. 1 , Date Of Issue 07/01/2022 And Amendme Nt No.2, Date Of Issue 24/11/2022 And Material Schedule Icf/Sk-10-2-638, Issue Status-01, Rev.00, C S-01& 02. Packing Instruction: Spi042 (Dff) [ Warranty Period: 48 Months After The Date Of Delivery ] ] , Supply Of Stainless Steel Tubes With Stainless Steel Double Ferrule Fittings For Lslrd Coac Hes. Drawing/Specification- Icf Specification No.-Icf/Md Spec-166, Issue Status: 01, Rev. No.04, Date:- 28/08/2019 Wi. Last date of submission for this tender is 2026-01-28. This is a Steel Tube tender in Rae Bareli, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free