Modern Coach Factory
- AOC value
- ₹29.32L
- AOC date
- 5 Aug
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 5 Aug 25AOC date
- -Published
- -Closes
- -Bid opens
- 5 Aug 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 05/08/2025
- Authority
- Modern Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Modern Coach Factory has published Supply Of Electro Pneumatic Pressurized Flushing System (Piston Less).Electro Pneumatic Pressurized Flushing System (Piston Less).,Electro Pneumatic Pressurized Flushing System (Piston Less) As Per Mcf Spec. Mmdts 19027 , Rev-3 Except Clause No. 1.3, 3.1, 3.4, 6.6, S N-5 Of 6.7 & Annexure- A & B With Additional Requirements As Mentioned In Annexure-1-Piston Less Eppfs Is Also Applicable . Prototype Approval Is Required By Cde/Mcf Before Bulk Supply. Packing Instruction- As Per Clause 8 Of Mmdts-19027 Rev.-03 Dated 22/12/2022 [ Warr Anty Period: 30 Months After The Date Of Delivery ] ] Furnishing Progress, Uttar Pradesh 100.00 Set => Limited. Last date of submission for this tender is 2025-07-10. This is a Railway Ancillaries tender in Rae Bareli, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free