Madhyanchal Vidut Vitran Nigam Limited
- AOC value
- ₹16.97L
- AOC date
- 20 Dec
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 20 Dec 20AOC date
- -Published
- -Closes
- -Bid opens
- 20 Dec 2020AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 20/12/2020
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Madhyanchal Vidut Vitran Nigam Limited has published 104/Edcb/2019-20 Running Contract For Business Plan Works Under Edd-Ii , Bareilly ELECTRICAL , SUPPLY OF MATERIAL - 1 carriage of 1.01 PCC Pole 8.5 meter long. 1.02 STP 11 Mtr Long 1.03 Line material i.e., cross arm/ conductor/ pin insulator/stay/earthing rod/Disc Fitting/Disc Insulators/11 KV XLPE Cable etc 1.04 11/0.4 KV 1 Phase 10/16 KVA T/F 1.05 11/0.4 KV 3 Phase 25 KVA T/F 1.06 11/0.4 KV 3 Phase 63 KVA T/F 1.07 11/0.4 KV 3 Phase 100 KVA T/F 1.08 11 KV Pilfer proof Metering cubical and CT PT Unit 1.09 33 KV Pilfer proof Metering cubical and CT PT Unit 2 Erection of new PCC Single/Double pole in H.T/L.T lines including fitting of all accessories as per RESSPO Norms 2.01 PCC Pole 8.5 Mtr Long Single Pole 2.02 PCC Pole 8.5 Mtr Long Double Pole 2.03 ST Pole 11 Mtr Long Single Pole. 2.04 ST Pole 11 Mtr Long Double Pole. 3 Grouting with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/BB & sand Required as per RESSPO Norms 3.01 PCC Pole 8.5 Mtr Long Single Pole 3.02 PCC Pole 8.5 Mtr Long Double Pole 3.03 ST Pole 11 Mtr Long Single Pole. 3.04 ST Pole 11 Mtr Long Double Pole. 4 The work of Driving the earthing electrode and making connections with 6 S.W.G. GI wire as per RESSPO Norms 5 Laying, Stringing & Sagging of Following Conductor complete in all respect 5.01 ACSR Weasal Conductor 5.02 ACSR Dog Conductor 5.03 3 Phase Arial Bunched Conductor 5.04 1 Phase Arial Bunched Conductor After Mounting of CT PT unit on double pole, Under ground laying of Following cable 8.01 11 KV XLPE Cable digging of pits, erection of Stay Clamp, Insulator 11 Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms. Installation of 11 KV Pilfer Proof Metering Cubicle in metering room 13 Installation of 33 KV Pilfer Proof Metering Cubicle 14 Mounting of Transformers , 15 Fixing of Distribution Box complete 16 Guarding at road crossing 17 Safe back carriage of Scrap . Last date of submission for this tender is 2019-11-01. This is a Electrical Maintenance tender in Work, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
No Documents Found
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free