🎉 Your free trial plan has started. Plan will expire in 0 days

Madhyanchal Vidut Vitran Nigam Limited

bareilly, uttar pradesh

AOC value
₹1.9L
AOC date
20 Jul
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 20 Jul 22AOC date

Important info

Result ID
Refer Docs
Award of contract
20/07/2022
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Madhyanchal Vidut Vitran Nigam Limited has published Giving New Connection Of 05 Kw ( Lmv-Ii ) To Shri Rohit Singh , Regional Offier ( Uppcb ) , Address Govnerment Inter College , Bareilly, For The Work Giving Electric Connection Of 150 Kw / 160Kva Hp-1 To Nagar Ayukt Nagar Nigam, Akshar Vihar Lekh Civil Lines- Bareilly, For The Work Of 02 No. St . Pole Sfitingat Motipark Parking , Ghantaghar, Bareilly Undereudd-I Bareilly Under Full Deposit Scheme 2022-23- 1 For The Giving New Connectionof 05 Kw ( Lmv-Ii ) To Shri Rohit Singh , Regional Offier ( Uppcb ) , Address Govnerment Inter College , Bareilly Underfull Deposit Fund- 2022-23 Under Eudd-I Bareilly. 2 Carriage Ofab Cable ( 3X50 Sqmm ) From Central C.B. Ganj To Work Site Including Loading & Unloading At Both End. 3 Carriage Of St Pole11 Mtr. From Central C.B. Ganj To Work Site Including Loading & Unloading At Both End 4 Carriage Of 3-Phase Distribution Box From Central C.B. Ganj To Work Site Including Loading & Unloadingat Both End 5 Carriage Ofother Associatedmaterial From Central C.B. Ganj To Work Site Including Loading & Unloading At Both End 6 Erection Of St Polepole Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete 7 Erating Of Stpole. 8 Laying Of Ab Cable ( 3X50 Sqmm ) 9 Erection Of 3-Phase Distribution Box On Pole. 10 For The Work Giving Electric Connection Of 150 Kw / 160Kva Hp-1 To Nagar Ayukt Nagar Nigam, Akshar Vihar Lekh Civil Lines- Bareillyundereudd-I Bareilly Under Full Deposit Scheme 2022-23. 11 Carriage Of St Pole 11 Mtr. Long From Central C.B. Ganj To Work Site Including Loading & Unloading At Both End. 12 Carriage Ofstay Set From Central C.B. Ganj To Work Site Including Loading & Unloading At Both End. 13 Carriage Of 11 Kv Xlpe Cable ( 3X120 Sqmm. ) From Central C.B. Ganj To Work Site Including Loading & Unloading At Both End.. 14 Carriage Of250 Kva New T / F From Central C.B. Ganj To Work Site Including Loading & Unloading At Both End.. 15 Carriage Of11 Kv Xlpe Cable Jointing Kit ( 3X120 Sqmm ) O / D From Central C.B. Ganj To Work Site Including Loading & Unloading At Both End. 16 Carriage Of 11 Kv Vcb I / Ctr From Central C.B. Ganj To Work Site Including Loading & Unloading At Both End. 17 Carriage Ofother Associatedmaterials From Central C.B. Ganj To Work Site Including Loading & Unloading At Both End. 18 Erection Of St D / Pole Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete 19 Construction Of Plinth Complete ( 1.5X1.5X2.0 ) Meter, By Providing First Class Bricks Work As Per Respo Norms. ( Material Will Be Supplied By Contractor ) With The Work Of Fabrication / Construction And Grouting Of Wire Mesh Fencing. 20 Erection Of250 Kva T / F On Plinth By Laying Of Cable , Jumpering & Commissioning Of T / F 21 Erathing Of Poles . 22 Laying Of 11 Kv Xlpe Cable ( 3X120 Sqmm. ) 23 The Work Of Fabrication / Construction And Grouting Of Wire Mesh Fencing Of 16 Meter Running Length / As Per Site Requirement In Rectangular Shape Height 2 Meter With Angle Size Of 45X45x05 M.M Including Gate At One Side As Per Respo Norms. ( Material Will Be Supplied By Contractor ) . 24 Earthing Of Distribution T / Ffor Body & Neutral Upto Water Level With Gi Pipe Of 1.5” Dia. Including Mild Steel Strip Size 35X6 Mm. ( Material Will Be Supplied By Contractor ) . 25 Erection Of Stay Set Complete. 26 Erection Of 11 Kv Xlpe Cable Jointing Kit ( 3X120 Sqmm ) O / D 27 Mounting And Fixing 11 Kv Vcb On D / P. 28 For The Work Of 02 No. St . Pole Sfitingat Motipark Parking , Ghantaghar, Bareilly Bareillyundereudd-I Bareilly Under Full Deposit Scheme 2022-23. 29 Dismentling Ofstpole Fromexsisiting Place And Shifted To New Place . 30 Erection Of St Polepole Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete At New Place .. Last date of submission for this tender is 2022-07-12. This is a Civil Work tender in Bareilly, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

1 issued
  • Tender Document 1html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in