Madhyanchal Vidut Vitran Nigam Limited
- AOC value
- ₹1.9L
- AOC date
- 20 Jul
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 20 Jul 22AOC date
- -Published
- -Closes
- -Bid opens
- 20 Jul 2022AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 20/07/2022
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Madhyanchal Vidut Vitran Nigam Limited has published Giving New Connection Of 05 Kw ( Lmv-Ii ) To Shri Rohit Singh , Regional Offier ( Uppcb ) , Address Govnerment Inter College , Bareilly, For The Work Giving Electric Connection Of 150 Kw / 160Kva Hp-1 To Nagar Ayukt Nagar Nigam, Akshar Vihar Lekh Civil Lines- Bareilly, For The Work Of 02 No. St . Pole Sfitingat Motipark Parking , Ghantaghar, Bareilly Undereudd-I Bareilly Under Full Deposit Scheme 2022-23- 1 For The Giving New Connectionof 05 Kw ( Lmv-Ii ) To Shri Rohit Singh , Regional Offier ( Uppcb ) , Address Govnerment Inter College , Bareilly Underfull Deposit Fund- 2022-23 Under Eudd-I Bareilly. 2 Carriage Ofab Cable ( 3X50 Sqmm ) From Central C.B. Ganj To Work Site Including Loading & Unloading At Both End. 3 Carriage Of St Pole11 Mtr. From Central C.B. Ganj To Work Site Including Loading & Unloading At Both End 4 Carriage Of 3-Phase Distribution Box From Central C.B. Ganj To Work Site Including Loading & Unloadingat Both End 5 Carriage Ofother Associatedmaterial From Central C.B. Ganj To Work Site Including Loading & Unloading At Both End 6 Erection Of St Polepole Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete 7 Erating Of Stpole. 8 Laying Of Ab Cable ( 3X50 Sqmm ) 9 Erection Of 3-Phase Distribution Box On Pole. 10 For The Work Giving Electric Connection Of 150 Kw / 160Kva Hp-1 To Nagar Ayukt Nagar Nigam, Akshar Vihar Lekh Civil Lines- Bareillyundereudd-I Bareilly Under Full Deposit Scheme 2022-23. 11 Carriage Of St Pole 11 Mtr. Long From Central C.B. Ganj To Work Site Including Loading & Unloading At Both End. 12 Carriage Ofstay Set From Central C.B. Ganj To Work Site Including Loading & Unloading At Both End. 13 Carriage Of 11 Kv Xlpe Cable ( 3X120 Sqmm. ) From Central C.B. Ganj To Work Site Including Loading & Unloading At Both End.. 14 Carriage Of250 Kva New T / F From Central C.B. Ganj To Work Site Including Loading & Unloading At Both End.. 15 Carriage Of11 Kv Xlpe Cable Jointing Kit ( 3X120 Sqmm ) O / D From Central C.B. Ganj To Work Site Including Loading & Unloading At Both End. 16 Carriage Of 11 Kv Vcb I / Ctr From Central C.B. Ganj To Work Site Including Loading & Unloading At Both End. 17 Carriage Ofother Associatedmaterials From Central C.B. Ganj To Work Site Including Loading & Unloading At Both End. 18 Erection Of St D / Pole Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete 19 Construction Of Plinth Complete ( 1.5X1.5X2.0 ) Meter, By Providing First Class Bricks Work As Per Respo Norms. ( Material Will Be Supplied By Contractor ) With The Work Of Fabrication / Construction And Grouting Of Wire Mesh Fencing. 20 Erection Of250 Kva T / F On Plinth By Laying Of Cable , Jumpering & Commissioning Of T / F 21 Erathing Of Poles . 22 Laying Of 11 Kv Xlpe Cable ( 3X120 Sqmm. ) 23 The Work Of Fabrication / Construction And Grouting Of Wire Mesh Fencing Of 16 Meter Running Length / As Per Site Requirement In Rectangular Shape Height 2 Meter With Angle Size Of 45X45x05 M.M Including Gate At One Side As Per Respo Norms. ( Material Will Be Supplied By Contractor ) . 24 Earthing Of Distribution T / Ffor Body & Neutral Upto Water Level With Gi Pipe Of 1.5” Dia. Including Mild Steel Strip Size 35X6 Mm. ( Material Will Be Supplied By Contractor ) . 25 Erection Of Stay Set Complete. 26 Erection Of 11 Kv Xlpe Cable Jointing Kit ( 3X120 Sqmm ) O / D 27 Mounting And Fixing 11 Kv Vcb On D / P. 28 For The Work Of 02 No. St . Pole Sfitingat Motipark Parking , Ghantaghar, Bareilly Bareillyundereudd-I Bareilly Under Full Deposit Scheme 2022-23. 29 Dismentling Ofstpole Fromexsisiting Place And Shifted To New Place . 30 Erection Of St Polepole Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete At New Place .. Last date of submission for this tender is 2022-07-12. This is a Civil Work tender in Bareilly, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free