🎉 Your free trial plan has started. Plan will expire in 0 days

Madhyanchal Vidut Vitran Nigam Limited

ayodhya, uttar pradesh

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Madhyanchal Vidut Vitran Nigam Limited has published Tender For Increasing Capacity Of Transformers At Different Places And Construction Of Transformer Plinth And Fencing Of Transfomer Under Electricity Distribution Division-Rudauli, Ayodhya- 1 Part - A ( Material ) Following Material Supplied By The Contractor:- 2 F- Bracket 3 Clamp For Top, T-Off Channel 4 Holding Clamp With Nut And Bolt 5 Stay Clamp 6 Stay Insulator 7 Suspension Clamp 8 Dead And Clamp 9 Lt Clamp For Pcc Pole 10 Copper L Pices For 250 Kva T / F 11 Copper L Pices For 400 Kva T / F 12 Aluminum Lug 100 Kva T / F 13 Aluminum Lug 250 Kva T / F 14 Aluminum Lug 400 Kva T / F 15 Holding Clamp Top &Dropper Channel 16 Stone Pad 17 I Hook 18 Nut & Bolt 19 Carriage Including Loading, Unloading & Proper Stacking Of Following Stockmaterials From Store / Departmental Store To Dump Site Distance 0 To 70 Kms. ( Distance Approx ) 20 Pcc Pole 8.5 Mtr. Long 21 Xlpe Cable 1X240 Sqmm 22 Xlpe Cable 1X400 Sqmm 23 Xlpe Cable 1X630 Sqmm 24 Ab Cable 3X50 25 Ab Cable 3X95+1X701x16 26 Ab Cable 3X120+1X951x16 27 Acsr Weasel Conductor 28 Transformer 25 Kva 29 Transformer 63 Kva 30 Transformer 250 Kva 31 Transformer 400 Kva 32 Three Phase Distribution Box 33 Other Matching Materials 34 Dragging Of Pcc / St Pole From Dump Site To Pit Site 35 Fabrication And Errection Of Doublepole Support On Pcc / St Pole Pole Including Grouting With 1:4:8 Ratio Cement, Sand & Brick Ballast& Including Digging Of Pit And Fixing Of All Accessories Clamp & Earthing As Per Responorms. ( Cost Of Clamps Borne By Contractor ) 36 Fabrication And Errection Of Singlepole Support On Pcc / St Pole Pole Including Grouting With 1:4:8 Ratio Cement, Sand & Brick Ballast& Including Digging Of Pit And Fixing Of All Accessories Clamp & Earthing As Per Responorms. ( Cost Of Clamps Borne By Contractor ) 37 Stringing, Sagging, Binding And Jumpering Of Acsr Conductor As Per Resspo Norms 38 Stringing, Sagging, Binding And Jumpering Of Ab Cable 3X50 Conductor As Per Resspo Norms 39 Stringing, Sagging, Binding And Jumpering Of Ab Cable3x95+1X701x16 Conductor As Per Resspo Norms 40 Stringing, Sagging, Binding And Jumpering Of Ab Cable 3X120+1X951x16 Conductor As Per Resspo Norms 41 Grouting And Binding Of Stay With In 1:4:8 Ratio With Cement, Sand And Brick Ballast Including Cost Of All Grouting Materials As Per Resspo Norms 42 Earthing Of Poles As Per Respo Norms 43 Constructionof Transformer Plinth Including Excavation Of Foundation, Base Concreting Of 1:6:12 ( Cement Mortar Of Ratio 1:4 Foundation, Cc In 1:4:8 Ratio ( Cement Fine Sand And Brick Ballast ) And Rcc Work With Ratio 1:2:4 Cement, Coarse Sand And Stone Grit Of 20 Mm Gause As Per Resspo Norms 44 Fencing Of Transformer Plinth With The Help Of Wire Mesh / Barbed Wire After Grouting Proper Size Of Angle As Per Resspo Norms. Inclusive Of All Material Such As Wiremesh / Barbed Wire, Angle Flats, Nut Bolts Etc. 45 Repairing Of Old Transformer Plinth Including Excavation Of Foundation, Base Concreting Of 1:6:12 ( Cement Mortar Of Ratio 1:4 Foundation, Cc In 1:4:8 Ratio ( Cement Fine Sand And Brick Ballast ) And Rcc Work With Ratio 1:2:4 Cement, Coarse Sand And Stone Grit Of 20 Mm Gause As Per Resspo Norms 46 Earthing By Way Of Boring And Lowering Of B Class G.I. Pipe 50 Mm Dia 20 Mtr. Long From Ground Upto The Water Lavel It Will Be Connected To The G.S. Strip For T / F Nutral Connection The Earth Strip Will Be Welded To The G.I. Pipe The Work Also Included Top Cap And Clamps For Pouring Water The Cost Of All Material Will All Labour And T N P Etc. Complete In All Respect . ( All The Material Will Be Supplied By The Contractor. ) 47 Erection & Commissioning Of Of3 Phase / Single Phase Distribution Box With Help Of Clamps ( Cost Of Clamp & Bolt & Nuts Shall Be Borne By Contactor ) As Per Norms. 48 Mounting Of 25Kva Transformer As Per Resspo Norms. 49 Mounting Of 63Kva Transformer As Per Resspo Norms. 50 Mounting Of 250Kva Transformer As Per Resspo Norms. 51 Mounting Of 400Kva Transformer As Per Resspo Norms. 52 Connection Of L.T. Xlpe Cable Different Size 53 Rect. Back Old And Used 10 Kva T / F 54 Rect. Back Old And Used 16 Kva T / F 55 Rect. Back Old And Used 100 Kva T / F 56 Rect. Back Old And Used 250 Kva T / F. Last date of submission for this tender is 2023-10-06. This is a Electrification Work tender in Ayodhya, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

3 issued
  • Tender Document 1html
  • Tender Document 2xlsx
  • Tender Document 3pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in