🎉 Your free trial plan has started. Plan will expire in 0 days

Madhyanchal Vidut Vitran Nigam Limited

bareilly, uttar pradesh

AOC value
₹4.78L
AOC date
9 Sep
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 9 Sep 24AOC date

Important info

Result ID
Refer Docs
Award of contract
09/09/2024
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Madhyanchal Vidut Vitran Nigam Limited has published Different Works Under Eudd-I Bareilly, For Strengthening Of Electrification System Under Eudd-I, Under Business Plan-2024-25 Bareilly-2 Carriage Of Following Materials From E.S.Cs Store C.B Ganj To Work Site Including Loading & Unloading 3 St Pole 11 Meter Long 4 11 Kv Cable Jointing Kit O / D ( 3X120 Sqmm ) 5 11 Kv Xlpe Cable ( 3X120 Sqmm ) 6 Lt Xlpe Cable ( 1X400 Sqmm ) 7 Ab Cable ( 3X120 Sqmm. ) 8 New 250 Kva T / F 9 Weasel Conductor 10 3-Phase Distribution Box 11 Other Associatedmaterials 12 Erection Work 13 Erection Of S.T. D / Pole Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 14 Erection Of S.T.Pole Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 15 Concreting Of St Poles. 16 Earthingofpoles . 17 Earthing Of Distribution T / Ffor Body & Neutral Upto Water Level With Gi Pipe Of 1.5 Dia. Including Mild Steel Strip Size 35X6 Mm. ( Material Will Be Supplied By Contractor ) . 18 Erection Of 250 Kva T / F On D / Pole By Laying Of Cable , Jumpering & Commissioning Of T / F . 19 Stringing And Sagging Ab Cable ( 3X120 Sqmm. ) 20 Lying Of Lt Xlpe Cable 1X400 Sqmm. 21 Erection And Fixing 11 Kv Cable Jointing Kit O / D ( 3X120 Sqmm ) 22 Laying Of 11 Kv Xlpe Cable 23 Hoisting Of 11 Kv Xlpe Cable ( 3X120 Sqmm ) On Double Pole Bote With Gi Pipe Of Size 6 Dia Including The Jumpering Complete With Clamps , Nut And Bolts 24 Laying Of Weasel Conductor 25 Erection And Fixing 3-Phase Distribution Box And Making All Connections 26 Providing & Fixing Of Cross Holding Clamps . 27 Providing & Fixing Of Stone Pad 28 Providing & Fixing Of Barbed Wire 29 Providing And Fixing Piercing Connector 30 Providing And Fixing Lug ( 400 Sqmm ) 31 Fixing Of Associated Items I.E.., Top Channel-02 ., Pin Insulator With Pin-06 No 32 Workofincreasingcapacity Of Distribution T / F From 100 Kva To 250 Kva At Dooda Under Eudd-I Bareilly For Strengtheningofelectrification System Under Eudd-I, Under Business Plan-2024-25 Bareilly 33 Carriage Of Following Materials From E.S.Cs Store C.B Ganj To Work Site Including Loading & Unloading 34 New 250 Kva T / F 35 Lt Xlpe Cable ( 3.5X70 Sqmm ) 36 Other Associatedmaterials 37 Dismantling Ofold 100 Kva T / F From Site And Back Carriage From Site To E.S.Cs Store C.B Ganj Including Loading & Unloading 38 Construction Of Plinth Complete ( 2.0X2.0X1.5 ) Meter, By Providing Firstclass Bricks Work As Per Respo Norms. ( Material Will Be Supplied By Contractor ) . 39 Erection Of New 250 Kva T / F On Plinth By Laying Of Cable , Jumpering & Commissioning Of T / F . 40 The Work Of Fabrication / Construction And Grouting Of Wire Mesh Fencing Of 16 Meter Running Length / As Per Site Requirement In Rectangular Shape Height 2 Meter With Angle Size Of 45X45x05 M.M Including Gate At One Side As Per Respo Norms. ( Material Will Be Supplied By Contractor ) . 41 Earthing Of Distribution T / Ffor Body & Neutral Upto Water Level With Gi Pipe Of 1.5 Dia. Including Mild Steel Strip Size 35X6 Mm. ( Material Will Be Supplied By Contractor ) . 42 Laying Of Weasel Conductor. 43 Laying Oflt Xlpe Cable ( 3.5X70 Sqmm ) 44 Providing And Fixing Of Tell-Less Unit ( 600 Amp. ) 45 Providing And Fixing Al. Lugs ( For 240 Sqmm. ) Cable 46 Workofincreasingcapacity Of Distribution T / F From 100 Kva To 250 Kva At Dooda Under Eudd-I Bareilly For Strengtheningofelectrification System Under Eudd-I, Under Business Plan-2024-25 Bareilly 47 Carriage Of Following Materials From E.S.Cs Store C.B Ganj To Work Site Including Loading & Unloading 48 11 Kv Xlpe Cable ( 3X120 Sqmm ) 49 St Pole ( 11 Mtr Long ) 50 11 Kv Xlpe Cable Jointing Kit O / D ( 3X120 Sqmm ) 51 11 Kv Xlpe Cable Jointing Kit I / D ( 3X120 Sqmm ) 52 11 Kv Xlpe Cable Straight Through I / D ( 3X120 Sqmm ) 53 Stay Set Complete 54 Other Line Material I.E., 11 Kv Pin Insulater / Stay / Earthing Complete / Dropper Channel / Top Channel Etc. 55 Erection Work 56 Erection Of Single / Double Pole In H.T / L.T Lines Including Fitting Of All Accessories As Per Resspo Norms 57 St Pole 11 Mtr Long ( Double ) 58 Grouting Of Pole With 1:4:8 Mixture In Size ( 450X450x1500mm. ) Including Cost Of Cement / Bb & Sand Required As Per Resspo Norms 59 Erathing Of St Pole As Per Resspo Norms 60 Underground Laying Of 11 Kv Xlpe 3X120 Sq Mm Cable In Single Circuit ( In Hdd Method In Hdd Pipe ) Complete In All Respect Along With Road Restoration ( Hdd Pipe Shall Be Provided By Contractor ) 61 Supply & Fixing Of Hdpe Pipe ( With Hdd Method ) Complete In All Respect Along With Road Restoration. 62 Hoisting Of 11 Kv Xlpe Cable ( 3X185 Sqmm ) On Double Pole Bote With Gi Pipe Of Size 6 Dia Including The Jumpering Complete With Clamps , Nut And Bolts 63 Supply & Laying Of 6 Dia G Pipe At Various Places I.E Road Crossing & Hoisting Etc. Complete In All Respect ( Iso Certified Gi Pipe 150 Nb 3 Mm Thick Dia 6 Would Be Provided By Contractor Through Approved Vendors Of Discom At His Own Cost ) 64 Fixing Of Outdoor11 Kv Cable Boxes For 3X185 Sqmm Xlpe Cable Complete In All Respect 65 Fixing Of 11 Kv Cable Boxes S / Through For 3X185 Sqmm Xlpe Cable Complete In All Respect 66 Fixing Ofindoor11 Kv Cable Boxes For 3X185 Sqmm Xlpe Cable Complete In All Respect 67 Fabricationof 11 Kv Fuse Set Installed On D / Pole Structure . 68 For The Work Of Replacement Of 33 Kv Control Pannel& Work Ofreplacement Of 33 Kv Breaker At 33 / 11 Kv S / S Sadar Cantt For Strengtheningofelectrification System Under Eudd-I, Under Business Plan-2024-25 Bareilly 69 Carriage Of Following Materials From E.S.Cs Store C.B Ganj To Work Site Including Loading & Unloading 70 33 Kv Breaker 71 33 Kv Control Panel 72 Installation Of Following New Equipment’S On Their Respective Structures Including Mechanical & Electrical Fixing After Proper Adjustment On Their Structure. ( All T& P, Nuts, Bolts & Clamps Shall Be Provided By Contractor. 73 Installationofnew 33 Kv Control Panel For Double T / F 74 Replacementof Defective Control Cableform Panel To Vcb 2*2.5 Sq Mmarmoured Cable ( Supplied By Contractor ) 75 Replacement Of Defective Control Cableform Panel To Vcb 4*2.5Sq Mm Armoured Cable ( Supplied By Contractor ) 76 Installationof33 Kv Breaker. Last date of submission for this tender is 2024-04-19. This is a Civil Work tender in bareilly, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

7 issued
  • Tender Document 1html
  • Tender Document 2pdf
  • Tender Document 3xlsx
  • Tender Document 4pdf
  • Tender Document 5pdf
  • Tender Document 6pdf
  • Tender Document 7pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in