Madhyanchal Vidut Vitran Nigam Limited

work, uttar pradesh

AOC value
₹16.97L
AOC date
12 Feb
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 12 Feb 20AOC date

Important info

Result ID
Refer Docs
Award of contract
12/02/2020
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Madhyanchal Vidut Vitran Nigam Limited has published Corrigendum - Running Contract For Business Plan Works Under Edd-I , Bareilly Electrical Work Material Supply Work - Safe Carriage 1.01 Pcc Pole 8.5 Meter Long. 200 Nos. 3 1.02 Stp 11 Mtr Long 50 Nos. 4 1.03 Line Material I.E., Cross Arm / Conductor / Pin Insulater / Stay / Earthing Rod / Disc Fitting / Disc Insulators / 11 Kv Xlpe Cable Etc 5 Transformer 10 2 Erection Of New Pcc Single / Double Pole In H.T / L.T Lines Including Fitting Of All Accessories As Per Resspo Norms 11 2.01 Pcc Pole 8.5 Mtr Long Single Pole 110 Nos. 12 2.02 Pcc Pole 8.5 Mtr Long Double Pole 45 Nos. 13 2.03 St Pole 11 Mtr Long Single Pole. 40 Nos. 14 2.04 St Pole 11 Mtr Long Double Pole. 5 Nos. 15 3 Grouting With 1:4:8 Mixture In Size ( 450X450x1500mm. ) Including Cost Of Cement / Bb & Sand Required As Per Resspo Norms 16 3.01 Pcc Pole 18 3.03 St Pole 21 5 Dismentaling Of Old And Damaged Conducor Complete In All Respect 2 Km 22 6 Dismentaling Of Existing Distribution Transformer 28 8.01 Acsr Weasal Conductor 15 Km. 29 8.02 Acsr Rabbit Conductor 1 Km. 30 8.03 Acsr Dog Conductor 1 Km. 31 8.04 3 Phase Arial Bunched Conductor 10 Km. 32 8.05 1 Phase Arial Bunched Conductor 5 Km. 33 9 Under Ground Laying Of Following Cable 34 9.01 11 Kv Xlpe Cable , Igging Of Pits, Erection Of Stay Clamp, Insulator Etc. , 38 11 Grouting Of Stays, 1:4:8 Cc Ratio ( 600X600x300mm. ) As Per Respo Norms. 75 Nos. 39 12 Construction Of T / F Plinth 1.5X1.5X2 M3 For Mounting 250 / 400 Kva T / F Including Foundation Work ( Below Ground 0.5 M ) , Brick Work, Rcc Slab Of 4” Thickness And Plastering In 1:6 Ratio With 02 Nos Channel Pieces Of 1.5 Mtr Long Of Size 100X50x6 Mm Compete In All Respect 5 Nos 40 13 Cage Fencing Of 250 / 400 Kva Plinth Mounted Transformer , Mounting Of Transformers 15 Fixing Of Distribution Box Complete In All Respect 50 Nos. 48 16 Guarding At Road Crossing Complete In All Respect 20 Nos. 49 17 Straightening Of Tilted Pole Complete In All Respect 50 18 Replacement Of Wooden X-Anmn Complete In All Respect 51|19 Replacement Af Damaged 11 Kw’ Pie ‘Disc Insulator Complete In All Respect 52 20 Replacement Of Damaged 33 Ko’ Pin ‘Dise Insulator Complete Ni All Respect Safe Back Caniage Of Followng Item ( If Any ) From Work 53 21 Site To C.B. Ganj Store Barellly Approx Distance Upto 10- 80 Km Inchiding Loading & Unloading 54 / 21.O1 Scrap ( Line Mateia ) Transformer 58 22 Tree Cutting. Last date of submission for this tender is 2019-11-07. This is a Electrical Maintenance tender in Work, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

No Documents Found

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in