Madhyanchal Vidut Vitran Nigam Limited
- AOC value
- ₹3.86L
- AOC date
- 15 Mar
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 15 Mar 24AOC date
- -Published
- -Closes
- -Bid opens
- 15 Mar 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 15/03/2024
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Madhyanchal Vidut Vitran Nigam Limited has published Tender For Different Works Under Full Deposited Fund-2023-24 Under Eudd-Iv, Bareilly-- 1 Forthe Work Of Giving New Connection Of 500 Kvato M / S Mahajeevandeeps Mediccare Pvt. Ltd. C / O Shri Manish Goyal S / O S.C. Goyal Tulasherpur Bareillyyunder Full Deposited Fund-2023-24 Under Eudd-Iv, Bareilly. 2 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 3 11 Kv Pilfer Proof Metering Cubical Ctr ( 30 / 5 Amp ) 4 11 Kv Xlpe Cable ( 3X185 Sqmm ) 5 11 Kv Cable Jointing Kits O / D ( 3X85 Sqmm ) 6 Stay Set 7 St. Pole ( 11 Meter Long ) 8 Other Line Materials 9 Erection Work 10 Erection Of St D / Pole Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 11 Laying Of Lt Xlpe Cable ( 1X185 Sqmm ) In Double Circuit 12 Hoisting Of. 40Meter 11 Kv Xlpe Cable On D / Poles Situated At Both Side Of Road Including Cost Of20 Meter6 Inch Dia G.I Pipe ( Material Will Be Supplied By Contractor ) .. 13 Ercetion & Fixing 11 Kv Cable Jointing Kits O / D ( 3X85 Sqmm ) 14 Earthing Of Poles By Ms Earthing Rod . 15 Erection And Fixing 11 Kv Pilfer Proof Metering Cubical Ctr ( 30 / 5 Amp ) 16 Erection Of Stay Set Complete . 17 Road Restroration Charges Of Foothpathside 18 Fixing Of Associated Items I.E.Top Channel- 01 No., Dropper Chanel- 01, Base Angle- 02, , Etc. 19 Forthe Work Of Giving New 02 Kw Temperary Connection To Mr. Gendan Lala S / O Choori Lal, 507 Village Chandpuri Bichpuri, Bareilly Under Full Deposited Fund-2023-24 Under Eudd-Iv, Bareilly.. 20 St Pole 11 Mtr. Long 21 Stay Setcomplete 22 New 25 Kva 11 / 0.4 Kv T / F 23 Acsr Weasel Conductor 24 11 Kv Xlpe Cable Jointing Kit O / D ( 3X120sqmm ) 25 11 Kv Xlpe Cable ( 3X120 Sqmm ) 26 Other Line Materials 27 Erection Work 28 Erection Of St D / Pole ( 11 Meter Long ) Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 29 Laying Of Acsr Weasel Conductor. 30 Laying Of11 Kv Xlpe Cable ( 3X120 Sqmm ) 31 Hoisting Of. 30Meter 11 Kv Xlpe Cable On D / Poles Situated At Both Side Of Road Including Cost Of35 Meter6 Inch Dia G.I Pipe ( Material Will Be Supplied By Contractor ) .. 32 Filling Of 11 Kv Xlpe Cablejointing Kit O / D ( 3X120 Sqmm ) 33 Earthing Of Poles By Ms Earthing Rod . 34 Erection Of Stay Set Complete In All Respect. 35 Mounting25 Kva T / F Or Newly Erected D / Pole Alongwith Making All Connections 36 Earthing Of T / F 37 Fixing Of Associated Items I.E.Holding Clamp- 08 No., 11 Kv Pin Insulator-09 No. Base Angle-02 Nos., Top Channel- 01 No., Droper Channel- 03 Etc. 38 Forthe Work Of Giving 150 Kva Commercial Connection To M / S Cheer Hotel And Resort C / O Hakim Singh S / O Mr. Harish Chandra Navada Shekhan Pilibhit By Pass Bareilly Under Full Deposited Fund-2023-24 Under Eudd-Iv, Bareilly.. 39 St Pole 11 Mtr. Long 40 Staysetcomplete 41 11 Kv Pilfer Proof Metering Cubical 42 11 Kv Xlpe Cable Jointing Kit O / D ( 3X70sqmm ) 43 11 Kv Xlpe Cable ( 3X70 Sqmm ) 44 Other Line Materials 45 Erection Work 46 Erection Of St D / Pole ( 11 Meter Long ) Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 47 Laying Of 11 Kv Xlpe Cable ( 3X70 Sqmm ) 48 Hoisting Of. 30Meter 11 Kv Xlpe Cable On D / Poles Situated At Both Side Of Road Including Cost Of14 Meter6 Inch Dia G.I Pipe ( Material Will Be Supplied By Contractor ) .. 49 Erection And Fixing 11 Kv Pilfer Proof Metering Cubical 50 Earthing Of Poles By Ms Earthing Rod . 51 Filling Of 11 Kv Xlpe Cablejointing Kit O / D ( 3X70 Sqmm ) 52 Erection Of Stay Set Complete 53 Fixing Of Associated Items I.E.Holding Clamp- 04 No., . Base Angle-02 Nos., Top Channel- 01 No., Dropper Channel- 01 Etc.. Last date of submission for this tender is 2024-02-29. This is a Electrification Work tender in bareilly, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
7 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3xlsxXLSX document
- Tender Document 4pdfPDF document
- Tender Document 5pdfPDF document
- Tender Document 6pdfPDF document
- Tender Document 7pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free