🎉 Your free trial plan has started. Plan will expire in 0 days

Madhyanchal Vidut Vitran Nigam Limited

bareilly, uttar pradesh

AOC value
₹3.86L
AOC date
15 Mar
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 15 Mar 24AOC date

Important info

Result ID
Refer Docs
Award of contract
15/03/2024
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Madhyanchal Vidut Vitran Nigam Limited has published Tender For Different Works Under Full Deposited Fund-2023-24 Under Eudd-Iv, Bareilly-- 1 Forthe Work Of Giving New Connection Of 500 Kvato M / S Mahajeevandeeps Mediccare Pvt. Ltd. C / O Shri Manish Goyal S / O S.C. Goyal Tulasherpur Bareillyyunder Full Deposited Fund-2023-24 Under Eudd-Iv, Bareilly. 2 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 3 11 Kv Pilfer Proof Metering Cubical Ctr ( 30 / 5 Amp ) 4 11 Kv Xlpe Cable ( 3X185 Sqmm ) 5 11 Kv Cable Jointing Kits O / D ( 3X85 Sqmm ) 6 Stay Set 7 St. Pole ( 11 Meter Long ) 8 Other Line Materials 9 Erection Work 10 Erection Of St D / Pole Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 11 Laying Of Lt Xlpe Cable ( 1X185 Sqmm ) In Double Circuit 12 Hoisting Of. 40Meter 11 Kv Xlpe Cable On D / Poles Situated At Both Side Of Road Including Cost Of20 Meter6 Inch Dia G.I Pipe ( Material Will Be Supplied By Contractor ) .. 13 Ercetion & Fixing 11 Kv Cable Jointing Kits O / D ( 3X85 Sqmm ) 14 Earthing Of Poles By Ms Earthing Rod . 15 Erection And Fixing 11 Kv Pilfer Proof Metering Cubical Ctr ( 30 / 5 Amp ) 16 Erection Of Stay Set Complete . 17 Road Restroration Charges Of Foothpathside 18 Fixing Of Associated Items I.E.Top Channel- 01 No., Dropper Chanel- 01, Base Angle- 02, , Etc. 19 Forthe Work Of Giving New 02 Kw Temperary Connection To Mr. Gendan Lala S / O Choori Lal, 507 Village Chandpuri Bichpuri, Bareilly Under Full Deposited Fund-2023-24 Under Eudd-Iv, Bareilly.. 20 St Pole 11 Mtr. Long 21 Stay Setcomplete 22 New 25 Kva 11 / 0.4 Kv T / F 23 Acsr Weasel Conductor 24 11 Kv Xlpe Cable Jointing Kit O / D ( 3X120sqmm ) 25 11 Kv Xlpe Cable ( 3X120 Sqmm ) 26 Other Line Materials 27 Erection Work 28 Erection Of St D / Pole ( 11 Meter Long ) Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 29 Laying Of Acsr Weasel Conductor. 30 Laying Of11 Kv Xlpe Cable ( 3X120 Sqmm ) 31 Hoisting Of. 30Meter 11 Kv Xlpe Cable On D / Poles Situated At Both Side Of Road Including Cost Of35 Meter6 Inch Dia G.I Pipe ( Material Will Be Supplied By Contractor ) .. 32 Filling Of 11 Kv Xlpe Cablejointing Kit O / D ( 3X120 Sqmm ) 33 Earthing Of Poles By Ms Earthing Rod . 34 Erection Of Stay Set Complete In All Respect. 35 Mounting25 Kva T / F Or Newly Erected D / Pole Alongwith Making All Connections 36 Earthing Of T / F 37 Fixing Of Associated Items I.E.Holding Clamp- 08 No., 11 Kv Pin Insulator-09 No. Base Angle-02 Nos., Top Channel- 01 No., Droper Channel- 03 Etc. 38 Forthe Work Of Giving 150 Kva Commercial Connection To M / S Cheer Hotel And Resort C / O Hakim Singh S / O Mr. Harish Chandra Navada Shekhan Pilibhit By Pass Bareilly Under Full Deposited Fund-2023-24 Under Eudd-Iv, Bareilly.. 39 St Pole 11 Mtr. Long 40 Staysetcomplete 41 11 Kv Pilfer Proof Metering Cubical 42 11 Kv Xlpe Cable Jointing Kit O / D ( 3X70sqmm ) 43 11 Kv Xlpe Cable ( 3X70 Sqmm ) 44 Other Line Materials 45 Erection Work 46 Erection Of St D / Pole ( 11 Meter Long ) Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 47 Laying Of 11 Kv Xlpe Cable ( 3X70 Sqmm ) 48 Hoisting Of. 30Meter 11 Kv Xlpe Cable On D / Poles Situated At Both Side Of Road Including Cost Of14 Meter6 Inch Dia G.I Pipe ( Material Will Be Supplied By Contractor ) .. 49 Erection And Fixing 11 Kv Pilfer Proof Metering Cubical 50 Earthing Of Poles By Ms Earthing Rod . 51 Filling Of 11 Kv Xlpe Cablejointing Kit O / D ( 3X70 Sqmm ) 52 Erection Of Stay Set Complete 53 Fixing Of Associated Items I.E.Holding Clamp- 04 No., . Base Angle-02 Nos., Top Channel- 01 No., Dropper Channel- 01 Etc.. Last date of submission for this tender is 2024-02-29. This is a Electrification Work tender in bareilly, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

7 issued
  • Tender Document 1html
  • Tender Document 2pdf
  • Tender Document 3xlsx
  • Tender Document 4pdf
  • Tender Document 5pdf
  • Tender Document 6pdf
  • Tender Document 7pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in