Madhyanchal Vidut Vitran Nigam Limited
- AOC value
- ₹4.98L
- AOC date
- 12 Jul
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 12 Jul 23AOC date
- -Published
- -Closes
- -Bid opens
- 12 Jul 2023AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 12/07/2023
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Madhyanchal Vidut Vitran Nigam Limited has published Running Contract For Maintenance Of Line Damaged Due To Daiviya Apda / Accident / Other Special Reasons Under Edd-Ii, Bareilly ( Oandm ) - 1 The Work Of Safe Carriage Of The Following Material From Cb Ganj Store Center To Work Siteunder The Jurisdiction Of Edd-I, Bareilly. Approx. Distance Upto 10-80 Km. Including Safe Loading And Unloading. 2 Pcc Pole 8.5 Meter Long. 3 Pcc Pole 9 Meter Long. 4 Stp 9 Mtr Long 5 Stp 11 Mtr Long 6 Line Material I.E., Cross Arm / Conductor / Pin Insulater / Stay / Earthing Rod / Disc Fitting / Disc Insulators / 11 Kv Xlpe Cable Etc 7 Erection Of New Pcc Single / Double Pole In H.T / L.T Lines Including Fitting Of All Accessories As Per Resspo Norms 8 Pcc Pole 8.5 Meter Long. 9 Pcc Pole 9 Meter Long. 10 Stp 9 Mtr Long 11 Stp 11 Mtr Long 12 Grouting With 1:4:8 Mixture In Size ( 450X450x1500mm. ) Including Cost Of Cement / Bb & Sand Required As Per Resspo Norms 13 Pcc Pole 8.5 Meter Long. 14 Pcc Pole 9 Meter Long. 15 Stp 9 Mtr Long 16 Stp 11 Mtr Long 17 The Work Of Driving The Earthing Electrode And Making Connections With 6 S.W.G. Gi Wire As Per Resspo Norms 18 Resagging Of Loose Conductor / Abc ( Single Wire ) As Per Norms Complete In All Respect 19 Laying, Stringing & Sagging Of Following Conductor Complete In All Respect 20 Acsr Weasal Conductor 21 Acsr Rabbit Conductor 22 Acsr Dog Conductor 23 Acsr Raccoon Conductor 24 The Work Of Digging Of Pits, Erection Of Stay Clamp, Insulator Etc. 25 Grouting Of Stays, 1:4:8 Cc Ratio ( 600X600x300mm. ) As Per Respo Norms. 26 Straightening Of Tilted Pole Complete In All Respect 27 Replacement Of Broken X-Arm Complete In All Respect 28 Replacement Of Damaged 11 Kv Pin / Disc Insulator Complete In All Respect 29 Replacement Of Damaged 33 Kv Pin / Disc Insulator Complete In All Respect 30 Cutting Of Tree Branches 31 Safe Back Carriage Of Following Item ( If Any ) From Work Siteto C.B. Ganj Store Bareilly Approx Distance Upto 10-80 Km Including Loading & Unloading. 32 Scrap ( Line Material ) . Last date of submission for this tender is 2023-07-06. This is a Electrification Work tender in Bareilly, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
7 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3xlsxXLSX document
- Tender Document 4pdfPDF document
- Tender Document 5pdfPDF document
- Tender Document 6pdfPDF document
- Tender Document 7pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free