Madhyanchal Vidut Vitran Nigam Limited
ee eudd-iv bareilly, uttar pradesh
- AOC value
- ₹1.52L
- AOC date
- 12 Mar
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 12 Mar 21AOC date
- -Published
- -Closes
- -Bid opens
- 12 Mar 2021AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 12/03/2021
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Madhyanchal Vidut Vitran Nigam Limited has published The Different Work Under Full Deposited Fund -2020-21 Under Eudd-Iv , Bareilly .-1 For The Wok Of Supply For New Connection 09 Kw ( Lmv-6 ) To Smt. Champa Devi W / O Shri Lala Ram Dohara Road Near Fouji Ata Chakki Under Full Deposited Fund -2020-21 Under Eudd-Iv, Bareilly Under Eudc, Bareilly. 1.01 Safe Carriage Of Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. A- St Pole 11 Mtr. Long – 02 Nos. B Acsr Weasel Conductor -60 Mtr. Nc- 25 Kva T / F New-01 Nd- Other Line Materials- 450 Kgs N 1.02 Erection Of D / Pole Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 1.03 Earthing Of St Pole 1.04 Mounting Of And Installation Of 25 Kva T / F On D / Pole Along With Making All Connections 1.05 Sagging Of 60 Mtr Weasel Conductor For Jumpering 1.06 Erection And Fixing Stay Set Complete 1.07 Fixing Of Associated Items I.E Top Channel-01, 11 Kv Pin Insulator With Pin-09 No., Etc. 2 For The Wok Of Supply For Tc Connection 35 Kw To M / S Unity Aurum Construction Pvt. Ltd, C / O Shri Sushil Kumar Upadhay Dohara Road Bareilly Under Full Deposited Fund -2020-21 Under Eudd-Iv, Bareilly Under Eudc, Bareilly. 2.01 Safe Carriage Of Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. A- St Pole 11 Mtr. Long – 02 Nos. B 11 Kv Xlpe Cable ( 3X70 Sqmm ) - 15 Mtr. Nc- 63 Kva T / F New-01 Nd- 11 Kv Cable Jointing Kit O / D- 02 No. Nd- Other Line Materials- 450 Kgs. 2.02 Erection Of D / Pole Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 2.03 Earthing Of St Pole 2.04 Mounting Of And Installation Of 63 Kva T / F On D / Pole Along With Making All Connections 2.05 Laying Of 15 Mtr 11 Kv Xlpe Cable ( 3X70 Sqmm ) 2.06 Erection And Fixing Stay Set Complete. 2.07 Erection And Fixing 11 Kv Cable Jointing Kit O / D 2.08 Installation Of 3 Phase Meter 2.09 Fixing Of Associated Items I.E Top Channel-01, 11 Kv Pin Insulator With Pin-09 No. Etc. 3 For The Work Of Shifting Or 11 Kv Line From The Plote Of Abhay Prathap Singh Ashok Vihar Pilibhit By Pass Behind Bajrang Dhava Bareilly Under Full Deposited Fund -2020-21 Under Eudd-Iv, Bareilly Under Eudc, Bareilly. 3.01 Safe Carriage Of Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. A- 11 Kva Xlpe Cable ( 3X70 Sqmm. ) 60 Mtr B- 11 Kv Xlpe Cable Jointing Kit ( 3X70 Sqmm ) O / D- 02 No N 3.02 Laying Of 11 Kv Xlpe Cable ( 3X70 Sqmm. ) 3.03 Erection And Fixing Cable Jointing Kit ( 3X70 Sqmm ) O / D 4 For The Wok Of Electrification Of M / S Kuber Homes, Awasiya Colony Park Pilibhit By Pass Road Bareilly Under Full Deposited Fund -2020-21 Under Eudd-Iv, Bareilly Under Eudc, Bareilly. 4.01 Safe Carriage Of Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. A- St Pole 11 Mtr. Long – 02 Nos. B Pcc Pole- 08 No. Nc- 03 Phase Distribution Box-06 No. Nd- Lt Abc Cable ( 3X120+1X95+1X60 Sqmm ) - 325 Mtr Ne- Acsr Weasel Conductor-80 Mtr Nf- New 100 T / F- 01 No . Nd- Other Line Materials- 650 Kgs. 4.02 Erection Of D / Pole Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 4.03 Sagging Of Lt Abc Cable ( 3X120+1X95+1X60 Sqmm ) 4.04 Sagging Of 80 Mtr Acsr Weasel Conductor For Jumpering 4.05 Mounting Of And Installation Of 100 Kva T / F On D / Pole Along With Making All Connections 4.06 Earthing Of St Pole 4.07 Erection Of Pcc Pole Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 4.08 Erection Of Stay Set Complete 4.09 Erection And Fixing 3 Phase Distribution Box Along With Making All Connection 4.1 Fixing Of Associated Items I.E Top Channel-01, 11 Kv Pin Insulator With Pin-06 No., Disc Insulator-06 No., Disc Fitting- 06 No. Pearsing Connector-24 Etc. Last date of submission for this tender is 2021-01-14. This is a Electrification Work tender in Ee Eudd-iv Bareilly, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
No Documents Found
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free