Madhyanchal Vidut Vitran Nigam Limited
- AOC value
- ₹4.35L
- AOC date
- 14 Jun
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 14 Jun 24AOC date
- -Published
- -Closes
- -Bid opens
- 14 Jun 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 14/06/2024
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Madhyanchal Vidut Vitran Nigam Limited has published Tender For Electrical Deposit Work Under Eudd-Ii Bareilly, Different Electrification Work Under Deposit Scheme 2024-25 Under Eudd-Ii Bareilly, 1 Forthe Work Of Giving New Connection Of 02 Kw ( Lnv-1 ) To Smt. Naresh Kumari , Golul Dham Colony , Bareilly Under Full Deposited Fund-2024-25 Under Eudd-Ii, Bareilly. 2 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 3 Pcc Pole ( 8.5 Metre Long ) 4 Distribution Box 03 Phase 5 Abc Cable ( 3X50 Sqmm ) 6 Stay Set 7 Erection Work 8 Erection Of Pcc Pole Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 9 Laying , Stringing &Sagging Of A B Cable ( 3X50 Sqmm ) 10 Erection Of Stay Set With Graouting 11 Fixing Of Distribution Box Alongwith Making All Connections . 12 Providing & Fixing Of Suspention Clamps Wiyth I-Hook 13 Providing & Fixing Of Dead End Clamps 14 Forthe Work Of Giving New Connection To Shri Manohar Sahani, Parsakhera Bareilly Under Full Deposited Fund-2024-25 Under Eudd-Ii, Bareilly. 15 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 16 Pcc Pole ( 8.5 Mtr. Long ) 17 Abc Cable ( 3X50 Sqmm ) 18 Distribution Box 03 Phase 19 Stay Set 20 Erection Work 21 Erection Of Pcc Pole Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 22 Laying , Stringing &Sagging Of A B Cable ( 3X50 Sqmm ) 23 Erection Of Stay Set With Grouting 24 Fixing Of Distribution Box Alongwith Making All Connections . 25 Providing & Fixing Of Suspention Clamps Wiyth I-Hook 26 Providing & Fixing Of Dead End Clamps 27 For The Work Of Shifting Of Ht Lines In Front Of Shri Sailesh Agarwal , Parsakhera , Bareilly Under Full Deposited Fund-2024-25 Under Eudd-Ii, Bareilly. 28 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 29 St Pole ( 11 Meter Long ) 30 Acsr Dog Conductor 31 Stay Set 32 Other Line Materails 33 Erection Work 34 Erection Ofst D / Poleincluding Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 35 Erection Ofst Poleincluding Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 36 Laying , Stringing &Sagging Of Dog Conductor 37 Erathing Of Poles . 38 Erection Of Stay Set With Grouting 39 Provioding & Fixing Barbed Wire . 40 Provioding & Fixingholding Clampswith Nuts & Bolts 41 Provioding & Fixing.Danger Board With Clamps. 42 Fixing Of Associated Items I.E.Top Channel-04 No., T-Off Channel- 03 No., Base Angle -03 Nos., Disc Fitting-15 No., Pin Insulator With Pin-20 Nos. 43 For The Work Of Giving New Connection Of 200 Kva To M / S Aman Industries At, Maheshpur Ataria, C.B. Ganj, Bareilly Under Full Deposited Fund-2024-25 Under Eudd-Ii, Bareilly. 44 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 45 St Pole ( 11 Meter Long ) 46 Acsr Dog Conductor 47 11 Xlpe Cable ( 3X120 Sqmm ) 48 11 Kv Pilfer Proof Metering Cublical 49 11 Kv Xlpe Cable Box ( 3X120 Sqmm0 O / D 50 Stay Set 51 Other Line Materials 52 Erection Work 53 Erection Ofst D / Poleincluding Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 54 Laying , Stringing &Sagging Of Dog Conductor 55 Laying Of11 Kv Xlpe Cable ( 3X120 Sqmm ) 56 Hoisting Of40 Meter 11 Kv Xlpe Cable ( 3X120 Sqmm ) On Double Pole Including The Jumpering Complete With Clamps , Nut And Bolts 57 Fixng Of 11 Kv Xlpe Cable Box ( 3X120 Sqmm0 O / D 58 Erection& Fixing Of 11 Kv Pilfer Proof Metering Cublical 59 Erction Of Stay With Grouting . 60 Earthing Of11 Kv Pilfer Proof Meetring Cubical Water Level Body & Neutral, With Gi Pipe Of 1.5 Dia. Including Mild Steel Strip Size 35X6 Mm. ( Material Will Be Supplied By Contractor ) . 61 Provioding & Fixing Stonepad 62 Provioding & Fixing.Danger Board With Clamps. 63 Provioding & Fixing.Number Plate 64 Provioding & Fixing.Holing Clamps With Nut & Bolts . 65 Fixing Of Associated Items I.E.Top Channel-04 No.Pin Insulator With Pin-12 Nos. 66 For The Work Of Extention Of Lt Line Of M / S Amber Enclave , Saidpur Hawkins , Bareilly Under Full Deposited Fund-2024-25 Under Eudd-Ii, Bareilly. 67 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 68 Pcc Pole ( 8.5 Mtr. Long ) 69 Ab Cable ( 3X120 Sqmm ) 70 Distribution Box 03 Phase 71 Saty Set 72 Erection Work 73 Erection Ofpcc Pole Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 74 Laying , Stringing &Sagging Of A Bcable ( 3X120 Sqmm ) 75 Erection Of Stay Set With Grouting 76 Erection & Fixing Of Distribution Box 03 Phase Alongwith Making All Conections . 77 Provioding & Fixing.Suspention Clapms With I-Hook . 78 Provioding & Fixing Of Dead End Clapms 79 Provioding & Fixing Of Holding Clapms With Nut & Bolts 80 For Thw Eok Of Extention Of Load 90 Kw To 405 Kw Of M / S Mahalaxmi Chemicals, C.B. Ganj, Bareilly Under Full Deposited Fund-2024-25 Under Eudd-Ii, Bareilly. 81 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 82 11 Kv Xlpe Cable ( 3X120 Sqmm ) 83 11 Kv Cable Box ( 3X120 Sqmm ) O / D 84 11 Kv Pilfer Proof Metering Cublical 85 Erection Work 86 Laying Of 11 Kv Xlpe Cable ( 3X120 Sqmm ) 87 Fixng Of 11 Kv Xlpe Cable Box ( 3X120 Sqmm ) O / D 88 Dismentling Ofold Existing 11 Kv Pilfer Proof Metering Cublica And Back Carriagefrom Site To Central Store C.B Ganj, Bareilly . 89 Erection& Fixing Of 11 Kv Pilfer Proof Metering Cublical 90 Earthing Of11 Kv Pilfer Proof Meetring Cubical Water Level Body & Neutral, With Gi Pipe Of 1.5” Dia. Including Mild Steel Strip Size 35X6 Mm. ( Material Will Be Supplied By Contractor ) . 91 For The Work Of Extenstion Of Load M / S Super Batteries , Parsakhera Bareilly Under Full Deposited Fund-2024-25 Under Eudd-Ii, Bareilly 92 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 93 St Pole ( 11 Meter Long ) 94 11 Kv Xlpe Cable ( 3X70 Sqmm ) 95 11 Kv Xlpe Cable Box ( 3X70 Sqmm ) 96 11 Kv Pilfer Proof Metering Cublical 97 Other Line Materials 98 Erection Work 99 Erection Ofst D / Poleincluding Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete 100 Laying Of 11 Kv Xlpe Cable ( 3X70 Sqmm ) 101 Fixng Of 11 Kv Xlpe Cable Box ( 3X70 Sqmm ) O / D 102 Erection& Fixing Of 11 Kv Pilfer Proof Metering Cublical 103 Earthing Of11 Kv Pilfer Proof Meetring Cubical Water Level Body & Neutral, With Gi Pipe Of 1.5 Dia. Including Mild Steel Strip Size 35X6 Mm. ( Material Will Be Supplied By Contractor ) . 104 Erathing Of Poles . 105 Provioding & Fixing.Holing Clamps With Nut & Bolts 106 Fixing Of Associated Items I.E.Top Channel-02 No.Pin Insulator With Pin-12 Nos., Base Angle-02 No. 107 For The Work Of Extenstion Of Load M / S Vishnu Steel, Parsakhera Bareilly Under Full Deposited Fund-2024-25 Under Eudd-Ii, Bareilly 108 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 109 St Pole ( 11 Meter Long ) 110 11 Kv Xlpe Cable ( 3X120 Sqmm ) 111 11 Kv Xlpe Cable Box ( 3X120 Sqmm ) 112 11 Kv Pilfer Proof Metering Cublical 113 Other Line Materials 114 Erection Work 115 Erection Ofst D / Poleincluding Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete 116 Laying Of 11 Kv Xlpe Cable ( 3X120 Sqmm ) 117 Hoisting Of30 Meter 11 Kv Xlpe Cable ( 3X120 Sqmm ) On Double Pole Bote With Proviodinggi Pipe ( 12 Meter ) Of Size 6 Dia Including The Jumpering Complete With Clamps , Nut And Bolts. 118 Fixng Of 11 Kv Xlpe Cable Box ( 3X120 Sqmm ) O / D 119 Erection& Fixing Of 11 Kv Pilfer Proof Metering Cublical 120 Earthing Of11 Kv Pilfer Proof Meetring Cubical Water Level Body & Neutral, With Gi Pipe Of 1.5 Dia. Including Mild Steel Strip Size 35X6 Mm. ( Material Will Be Supplied By Contractor ) . 121 Erathing Of Poles . 122 Provioding & Fixing.Holing Clamps With Nut & Bolts 123 Fixing Of Associated Items I.E.Top Channel-02 No.Pin Insulator With Pin-12 Nos., Base Angle-02 No.. Last date of submission for this tender is 2024-05-17. This is a Electrification Work tender in bareilly, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
7 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3xlsxXLSX document
- Tender Document 4pdfPDF document
- Tender Document 5pdfPDF document
- Tender Document 6pdfPDF document
- Tender Document 7pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free