🎉 Your free trial plan has started. Plan will expire in 0 days

Madhyanchal Vidut Vitran Nigam Limited

bareilly, uttar pradesh

AOC value
₹4.35L
AOC date
14 Jun
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 14 Jun 24AOC date

Important info

Result ID
Refer Docs
Award of contract
14/06/2024
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Madhyanchal Vidut Vitran Nigam Limited has published Tender For Electrical Deposit Work Under Eudd-Ii Bareilly, Different Electrification Work Under Deposit Scheme 2024-25 Under Eudd-Ii Bareilly, 1 Forthe Work Of Giving New Connection Of 02 Kw ( Lnv-1 ) To Smt. Naresh Kumari , Golul Dham Colony , Bareilly Under Full Deposited Fund-2024-25 Under Eudd-Ii, Bareilly. 2 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 3 Pcc Pole ( 8.5 Metre Long ) 4 Distribution Box 03 Phase 5 Abc Cable ( 3X50 Sqmm ) 6 Stay Set 7 Erection Work 8 Erection Of Pcc Pole Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 9 Laying , Stringing &Sagging Of A B Cable ( 3X50 Sqmm ) 10 Erection Of Stay Set With Graouting 11 Fixing Of Distribution Box Alongwith Making All Connections . 12 Providing & Fixing Of Suspention Clamps Wiyth I-Hook 13 Providing & Fixing Of Dead End Clamps 14 Forthe Work Of Giving New Connection To Shri Manohar Sahani, Parsakhera Bareilly Under Full Deposited Fund-2024-25 Under Eudd-Ii, Bareilly. 15 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 16 Pcc Pole ( 8.5 Mtr. Long ) 17 Abc Cable ( 3X50 Sqmm ) 18 Distribution Box 03 Phase 19 Stay Set 20 Erection Work 21 Erection Of Pcc Pole Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 22 Laying , Stringing &Sagging Of A B Cable ( 3X50 Sqmm ) 23 Erection Of Stay Set With Grouting 24 Fixing Of Distribution Box Alongwith Making All Connections . 25 Providing & Fixing Of Suspention Clamps Wiyth I-Hook 26 Providing & Fixing Of Dead End Clamps 27 For The Work Of Shifting Of Ht Lines In Front Of Shri Sailesh Agarwal , Parsakhera , Bareilly Under Full Deposited Fund-2024-25 Under Eudd-Ii, Bareilly. 28 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 29 St Pole ( 11 Meter Long ) 30 Acsr Dog Conductor 31 Stay Set 32 Other Line Materails 33 Erection Work 34 Erection Ofst D / Poleincluding Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 35 Erection Ofst Poleincluding Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 36 Laying , Stringing &Sagging Of Dog Conductor 37 Erathing Of Poles . 38 Erection Of Stay Set With Grouting 39 Provioding & Fixing Barbed Wire . 40 Provioding & Fixingholding Clampswith Nuts & Bolts 41 Provioding & Fixing.Danger Board With Clamps. 42 Fixing Of Associated Items I.E.Top Channel-04 No., T-Off Channel- 03 No., Base Angle -03 Nos., Disc Fitting-15 No., Pin Insulator With Pin-20 Nos. 43 For The Work Of Giving New Connection Of 200 Kva To M / S Aman Industries At, Maheshpur Ataria, C.B. Ganj, Bareilly Under Full Deposited Fund-2024-25 Under Eudd-Ii, Bareilly. 44 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 45 St Pole ( 11 Meter Long ) 46 Acsr Dog Conductor 47 11 Xlpe Cable ( 3X120 Sqmm ) 48 11 Kv Pilfer Proof Metering Cublical 49 11 Kv Xlpe Cable Box ( 3X120 Sqmm0 O / D 50 Stay Set 51 Other Line Materials 52 Erection Work 53 Erection Ofst D / Poleincluding Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 54 Laying , Stringing &Sagging Of Dog Conductor 55 Laying Of11 Kv Xlpe Cable ( 3X120 Sqmm ) 56 Hoisting Of40 Meter 11 Kv Xlpe Cable ( 3X120 Sqmm ) On Double Pole Including The Jumpering Complete With Clamps , Nut And Bolts 57 Fixng Of 11 Kv Xlpe Cable Box ( 3X120 Sqmm0 O / D 58 Erection& Fixing Of 11 Kv Pilfer Proof Metering Cublical 59 Erction Of Stay With Grouting . 60 Earthing Of11 Kv Pilfer Proof Meetring Cubical Water Level Body & Neutral, With Gi Pipe Of 1.5 Dia. Including Mild Steel Strip Size 35X6 Mm. ( Material Will Be Supplied By Contractor ) . 61 Provioding & Fixing Stonepad 62 Provioding & Fixing.Danger Board With Clamps. 63 Provioding & Fixing.Number Plate 64 Provioding & Fixing.Holing Clamps With Nut & Bolts . 65 Fixing Of Associated Items I.E.Top Channel-04 No.Pin Insulator With Pin-12 Nos. 66 For The Work Of Extention Of Lt Line Of M / S Amber Enclave , Saidpur Hawkins , Bareilly Under Full Deposited Fund-2024-25 Under Eudd-Ii, Bareilly. 67 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 68 Pcc Pole ( 8.5 Mtr. Long ) 69 Ab Cable ( 3X120 Sqmm ) 70 Distribution Box 03 Phase 71 Saty Set 72 Erection Work 73 Erection Ofpcc Pole Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 74 Laying , Stringing &Sagging Of A Bcable ( 3X120 Sqmm ) 75 Erection Of Stay Set With Grouting 76 Erection & Fixing Of Distribution Box 03 Phase Alongwith Making All Conections . 77 Provioding & Fixing.Suspention Clapms With I-Hook . 78 Provioding & Fixing Of Dead End Clapms 79 Provioding & Fixing Of Holding Clapms With Nut & Bolts 80 For Thw Eok Of Extention Of Load 90 Kw To 405 Kw Of M / S Mahalaxmi Chemicals, C.B. Ganj, Bareilly Under Full Deposited Fund-2024-25 Under Eudd-Ii, Bareilly. 81 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 82 11 Kv Xlpe Cable ( 3X120 Sqmm ) 83 11 Kv Cable Box ( 3X120 Sqmm ) O / D 84 11 Kv Pilfer Proof Metering Cublical 85 Erection Work 86 Laying Of 11 Kv Xlpe Cable ( 3X120 Sqmm ) 87 Fixng Of 11 Kv Xlpe Cable Box ( 3X120 Sqmm ) O / D 88 Dismentling Ofold Existing 11 Kv Pilfer Proof Metering Cublica And Back Carriagefrom Site To Central Store C.B Ganj, Bareilly . 89 Erection& Fixing Of 11 Kv Pilfer Proof Metering Cublical 90 Earthing Of11 Kv Pilfer Proof Meetring Cubical Water Level Body & Neutral, With Gi Pipe Of 1.5” Dia. Including Mild Steel Strip Size 35X6 Mm. ( Material Will Be Supplied By Contractor ) . 91 For The Work Of Extenstion Of Load M / S Super Batteries , Parsakhera Bareilly Under Full Deposited Fund-2024-25 Under Eudd-Ii, Bareilly 92 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 93 St Pole ( 11 Meter Long ) 94 11 Kv Xlpe Cable ( 3X70 Sqmm ) 95 11 Kv Xlpe Cable Box ( 3X70 Sqmm ) 96 11 Kv Pilfer Proof Metering Cublical 97 Other Line Materials 98 Erection Work 99 Erection Ofst D / Poleincluding Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete 100 Laying Of 11 Kv Xlpe Cable ( 3X70 Sqmm ) 101 Fixng Of 11 Kv Xlpe Cable Box ( 3X70 Sqmm ) O / D 102 Erection& Fixing Of 11 Kv Pilfer Proof Metering Cublical 103 Earthing Of11 Kv Pilfer Proof Meetring Cubical Water Level Body & Neutral, With Gi Pipe Of 1.5 Dia. Including Mild Steel Strip Size 35X6 Mm. ( Material Will Be Supplied By Contractor ) . 104 Erathing Of Poles . 105 Provioding & Fixing.Holing Clamps With Nut & Bolts 106 Fixing Of Associated Items I.E.Top Channel-02 No.Pin Insulator With Pin-12 Nos., Base Angle-02 No. 107 For The Work Of Extenstion Of Load M / S Vishnu Steel, Parsakhera Bareilly Under Full Deposited Fund-2024-25 Under Eudd-Ii, Bareilly 108 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 109 St Pole ( 11 Meter Long ) 110 11 Kv Xlpe Cable ( 3X120 Sqmm ) 111 11 Kv Xlpe Cable Box ( 3X120 Sqmm ) 112 11 Kv Pilfer Proof Metering Cublical 113 Other Line Materials 114 Erection Work 115 Erection Ofst D / Poleincluding Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete 116 Laying Of 11 Kv Xlpe Cable ( 3X120 Sqmm ) 117 Hoisting Of30 Meter 11 Kv Xlpe Cable ( 3X120 Sqmm ) On Double Pole Bote With Proviodinggi Pipe ( 12 Meter ) Of Size 6 Dia Including The Jumpering Complete With Clamps , Nut And Bolts. 118 Fixng Of 11 Kv Xlpe Cable Box ( 3X120 Sqmm ) O / D 119 Erection& Fixing Of 11 Kv Pilfer Proof Metering Cublical 120 Earthing Of11 Kv Pilfer Proof Meetring Cubical Water Level Body & Neutral, With Gi Pipe Of 1.5 Dia. Including Mild Steel Strip Size 35X6 Mm. ( Material Will Be Supplied By Contractor ) . 121 Erathing Of Poles . 122 Provioding & Fixing.Holing Clamps With Nut & Bolts 123 Fixing Of Associated Items I.E.Top Channel-02 No.Pin Insulator With Pin-12 Nos., Base Angle-02 No.. Last date of submission for this tender is 2024-05-17. This is a Electrification Work tender in bareilly, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

7 issued
  • Tender Document 1html
  • Tender Document 2pdf
  • Tender Document 3xlsx
  • Tender Document 4pdf
  • Tender Document 5pdf
  • Tender Document 6pdf
  • Tender Document 7pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in