🎉 Your free trial plan has started. Plan will expire in 0 days

Madhyanchal Vidut Vitran Nigam Limited

bareilly, uttar pradesh

AOC value
₹2.63L
AOC date
1 Nov
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 1 Nov 23AOC date

Important info

Result ID
Refer Docs
Award of contract
01/11/2023
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Madhyanchal Vidut Vitran Nigam Limited has published Work Of Replacement Of Damage Cable Lug, Tail Less Unit Etc For Preventive Maintenance Of Distribution T / F In Different Areas Of Sub Division-Viiiunder Eudd-Iv Bareilly-2 Lt Cable Size 1X240 Mm2 3 Lt Cable Size 1X400 Mm2 4 Lt Cable Size 1X630 Mm2 5 Lt Cable Size 1X1000 Mm2 6 Lt Cable Size 3.5X150 Mm2 7 Lt Cable Size 3.5X240 Mm2 8 Lt Cable Size 3.5X400 Mm2 9 Ms Channel 100X50 For Mounting Of Tail Less Unit 10 Erection Work 11 Fabrication And Erection Ofms Channel 100X50 ( Total 945 Kgs. ) For Mounting Of Tail Less Unitfor Distribution T / F . 12 Dismantling And Removing Ofold And Damaged Lt Cable From Transformerandfixing Of New Ltcable Size ( 1X240mm2 ) 13 Dismantling And Removing Ofold And Damaged Lt Cable From Transformerandfixing Of New Ltcable Size ( 1X400mm2 ) 14 Dismantling And Removing Ofold And Damaged Lt Cable From Transformerandfixing Of New Ltcable Size ( 1X630mm2 ) 15 Dismantling And Removing Ofold And Damaged Lt Cable From Transformerandfixing Of New Ltcable Size ( 3.5X150mm2 ) 16 Dismantling And Removing Ofold And Damaged Lt Cable From Transformerandfixing Of New Ltcable Size ( 3.5X240mm2 ) 17 Dismantling And Removing Ofold And Damaged Lt Cable From Transformerandfixing Of New Ltcable Size ( 3.5X400mm2 ) 18 Replacementof Old Damaged Tail Less Unit & Fixing New Tail Less Unit ( 300 Amp ) With Material At M.S Channel Frame Along With Providing And Fixing Fuse Wire ( 10 Swg / 12 Sgw / 14 Sgw ) . ( All The Material Will Be Arranged By The Contractor At His Own Cost ) . 19 Replacementof Old Damaged Tail Less Unit & Fixing New Tail Less Unit ( 500 Amp ) With Material At M.S Channel Frame Along With Providing And Fixing Fuse Wire ( 10 Swg / 12 Sgw / 14 Sgw ) . ( All The Material Will Be Arranged By The Contractor At His Own Cost ) . 20 Replacement Of Old Damaged Tail Less Unit ( 800 Amp ) With Material. At M.S Channel Frame Along With Providing And Fixing Fuse Wire ( 10 Swg / 12 Sgw / 14 Sgw ) . ( All The Material Will Be Arranged By The Contractor At His Own Cost ) 21 Replacement Of Old Damaged Brass Connector& Fixing Of Newbrass Connector Suitable For 240 Mm2 Cable With Material. ( All The Material Will Be Arranged By The Contractor At His Own Cost ) 22 Replacement Of Old Damaged Brass Connector& Fixing Of Newbrass Connector Suitable For 400 Mm2 Cable With Material. ( All The Material Will Be Arranged By The Contractor At His Own Cost ) 23 Replacement Of Old Damaged Brass Connector& Fixing Of Newbrass Connector Suitable For 630Mm2 Cable With Material. ( All The Material Will Be Arranged By The Contractor At His Own Cost ) 24 Replacement Of Old Damaged Brass Connector& Fixing Of Newbrass Connector Suitable For 1000 Mm2 Cable With Material. ( All The Material Will Be Arranged By The Contractor At His Own Cost ) 25 Replacement Of Old And Damaged Al Lugs And Fixing New Al Lugs Suitable For 150 Mm2 With Material. ( All The Material Will Be Arranged By The Contractor At His Own Cost ) 26 Replacement Of Old And Damaged Al Lugs And Fixing New Al Lugs Suitable For 240 Mm2 With Material. ( All The Material Will Be Arranged By The Contractor At His Own Cost ) 27 Replacement Of Old And Damaged Al Lugs And Fixing New Al Lugs Suitable For 400 Mm2 With Material. ( All The Material Will Be Arranged By The Contractor At His Own Cost ) . 28 Replacement Of Old And Damaged Al Lugs And Fixing New Al Lugs Suitable For 630 Mm2 With Material. ( All The Material Will Be Arranged By The Contractor At His Own Cost ) . 29 Replacement Of Old And Damaged Al Lugs And Fixing New Al Lugs Suitable For 1000 Mm2 With Material. ( All The Material Will Be Arranged By The Contractor At His Own Cost ) . 30 Cleaning And Minor Repairing Of Old Earthingof T / F 31 Back Carriage Of Old Scrap From Site To C.B. Ganj Central Store , Bareilly Including Loading & Unloading .. Last date of submission for this tender is 2023-03-28. This is a Connectors Supply tender in Bareilly, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

7 issued
  • Tender Document 1html
  • Tender Document 2pdf
  • Tender Document 3xlsx
  • Tender Document 4pdf
  • Tender Document 5pdf
  • Tender Document 6pdf
  • Tender Document 7pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in