Madhyanchal Vidut Vitran Nigam Limited
- AOC value
- ₹9.92L
- AOC date
- 10 Oct
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 10 Oct 22AOC date
- -Published
- -Closes
- -Bid opens
- 10 Oct 2022AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 10/10/2022
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Madhyanchal Vidut Vitran Nigam Limited has published Running Contract for hon,ble Sansad Nidhi/Vidhayak Nidhi and other Deposit Works under EDD-III (Bisauli), Budaun. Sl. No. Item Description 1 The work of safe carriage of the following material from Nawada store center to work site under the jurisdiction of EDD-III (Bisauli), Budaun. Approx. distance upto 60 Km. Including safe loading and unloading. 2 PCC Pole 8.5 meter long. 3 STP 11 Mtr Long 4 Line material i.e., cross arm/ conductor/ pin insulater/stay/earthing rod/Disc Fitting/Disc Insulators/11 KV XLPE Cable etc 5 11/0.4 KV 1 Phase 10/16 KVA T/F 6 11/0.4 KV 3 Phase 25 KVA T/F 7 11/0.4 KV 3 Phase 63 KVA T/F 8 11/0.4 KV 3 Phase 100 KVA T/F 9 11/0.4 KV 3 Phase 250 KVA T/F 10 11 KV Pilfer proof Metering cubical and CT PT Unit 11 33 KV Pilfer proof Metering cubical and CT PT Unit 12 Erection of new PCC Single/Double pole in H.T/L.T lines including fitting of all accessories as per RESSPO Norms 13 PCC Pole 8.5 Mtr Long Single Pole 14 PCC Pole 8.5 Mtr Long Double Pole 15 ST Pole 11 Mtr Long Single Pole. 16 ST Pole 11 Mtr Long Double Pole. 17 Grouting with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/BB & sand Required as per RESSPO Norms 18 PCC Pole 8.5 Mtr Long Single Pole 19 PCC Pole 8.5 Mtr Long Double Pole 20 ST Pole 11 Mtr Long Single Pole. 21 ST Pole 11 Mtr Long Double Pole. 22 The work of Driving the earthing electrode and making connections with 6 S.W.G. GI wire as per RESSPO Norms 23 Laying, Stringing & Sagging of Following Conductor complete in all respect. 24 ACSR Weasal Conductor 25 ACSR Dog Conductor 26 3 Phase Arial Bunched Conductor 27 1 Phase Arial Bunched Conductor 28 After Mounting of CT PT unit on double pole, laying of 50 Mtr 11 KV 3cx70 sq mm cable in single circuit on river sand form Double Pole to meetering room complete in all respect. Alongwith filling of 04 nos cable jointing kits 29 After Mounting of CT PT unit on double pole, laying of 50 Mtr 33 KV 3cx120 sq mm cable in single circuit on river sand form Double Pole to meetering room complete in all respect. Alongwith filling of 04 nos cable jointing kits. 30 Under ground laying of Following cable in Single circuit on river sand to Double pole situated at both sides of road complete in all respect. Minimum depth should be 0.75 Mtr and cable should be covered by bricks from three sides. Alongwith filling of 04 nos cable jointing kits 31 LT Cable Size 1x240 sqmm 32 11 KV XLPE Cable Size 3x70 sqmm 33 11 KV XLPE Cable Size 3x120 sqmm 34 11 KV XLPE Cable Size 3x185 sqmm 35 33 KV XLPE Cable Size 3x120 sqmm 36 33 KV XLPE Cable Size 3x185 sqmm 37 33 KV XLPE Cable Size 3x300 sqmm 38 Under ground laying of Following cable in Single circuit by drill method to Double pole situated at both sides of NH/SH/Railway Crossing complete in all respect. Alongwith filling of 04 nos cable jointing kits 39 11 KV XLPE Cable Size 3x70 sqmm 40 11 KV XLPE Cable Size 3x120 sqmm 41 11 KV XLPE Cable Size 3x185 sqmm 42 33 KV XLPE Cable Size 3x120 sqmm 43 33 KV XLPE Cable Size 3x185 sqmm 44 33 KV XLPE Cable Size 3x300 sqmm 45 The work of digging of pits, erection of Stay Clamp, Insulator etc. 46 Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms. 47 Installation of 11 KV Pilfer Proof Metering Cubicle in metering room complete in all respect 48 Installation of 33 KV Pilfer Proof Metering Cubicle in metering room complete in all respect 49 Mounting of Following Capacity Transformers as per norms complete in all respect - 50 10/16 KVA T/F 51 25 KVA T/F 52 63 KVA T/F 53 100 KVA T/F 54 11/0.4 KV 3 Phase 250 KVA T/F 55 Fixing of Distribution Box complete in all respect 56 Guarding at road crossing complete in all respect 57 11 KV VCB incoming/outgoing loading/unloading and installation 58 Construction of Plinth of size 2x2x1.5 Mtr. suitable for 11/0.4 KV 250 KVA T/F including cost of all material as per RESSPO Norms. 59 Wiremesh Fencing work suitable for 250 KVA T/F and angles of suitable size should be grouted on all 04 corners and 01 side for gate. Gate will also be constructed and Jali of fencing of size 1” of Burfi Shape. Including cost of all material. 60 Earthing of Neutral/Body of each T/F separately of 250 KVA T/Fs. All the material for earthing work shall be provided by the contractor. 61 Boring process (approx depth 60 ft.) and lowering GI Pipe with connecting and welding of GI Strip (50x6 mm) to T/F (Neutral). 62 Lowering of MS Electrode (approx 12 ft depth) 25 mm dia and connecting, welding of G.I. Strip (50x6 mm) to T/F Body. 63 Safe back carriage of Scrap (if any) from work site to Nawada store Budaun approx distance upto 60 Km including safe loading & unloading. . Last date of submission for this tender is 2022-09-19. This is a Civil Work tender in Budaun, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
7 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3xlsxXLSX document
- Tender Document 4pdfPDF document
- Tender Document 5pdfPDF document
- Tender Document 6pdfPDF document
- Tender Document 7pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free