🎉 Your free trial plan has started. Plan will expire in 0 days

Madhyanchal Vidut Vitran Nigam Limited

fatehpur, uttar pradesh

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Madhyanchal Vidut Vitran Nigam Limited has published Tender For 11 Kv Independent Feeder Construction Work Under Nagar Nikay Under Ee, Edd, Fatehpur Barabanki - Safe loading, carriage including unloading and proper stacking of following materials from Central Store Barabanki / JE Store to site of work. 2 ST Pole 11 Meter Long 3 Pcc Pole 8.5 Meter Long 4 Top Channel 5 T-off Channel 6 Dropper Channel 7 11 KV DISC INSULATOR WITH FITTING 8 11 KV PIN INSULATOR polymeric 9 Stay Set Complete 10 ACSR Rabbit Conductor 11 Earthing Set 12 Loop Insulator 13 11 KV X-arm 14 Holding Clamp for xarm 15 M.S Angle Iron 65x65x6mm Bracing with 4 Clamp 16 3x300 XLPE 11 KV Cable 17 O/D 3x300 XLPE 11 KV Jointing 18 3x120 XLPE 11 KV Cable 19 O/D 3x120 XLPE 11 KV Jointing 20 STH 3x120 21 250 Kva T/F 22 S/S Base Angle 23 3x120 Sqmm ABC 24 11 KV VCB I/C CTR 600/300/5A 350 MVA, 24 Volt 25 11 KV VCB For O/G CTR 200/100/5A 26 3 Phase DB BOX 27 Dragging of pole from JE Dump Store to site 28 Grouting of STP Pole 29 Erection of Stay set of 16x1800 mm rod duly painted with red oxide,anchor plate, thumble turn buckle andstay insulate etc. digging of pit of size of size 0.4x0.6x1.6 m for grouting 1:3:6 cement concrete, with stay of size 7/8 SWG, nuzzling & Grouting. 30 Installation of Mounting of Following capacityof Transformer including its connection between 11 KV and LT Line mountingprovinding Crimping type Aluminium lugs of required size.( All the material except transformer will be arranged by the contractor) 31 Mounting of 250 KVA Tranformer 32 Stringing and sagging of 11 KV line with ACSR Rabbit Conductor including nuzzling binding and jumpering (Rabbit conductor will be provided by the department) 33 Errectionof Substation type double pole with ST/PCCincluding mounting of Top Channal Dropper Channel, base angle with clamps with nut & bolt 33/11 KV line including grouting of support and plinthing 300 mm above ground level, fitting of 33/11 KV pin & Pin insulator. 1/6 of total lenght of poles will remain under the ground and planted on stone pad of Size 300x300x75 MM. 34 Errectionof singlePCC /ST Pole for Stringing and sagging of conductor 1/6 of total length of poles will remain under the ground and planted on stone pad of size 300x300x75 mm. 35 Stringing and sagging of 3x120 Sqmm ABC ABC Cable will be provided by the department) 36 Laying of 11 KV XLPE CABLE 3x300+3x120 Sq. MM (XLPE Cable will be provided by the department) 37 Earthing of pole with MS Earthing. 38 Concreating and pilinthing of ST& PCCPole 18x24 CM. 39 Fabricate with hole suitable size in steel items, receive from central store lightas top channel/dropper channel sub station base angle etc. 40 Provinding & Fixing of various type materials. All materials shall be supplied by the contractor. 41 Piercing Clamp 42 Dead End Clamp 43 Nut & Bolt 44 F-Bracket 45 Copper lead 70 sqmm for DB Box 46 CLAMP FOR TOP, T-OFF, DROP 47 DANGER BOARD 48 G.I. BARBED WIRE 49 GI Pipe 6 Dia 50 J-Hook 51 Wiremesh fencing of 11/0.4 KV substation shall be made rectangular off size as per site requirement not exceeding 3 meter fabrication 45x45x5mm angle. material shall be supplied by the contractor. 52 Construction of massionary type transformer plinth of Suitable sizewith brick ,cement, coarse sand , sand & brick ballast. Filling of sand in the hollow space , plastering , outer surface in ration 1:4:6 top of the plinth 4 thickness grouting of 2 nos MS Channel of size 100x50x2000 mm on the top of the plinth for placement of transformer . All material shall be supplied by the contractor. 53 Earthing of T/F Pipe type with 40 fit deep borring and providing GI Pipe 1.5 dia (60 fit GI Pipe) and GI strip 25x5 mmx6 meter long attached with clamps, L piece, nut & bolts and GI Pipe Cap. All material shall be supplied by the contractor. 54 Tailless Unit Complete . Last date of submission for this tender is 2025-03-01. This is a Feeder Pillar tender in Fatehpur, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

3 issued
  • Tender Document 1html
  • Tender Document 2xlsx
  • Tender Document 3pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in