Madhyanchal Vidut Vitran Nigam Limited
- AOC value
- ₹28.27L
- AOC date
- 5 Aug
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 5 Aug 21AOC date
- -Published
- -Closes
- -Bid opens
- 5 Aug 2021AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 05/08/2021
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Madhyanchal Vidut Vitran Nigam Limited has published Running Contract For Deposit Under Edd-Ii, Bareilly- 1 The Work Of Safe Carriage Of The Following Material From Cb Ganj Store Center To Work Siteunder The Jurisdiction Of Edd-Ii, Bareilly. Approx. Distance Upto 80 Km. Including Safe Loading And Unloading. 2 Pcc Pole 8.5 Meter Long. 3 Stp 9 Mtr Long 4 Stp 11 Mtr Long 5 Line Material I.E., Cross Arm / Conductor / Pin Insulater / Stay / Earthing Rod / Disc Fitting / Disc Insulators / 11 Kv Xlpe Cable Etc 6 11 / 0.4 Kv 1 Phase 10 / 16 Kva T / F 7 11 / 0.4 Kv 3 Phase 25 Kva T / F 8 11 / 0.4 Kv 3 Phase 63 Kva T / F 9 11 / 0.4 Kv 3 Phase 100 Kva T / F 10 11 Kv Pilfer Proof Metering Cubical And Ct Pt Unit 11 33 Kv Pilfer Proof Metering Cubical And Ct Pt Unit 12 Erection Of New Pcc Single / Double Pole In H.T / L.T Lines Including Fitting Of All Accessories As Per Resspo Norms 13 Pcc Pole 8.5 Mtr Long Single Pole 14 Pcc Pole 8.5 Mtr Long Double Pole 15 St Pole 9 Mtr Long Single Pole. 16 St Pole 9 Mtr Long Double Pole. 17 St Pole 11 Mtr Long Single Pole. 18 St Pole 11 Mtr Long Double Pole. 19 Grouting With 1:4:8 Mixture In Size ( 450X450x1500mm. ) Including Cost Of Cement / Bb & Sand Required As Per Resspo Norms 20 Pcc Pole 8.5 Mtr Long Single Pole 21 Pcc Pole 8.5 Mtr Long Double Pole 22 St Pole 9 Mtr Long Single Pole. 23 St Pole 9 Mtr Long Double Pole. 24 St Pole 11 Mtr Long Single Pole. 25 St Pole 11 Mtr Long Double Pole. 26 The Work Of Driving The Earthing Electrode And Making Connections With 6 S.W.G. Gi Wire As Per Resspo Norms 27 Laying, Stringing & Sagging Of Following Conductor Complete In All Respect 28 Acsr Weasal Conductor 29 Acsr Dog Conductor 30 3 Phase Arial Bunched Conductor 31 1 Phase Arial Bunched Conductor 32 After Mounting Of Ct Pt Unit On Double Pole, Laying Of 50 Mtr 11 Kv 3Cx70 Sq Mm Cable In Single Circuit On River Sand Formdouble Pole To Meetering Room Complete In All Respect. Alongwith Filling Of 04 Nos Cable Jointing Kits 33 After Mounting Of Ct Pt Unit On Double Pole, Laying Of 50 Mtr 33 Kv 3Cx120 Sq Mm Cable In Single Circuit On River Sand Formdouble Pole To Meetering Room Complete In All Respect. Alongwith Filling Of 04 Nos Cable Jointing Kits 34 Under Ground Laying Of Following Cable In Single Circuit On River Sand To Double Pole Situated At Both Sides Of Road Complete In All Respect. Minimum Depth Should Be 0.75 Mtr And Cable Should Be Covered By Bricks From Three Sides. Alongwith Filling Of 04 Nos Cable Jointing Kits 35 11 Kv Xlpe Cable Size 3X70 Sqmm 36 11 Kv Xlpe Cable Size 3X120 Sqmm 37 11 Kv Xlpe Cable Size 3X185 Sqmm 38 33 Kv Xlpe Cable Size 3X120 Sqmm 39 33 Kv Xlpe Cable Size 3X185 Sqmm 40 33 Kv Xlpe Cable Size 3X300 Sqmm 41 Under Ground Laying Of Following Cable In Single Circuit By Drill Method To Double Pole Situated At Both Sides Of Nh / Sh / Railway Crossing Complete In All Respect.Alongwith Filling Of 04 Nos Cable Jointing Kits 42 11 Kv Xlpe Cable Size 3X70 Sqmm 43 11 Kv Xlpe Cable Size 3X120 Sqmm 44 11 Kv Xlpe Cable Size 3X185 Sqmm 45 33 Kv Xlpe Cable Size 3X120 Sqmm 46 33 Kv Xlpe Cable Size 3X185 Sqmm 47 33 Kv Xlpe Cable Size 3X300 Sqmm 48 The Work Of Digging Of Pits, Erection Of Stay Clamp, Insulator Etc. 49 Grouting Of Stays, 1:4:8 Cc Ratio ( 600X600x300mm. ) As Per Respo Norms. 50 Installation Of 11 Kv Pilfer Proof Metering Cubicle In Metering Room Complete In All Respect 51 Installation Of 33 Kv Pilfer Proof Metering Cubicle In Metering Room Complete In All Respect 52 Mounting Of Following Capacity Transformers As Per Norms Complete In All Respect - 53 10 / 16 Kva T / F 54 25 Kva T / F 55 63 Kva T / F 56 100 Kva T / F 57 Fixing Of Distribution Box Complete In All Respect 58 Guarding At Road Crossing Complete In All Respect 59 Safe Back Carriage Of Scrap ( If Any ) From Work Siteto C.B. Ganj Store Bareilly Approx Distance Upto 80 Km Including Safe Loading & Unloading.. Last date of submission for this tender is 2021-07-19. This is a Clamps tender in Work, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free