Madhyanchal Vidut Vitran Nigam Limited

Power Generation And Transmission
bareilly, uttar pradesh
AOC Value₹2.57 Lac
AOC Date21 Dec 2023
Completion DaysRefer Docs
Bid AmountRefer Docs

Important Info

Result ID
Refer Docs
Award of Contract
21/12/2023
Authority
Madhyanchal Vidut Vitran Nigam Limited
Published Date
Refer Docs
Tender Closing Date
Refer Docs
Tender No
55(00)/2025-2026/XXX/5XX
Bidding URL
https://www.exampletenders.gov.in/bid/98765
Tender
View Tender
Bidder Details
Bidder Name: Mr. Jhon Doe, Ranking 2

AOC Description

Madhyanchal Vidut Vitran Nigam Limited has published Increasing Capacity Of 33 / 11Kv Sub Station Meerganj From 10+5 Mva To 2X10 Mva In District Bareilly- Loading, Unloading And Safe Carriage Of The Following Materials From Any Electy. Store Center Of Electricity Store Division Of Bareilly Zone. 2 33 Kv Lightening Arrestor 3 33 Kv Vcb 800A 750 Mva 4 11 Kv 3X300 Mm2 Xlpe Cable 5 11 Kv Cable Jointing Kit 3X300 Mm2 I / D 6 11 Kv Cable Jointing Kit 3X300 Mm2 O / D 7 Earthing Of Indoor & Outdoor Equipments Of Sub-Station After Proper Welding Of Joints And Painting Of Earth Strip Above Soil With Proper Clamp Etc. As Per Respo Approved Drawing & Resistance Of Earthing Should Be Not More Than 2O As Per Details Given Below. 8 Making Of Triangular Bridge By Using Ms Electrode, Gi Strip 50X6mm And Gi Pipe 40 Mm Dia With Providing Of Well Type Pipe Earthing Upto 15 Mtr. Depth Below Ground Level Including Welding Etc. By Boaring Process At T / F Neutral, La And Newly Erected Structure Including Cost Of Gi Pipe Of Size 40 Mm Dia 15 Mtr. Long Of Isi Mark. ( All The Required Material Will Be Supllied By The Contractor ) . 9 Supply Of Gi Strip Of Size 50X6mm For Earthing Of All Newly Erected Structures And Equipments In Switchyard Including Cutting, Fixing & Proper Welding With Equipments. All La Will Be Seprately Earth Also As Per Respo Norms. ( All The Required Materials Will Be Provided By Firm. ) 10 Fabrication, Erection And Grouting Of The Following Structures As Per Resspo / Approved Drawing And Its, Plinth 30Cm Above Ground Leval As Directed By The Engineer Incharge ( All Steel Sections Will Be Provided By Deptt ) . 11 33 Kv Vcb Structure 12 Installation Of Followig Equipments On Their Respective Structures Including Mechanical & Electrical Fixing After Proper Adjustment On Their Structure. 13 Lightening Arrestor 14 33 Kv Vcb 15 Dismantling Of Existing Following Damage Equipments On Their Structure. 16 Lightening Arrestor 17 33 Kv Vcb 18 Complete Laying And Termination Of Copper Control Cables From 10 Mva Power T / F, 33 Kv Vcb, 33 Kv Ct In The Out Door Switch Yard To The Existing Transformer Relay Control Panel Inside The Control Room Including Cost Of All Materials And Labour Required For Proper Completion Of Works As Per Resspo Drawings, Including Cost Of Testing Of Transformer, Vcb, Ct, Relay Pannel & Proper Relay Settings As Per Requirement Etc. 19 Control Cable 4X2.5 Mm2 20 Control Cable 2X2.5 Mm2 21 Laying Of 11Kv Cable Of Different Size From Power T / F To Control Room I / C And Control Room To D / P Outside Sub-Station Over A Pad Of River Sand . Cable Shall Be Laid 500Mm Below The Ground In The Yard By Covering Three Sides With Ist Class Brick And Ganga Sand ( All Type Laying Material Will Be Provided By The Firm Except 11 Kv Cables ) . 22 Termination Of 11 Kv Different Size Xlpe Cable By Filling 11 Kv Heat Shrinkable Type Cable Boxes Including Proper Connection With Lv Side Of T / F Switch Gear Panels And Double Poles By Providing Suitable Connectors. 23 Repairing Of Existing 33 Kv Control Panel In At Sub-Station Including Repalcement Of All Required Accessories As Relay Etc. All Type Of Material Should Be Provided By The Firm. 24 Safely Shifting And Dragging Of 33 / 11 Kv 5 Mva Transformer From Its Plinth To Safe Site At Sub-Station. Including Its Proper Disconnecting Of Ht, Lt Side Connection, Neutral , Body Earthing Etc. 25 Shifting And Dragging Of 33 / 11 Kv 10 Mva Transformer From Road Side To Its Plinth Alongwith Its Erection Including Fixing Of All Assessories And Top-Up Of T / F Oil. 26 Carriage Of Old Scrap Material From Site To Store Center Bareilly. 27 Complete Repairing Of Swichyard Fencing.. Last date of submission for this tender is 2023-10-20. This is a Substation tender in Bareilly, Uttar Pradesh

Insurance Surety Bond

Fast, Reliable & Accepted for EMD/PBG

  • Zero BG Limit Impact
  • Accepted in All Tenders
  • Quick Online Quote

Tender Documents

  • Tender Document 1html
  • Tender Document 2pdf
  • Tender Document 3xlsx
  • Tender Document 4pdf
  • Tender Document 5pdf
  • Tender Document 6pdf
  • Tender Document 7pdf
lock-red

Unlock the Tender details for free

description-svgrepo

Bidder Details

Bidder NameTechnical BidFinancial BidAOCBid ValueRank
Sharma infra projects pvt ltd
₹1,24,50,000.00L1
Verma constructions ltd
₹1,31,00,000.00L2
Nair engineering works
₹1,38,75,000.00L3
Iyer industrial solutions
₹1,43,20,000.00L4
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in