Kisan Sahkari Chini Mills Limited
- AOC value
- Refer Docs
- AOC date
- Refer Docs
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- -AOC date
- -Published
- -Closes
- -Bid opens
- -AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- Refer Docs
- Authority
- Kisan Sahkari Chini Mills Limited
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Kisan Sahkari Chini Mills Limited has published Competitive E-Bidding For Supply And Installation Of Steam Flow Meter For Bisalpur Kisan Sahkari Chini Mills, Ltd., Bisalpur ( Pilibhit ) For The Season 2023-24 Competitive E-Bidding For Supply And Installation Of Steam Flow Meter For Bisalpur Kisan Sahkari Chini Mills, Ltd., Bisalpur ( Pilibhit ) For The Season 2023-24 , Description , Supply & Installation Of Complete Digital Steam Flow Indicator ( Meter ) , Size 96Mm X 96Mm, Calibrated As Required. 150 Nb ( 6 ) Sch. 80 Wnrf Class 600 A105 Opa Orifice Plate Flange Assembly Consisting Of Pair Of Wnrf Ibr Flanges In Astm A105, Square Edge Concentric Orifice Plate In Astm A240 Gr. 316, Butt-Weld Ends, Studs & Jackbolt In Astm A193 Gr.B7, Nuts In Astm A194 Gr. 2H, Spiral Gaskets, Two Pairs Of 1 / 2 Nptf Flange Taps With One Pair Plugged With Required Instruments Cable, Pressure Transmitter, Condensate Port Connection, Ibr Approved Globe Valve, Sleeveless Tube, Hp M.S. Tee, Hp M.S. Union, 3 Valve S.S. Manifold, M.S. Plough Etc. Complete With All Respect And Successful Trial & Commissioning In Boiler No. 01 & 02 ( Cap.-20 Ton ) . , Supply & Installation Of Complete Digital Steam Flow Indicator ( Meter ) , Size 96Mm X 96Mm, Calibrated As Required. 200 Nb ( 8 ) Sch. 80 Wnrf Class 600 A105 Opa Orifice Plate Flange Assembly Consisting Of Pair Of Wnrf Ibr Flanges In Astm A105, Square Edge Concentric Orifice Plate In Astm A240 Gr. 316, Butt-Weld Ends, Studs & Jackbolt In Astm A193 Gr.B7, Nuts In Astm A194 Gr. 2H, Spiral Gaskets, Two Pairs Of 1 / 2 Nptf Flange Taps With One Pair Plugged With Required Instruments Cable, Pressure Transmitter, Condensate Port Connection, Ibr Approved Globe Valve, Sleeveless Tube, Hp M.S. Tee, Hp M.S. Union, 3 Valve S.S. Manifold, M.S. Plough Etc. Complete With All Respect And Successful Trail & Commissioning In Boiler No. 03 ( Cap.-30 Ton ) , Supply & Installation Of Complete Digital Steam Flow Indicator ( Meter ) , Size 96Mm X 96Mm, Calibrated As Required. 150 Nb ( 6 ) Sch. 80 Wnrf Class 600 A105 Opa Orifice Plate Flange Assembly Consisting Of Pair Of Wnrf Ibr Flanges In Astm A105, Square Edge Concentric Orifice Plate In Astm A240 Gr. 316, Butt-Weld Ends, Studs & Jackbolt In Astm A193 Gr.B7, Nuts In Astm A194 Gr. 2H, Spiral Gaskets, Two Pairs Of 1 / 2 Nptf Flange Taps With One Pair Plugged With Required Instruments Cable, Pressure Transmitter, Condensate Port Connection, Ibr Approved Globe Valve, Sleeveless Tube, Hp M.S. Tee, Hp M.S. Union, 3 Valve S.S. Manifold, M.S. Plough Etc. Complete With All Respect And Successful Trail & Commissioning In Power Turbine No. 01 & 02 ( Cap.-1.5 Mw Belliss Make ) . Last date of submission for this tender is 2023-10-09. This is a Pressure Transmitters tender in Bisalpur, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
3 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free