🎉 Your free trial plan has started. Plan will expire in 0 days

Kanpur Electricity Supply Co Limited

kanpur nagar, uttar pradesh

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Kanpur Electricity Supply Co Limited has published Giving Connection To Kem Hall Releasing 50 Kw And Kotwali Building Releasing 17 Kw Load Use For Commercial In Single Point And Replacement Of L.T. Line To L.T. Abc Under Eudd-Phoolbagh Div.- 1 Loading Unloading & Carriage Of Material From Store Kesco To Work Site. 2 Ab Conductor 3X120+1 / 16+1X95 3 25 & 100 Kva. T / F 11 / 0.433Kv. 4 S.T. Poleforh.T. & L.T.Line As Per Respo Lucknow. Stock Issue Rate 2021-22 5 H.T. Xlpe Cable 3X70sqmm. 6 Other Item Etc. 7 Supply By Contractor 8 Stone Pad 300×300×75Mm. 9 Danger Board With Clamp 10 Earthing Complete 11 Number Plate 12 11 Kv Disc Insulater With Fitting For H.T. Line Taping 13 Dead & Clamp With Eye Hook And Holding Clamp 14 Dead & Clamp With Eye Hook 15 Dead In Sealing Cap 16 Alu. Lug 3×70 Sqmm. 17 L.T.D.B. C Type Box 18 G.I. Pipe / Hdpe Pipe 6 Dia 19 Errection Of Material 20 Errection Of Ht Double Pole Structure Fitting Of All Channelsbrackets, Insulators And Other Hardware Fittings Etc. 21 Errection Of Lt. Single Pole Structure Fitting Of All Brackets, Insulators And Other Hardware Fittings Etc. 22 Grouting Of Ht & Lt Pole Ith Cement, Brick Ballast And Coarse Sand As Per Standard Specification. 23 Making Of Pole Plinth As Per Standard Specification. 24 Painting Of Ht And Lt Pole One Coat With Red Oxide And 2 Coats With Isi Mark Enamel Paint. 25 Earthing Of Supports As Per Standard Specification 26 Fixing Of Stay Rod And Its Errection And Grouting By Fitting Of Straight Line Stay Wire And Its Proper Binding And Tighting Etc. 27 Opening Of H.T. Jumpher From The Existing 3 Phase 3 Wire H.T. Overhead Line For Errection Work 28 Opening Of L.T. Jumpher From The Existing 3 Phase 3 Wire L.T. Overhead Line For Errection Work 29 Digging Of Cable Trunch Pakka As Per Norms For Laying 11 Kv Xlpe Cable 30 Laying Of G.I. Pipe In Digging Trunch 31 Laying Of 11 Kv Xlpe Cable In Above Digging Trunch Covering With Brick And Back Filling And Proper Rmming 32 Laying Of 11 Kv Xlpe Cable Through G.I. Pipe In Digging Trunch 33 Making O / D Joints Of 11 Kv Xlpe Cable 34 Making And Mounting L.T. Distribution Box 35 Errection Of Distribution T / F On Plinth / Double Pole Structure 36 Errection Of H.T. Jumpher From Few Set To H.T. Bushing Of The Transformer 37 Making Of H.T. Section Points By Brackets Clamps And Insulators Tighting Of Line Binding Of Conductor And Proper Connection 38 Making Of H.T. Jumpher With 3 Phase 3 Wire H.T. Overhead Line After Errection 39 Newly Network System ( Old Systom To New Systom Encrgyes ) 40 Panting Of M.S. Structure Fitting On Pole Such As Channel Single Bracket 41 Supply Of 60 Mm. Dia ClassB G.I. Pipe 40 Long Including M.S. Flat 50×6Mm. Along With All Related Materials Required For Distribution T / F Earthing Work. 42 Boring 60 Deep & Connection Of Neutral Busing With G.I. Pipe Through M.S. Flat / Earth Wire With Proper Connection Arrangement. 43 Fabrication And Ercetion Of Distribution T / F Fencing Of Frame Size 3×2.4 Mtr. Including Cost Of M.S. Angle Size 40×40×5 And M.S. Flat Size 35×5, Fixing Of Welded Steel Wire Fabric On Steel Frams By Welding Of 10 Swg Wire Fabric, Including Painting Of Two Coats Of Paint On Iron Based Surfaces With Ready Mixed Paint To Give Bus Green Shade Including Evening Of Oil & Dust. 44 Laying Stringing, Tensioning And Binding Of Dog Conductor For H.T. / L.T. O.H. 45 Laying Stringing, Tensioning And Binding Of Earth G.I. Wire. 46 Erection Of Distribution T / F On Plinth / D / Pole Structure. 47 Fitting Of L.T.D.B. By Brackets & Clamps On Double Pole Structure & L.T. Cable Connection From T / F Cable To L.T.D.B. 48 Making Of Ht / Lt Shackelpoint 49 Opening Of Ht / Lt Jumphering. 50 Making Of Ht / Lt Jumphering 51 Road Restroration Charges For Pakka Roads Will Be Paid Nagar Nigam / Pwd 52 Newly Network System ( Old Systom To New Systom Encrgyes ) 53 Loading Unloading & Carriage Of Material Fromwork Site To Store Kesco . 54 Old And Use Conductor 55 Old And Used Pole. Last date of submission for this tender is 2022-07-25. This is a Brackets And Braces tender in Kanpur Nagar, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

3 issued
  • Tender Document 1pdf
  • Tender Document 2pdf
  • Tender Document 3html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in