🎉 Your free trial plan has started. Plan will expire in 0 days

Kanpur Electricity Supply Co Limited

kalyanpur, uttar pradesh

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Kanpur Electricity Supply Co Limited has published Work For Attending Breakdown As Well As Maintenance, Change The Damaged Pole, Feeder And Lines With Loading And Unloading Of Materials, Equipment, Annual Maintenance Of Transfer And Other Related Work In Kalyanpur Divsion- 1 Pole Work 2 Dismentalling Of X-Arm / L.T. Brackets And Insulators Etc. From The Damaged Pole / Pole To Be Replaced / Shifted. 3 Excavation Of Foundation And Taken Out The Damaged Pole / Pole To Be Replaced / Shifted From The Ground. 4 Strengthening Of Damaged Pole By Providing And Welding Of Pipe Or Angle By Overlapping In The Place Of Damaged Portion. 5 Loading, Carriage And Unloading Of Poles From Store To Work Site. 6 Loading, Carriage And Unloading Of Damaged Poles From Work Site To Store. 7 Loading, Carriage And Unloading Of Damaged Pcc Poles Fromstore To Work Site. 8 Grouting Of Pole With Cement Brick Ballast And Coarse Sand As Per Standard Spacification. 9 Grouting Of Pcc Pole With Cement Brick Ballast And Coarse Sand As Per Standard Spacification. 10 Erection Of Old / New Steel Tubular Pole For H.T. O.H. / L.T. O.H. Line And Fitting Of X-Arms / L.T. Brackets, Insulators And Other Hardware Fittings. 11 Erection Of Pcc Pole For H.T. O.H. / L.T. O.H. Line And Fitting Of X-Arms / L.T. Brackets, Insulators And Other Hardware Fittings. 12 Making Plinth Of Single Pole Of 400 Mm Dia, 600 Mm Height ( 200Mm Underground ) With C.C. In Ratio 1:4:8 Of Cements, Stone Ballast And Coarse Sand Including Cost Of Materials. 13 Painting Of Steel Tubular Poles After Rubbing, Cleaning With Emery Paper And Coating One Coat Of Redoxide On Full Length Of Pole And Then Two Coat Of Aluminum Paint Upto X-Arm From Top Including Cost Of Paint And Redoxide Paint Used Should Be Isi Mark Ist Class Enamel Paint. 14 Erection Of Double Pole Structure Including Fixing Of T.P.M.O. ( If Available ) Top Channel, Fuse Set On Fuse Set Channel Etc. As Per Standard Specifications. 15 Making Plinth Of Double Pole Structure In Size Of 450X2250x600mm ( 200Mm Depth Underground ) With C.C. Ratio 1:4:8 Of Cement, Stone Ballast And Coarse Sand Including Cost Of Materials. 16 Making Of A Double Pole Structure By Erection A Single Pole With A Specific Distance From Existing Single Pole On A Running H.T. Line, Fixing Of T.P.M.O. ( If Available ) ( Top Channel, Fuse Set Channel Etc. As Per Standard Specification ) 17 Erection Of Tri-Pole Structure Including Fitting Of Channels Etc. And Proper Alignment. 18 Erection Of Four Pole Structure Including Fitting Of Channels Etc. As Well As Proper Alignment Of Structure. 19 Increasing The Pole Length To Cross H.T. / L.T. Oh Line By Welding Of M.S. Pipe With All Material 20 Erection Of Stud Pole / Fly Stay And Fixing Of Stay Wire Etc. For Complete Erection. 21 Fixing Of Stay Rod And Its Erection By Fitting Of Stay Clamp. Stay Wire And Its Proper Binding And Tightening Etc. 22 Line Work ( Conductor ) 23 Dismentalling Of Binding Wire From Insulators And Lossening Of The Conductor On Each Pole Then Lowering Down The Conductor & Rolling In To Bundles. 24 Loading, Carriage And Unloading Of Conductor Fromstore To Work Site And Vice Versa 25 Re-Sagging Of Conductor, On Old Line After Erection Of Pole, Binding Of Conductor Etc. 26 Laying, Stringing, Tensioning And Binding Of Weasal Conductor For H.T. / L.T. O.H. 27 Laying, Stringing, Tensioning And Binding Of Dog Conductor For H.T. / L.T. O.H. 28 Fixing Of Guarding Angle / Guarding Channel For Laying Of Guarding 29 Laying, Stringing, Tensioning & Final Sagging Ofearth Wire / G.I. Wire 30 Cross Laying Of Guarding By G.I. Wire ( Approximate 5 Lacing Of Each Span ) 31 Opening Of H.T. Jumpers From The Existing 3 Phase 3 Wire H.T. O.H. Line For Erection Work. 32 Opening Of L.T. Jumpers From The Existing L.T. O.H. Line For Erection Work. 33 Making Of H.T. Section Points By Brackets, Clamps & Insulator, Tightening Of Line, Binding Of Conductor & Proper Connection. 34 Making Of L.T. Shackle Point By Brackets, Clamps, G.I. Shakle Strips And Insulators, Tightening Of Line, Binding Of Conductors And Proper Connections. 35 Fabrication / Modifications Of M.S. Items As Per Requirement Of Site Conditions. 36 Jumpering Of H.T. Lines From The Existing H.T.O.H. Line. 37 Jumpering Of L.T. Lines From The Existing L.T.O.H. Line. 38 Triming Of Tree Branches Which Are In Range Of Line Conductor To Avoide Breakdown, Triming Due To Tree Branche ( Per Tree ) Cutting Of Tree Branches For Normal Clearance Of H.T. As Well As L.T.O.H. Lines. 39 Line Work ( Ab Cable ) 40 Dismentalling Of Aerial Bunched Cable From L.T. O / H ( Damage ) Line. 41 Loading, Carriage And Unloading Of Aerial Bunched Cable From Store To Work Site And Vice Versa. 42 Laying Of Aerial Bunched Cable For Erection Of L.T. O / H Line. 43 Taking Out Cable From Drum. 44 Mounting & Erection Of Single Phase Distribution Box. 45 Mounting & Erection Of Three Phase Distribution Box. 46 Opening And Reconnection Of Consumer Connections For Shifted / Replaced Of Pole. 47 H.T. / L.T. Cable Work 48 Taking Out New / Old Cable From Cable Drum And Then After Transportation From Store To Work Site Or Vice-Versa. 49 ( A ) H.T. Cable 50 ( B ) L.T. Cable 51 Digging Of Cable Trench In Size Of 30 Cm Wide And 60 To 90 Cm Meter Deep As Per Site Requirement For Laying Of Cable- 52 ( A ) Normal Soil 53 ( B ) Kharanja Road 54 ( C ) Metallic Road 55 Laying Of Cable In The Abovedigging, Trench, Covering With Bricks, Sand And Back Filling. 56 ( A ) H.T. Cable 57 ( B ) L.T. Cable 58 Laying Of H. T. Cable Through Hume / C.I. / Ms. Pipe In Digged Trench And Back Filling. 59 ( A ) H.T. Cable 60 ( B ) L.T. Cable 61 Taking Out ( Old & Used ) H.T. Cable By Digging Of Trench From Site And Then Rolling In To Bundles. 62 ( A ) H.T. Cable 63 ( B ) L.T. Cable 64 Restoration Of Metallic / Rcc Road After Proper Repairing With Appropriate Materials. 65 Making Of Cable Box For 11 / 6.6 Kv 3X50 To 3X300 Mm2 For Xlpe / Pillca Cable ( Jointing Kit Will Be Provided By Kesco. ) 66 Stringing Of H.T. / L.T. Cable In Different Sizes As Same As H.T. / L.T. Overhead Line : 67 A ) Single Core L.T. Cable 68 B ) 3 ½ Core L.T. Cable 69 C ) 11 Kv H.T. Cable 70 H.T. / L.T. P.B. & H.T. / L.T. M.C. Work 71 Loading, Carriage And Unloading Of H.T.P.B. Form Store To Work Site And Then After Erection On The Relay Constructed Plinth. 72 Loading, Carriage And Unloading Of H.T.M.C. From Store To Site Or Vice-Versa. 73 Erection Of H.T. Metering Cubical On Plinth As Per Standard Norms. 74 Construction Of Plinth For H.T. Pilffer Metering Cubical. 75 Dismentalling Of H.T. Pilffer Metering Cubical. 76 Erection Of L.T. Metering Cubical As Per Standard Norms And Connection Of L.T. Cable Including Crimping Of Lugs Etc. 77 Earthing Of Supports / Metering Cubical / Htpb Etc. As Per Standard Specifications. 78 Out Door Metering Unit Work 79 Loading, Carriage & Unloading Of O / D Type Metering Unit From Store To Site & Vice-Versa. 80 Erection Of O / D Type Metering Unit On D / P Structure. 81 Connection Of H.T. Jumper To Ht Bushing Of O / D Type Metering Unit. 82 Distribution T / F Work 83 Construction Of T / F Plinth, Suitable For Mounting Of Distribution Transformer. Size Of The Plinth Will Be 1.2 X 1.2 X 1.2 Meter Solid With Brick Work. 75 Mm Thick C.C. In Ratio 1:4:8 With Cement, Coarse Sand And Brick Ballast Laid On The Base And 75 Mm Thick Done On All The Exposed Sides To The Plinth. 84 Loading, Carriage & Unloading Of Distribution Transformers ( Up To 630 K.V.A. ) From Store To Site & Vise-Versa. 85 Erection Of Distribution T / F On Plinth / D / Pole Structure. 86 Connection Of H.T. Jumper From Fuse Set To H.T. Busing Of The Transformer. 87 Fitting Of L.T. D.B. By Brackets & Clamps On Double Pole Structure & L.T. Cable Connection From T / F Cable To L.T.D.B. 88 Connection Of L.T. Cable From L.T.D.B To L.T.O.H. 89 To Provide Of Distribution T / F Fencing Of Frame Size 3X2.4 Mtr. Including Cost Of M.S. Agnle Size 40X40x5 And M.S. Flat Size 35X5, Fixing Of Welded Steel Wire Fabric On Steel Frames By Welding Of 10 Swg Wire Fabric, Including Painting Of Two Coats Of Paint On Iron Based Surfaces With Ready Mixed Paint To Give Bus Green Shade Including Clening Of Oil & Dust. 90 Reparing Distribution T / F Fencing With All Material And Painting Of Two Coats Of Paint On Iron Based Surfaces With Ready Mixed Paint To Give Bus Green Shade Including Clening Of Oil & Dust. 91 Supply Of 40Mm Dia Class B G.I. Pipe 40 Long Including M.S. Flat 50X6 Mm Along With All Related Materials Required For Distribution T / F Earthing Work And Boring 39 Deep & Connection Of Neutral Bushing With G.I. Pipe Through M.S. Flat / Earth Wire With Proper Connection Arrangement. 92 Disconnection Of H.T. / L.T. Lines, Shifting Of T / F From Ground To A Safe Place For Construction Of T / F Plinth. 93 Shifting Of T / F From Ground To Plinth And Re-Connection Of H.T. L.T. Lines As Well As Earthing For Proper Completion. 94 Capacity Of Transformers ( 100Kva-250Kva ) 95 Routine Checking Of Distribution T / F As Per AnnexureA 96 Removal & Rerfitting Of H.T., L.T. & Top Cover With Draining & Refilling Of Oil 97 Attending Oil Leakage By Replacement Of Gasket, Packing & O-Ring Etc. 98 Replacement Of Hv Bushing / Bushing Rod. 99 Replacement Of Lv Bushing / Bushing Rod. 100 Repairing & Dressing Of Damaged Lt Cable By Cutting & Lugging Etc. 101 Capacity Of Transformers ( 400Kva-630Kva ) 102 Routine Checking Of Distribution T / F As Per AnnexureA 103 Removal & Rerfitting Of H.T., L.T. & Top Cover With Draining & Refilling Of Oil 104 Attending Oil Leakage By Replacement Of Gasket, Packing & O-Ring Etc. 105 Replacement Of Hv Bushing / Bushing Rod. 106 Replacement Of Lv Bushing / Bushing Rod. 107 Repairing & Dressing Of Damaged Lt Cable By Cutting & Lugging Etc. 108 Cleaning Of Surrounding Of Distribution Transformer. Last date of submission for this tender is 2022-11-02. This is a Tree Cutting tender in Kalyanpur, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

3 issued
  • Tender Document 1html
  • Tender Document 2pdf
  • Tender Document 3pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in