Irrigation Department
- AOC value
- ₹18.7L
- AOC date
- 5 Feb
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 5 Feb 22AOC date
- -Published
- -Closes
- -Bid opens
- 5 Feb 2022AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 05/02/2022
- Authority
- Irrigation Department
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Irrigation Department has published Construction Of Vrb Of Kamalpur Dy At Km 4.300 Lot No 3 Construction Of Vrb Of Kamalpur Dy At Km 4.300 , Earthwork In Excavation Of Foundation In Ordinary Soil Including All Lift & Lead And Including Back Filling, Watering And Ramming Excavated Earth Into The Trenches Or Into The Space Between The Structure And The Side Of Foundation Trenches Or Into The Plinth With Removal And Disposal Of Surplus Earth As Direction Of Engineer-In-Charge From The Foundation Trenches Including Cost Of Labour, All T & P, Leads And Lift Etc Complet. , Providing And Laying M-10 ( C.C.1:3:6 ) Cement Concrete Including Cost Of All Materials, Labour T & P, All Lifts And Leads Etc. Complete , Providing And Laying C.C. M-15 ( 1:2.4 ) Cement Concrete Including Cost Of All Materials, Labour T & P, All Lifts And Leads Etc. Complete. , Providing And Laying First Class M-150 Brick Work In ( 1:4 ) Cement Mortar Including Cost Of All Materials, Labour T & P, All Lifts And Leads Etc. Complete. , Providing And Fixing Centering & Shutteringfor Rcc And Cc Works ( Fromwork Of Concrete ) Including Cost Of All Material, Labour, T&P, All Lifts And Leads, Etc For Proper Completion Of Work . , Providing And Laying C.C. M-25 ( 1:1:2 ) Cement Concrete Including Cost Of All Materials, Labour T & P, All Lifts And Leads Etc. Complete. , Providing And Laying R.C.C. M-20 ( 1:1.5:3 ) Cement Concrete Including Cost F All Materials, Labour T & P, All Lifts And Leads Etc. Complete. , Providing And Fixing Steel Reinforcement Including Cost Of Steel, Binding Wire, Bending, Binding, Welding, Cutting, Placing In Proper Position, All Lifts And Leads , All Labour And T&P Etc , Supply And Fixing 75 Mm Dia G.I. Pipe Including Cost Of All Materials, Labour T & P, All Lifts And Leads Etc. Complete. , Providing & Laying Of 12 Mm Thick Plaster In 1:4 Cement Mortorincluding Cost Of All Material, Labour, T&P, Curing Etc Complete For Proper Completion Of Work , Supply And Fixing Of 20Mmexpansion Joint In Slab Between Dirt Wall And Slab Including Cost All Labour, T&P Material Etc Complete As Per Direction Of Engineer - In Charge. , Providing And Painting Bitumen ( 85 / 40 Grade ) In Two Coats Including Cost Of All Material T&P Heating Labour All And Leads Etc Complete As Per Direction Of Engineer-In-Charge. , S / L Of Two Coat Tar Felt Painting Including Cost Of All Material, Labour, T&P Complete For Proper Completion Of Work , Providing And Laying Local Sand Below Floor Including Cost Of All Materials, Labour T & P, All Lifts And Leads Etc. Complete. , Earth Work In Filling In Embankment In Ordinary Soil Including Ramming And Dressing The Surface To Be Required Levels And Slopes And Also Includingall Lift And Lead Upto 1 Km Distance Including Cost Of All Labour T&P Etc Complete As Directed By Engineer-In- Charge. , Laying Brick On Egde On Road Laid Dry Joints Sand Filled Including Preparation Of Base To Proper Slope And Its Rammingincluding All Labour T&P Etc Complete As Directed By Engineer-In- Charge.. Last date of submission for this tender is 2022-01-01. This is a Coats And Jackets tender in null, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free