Irrigation Department
- AOC value
- ₹4.23L
- AOC date
- 7 Jul
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 7 Jul 23AOC date
- -Published
- -Closes
- -Bid opens
- 7 Jul 2023AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 07/07/2023
- Authority
- Irrigation Department
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Irrigation Department has published Tender For Mechanical Works Of Hydromechanical Equipments At Harewali Barrage, Distt-Bijnor Under Annual Maintenance- 1 Harewali Barrage ( Gate Size : 18.00 X 5.52 Mtr.= 03 Nos. And 18.00 X 4.30 Mtr. = 17 Nos. 2 Greasing, Oiling Of All Components Of Lifting Mechanism Of Gates ( Excluding Rollers, Drum Gear And Pinion ) After Proper Cleaning With Replacing Grease Cup / Grease Nipple As Required Including Cost Of All Material, Labour And T&P Etc. Required For Proper Completion Of Work. ( Gate No. 1 To 20. ) 3 Applying Cardium Compound On Steel Wire Ropes, Drums Gears, Pinions Of Gates After Proper Cleaing Including Cost Of All Materials, Labour, T&P Etc. Required For Proper Completion Of Work. ( Gate No. 1 To 8. ) 4 Replacing, Filling Gear Oil In Redicon Unit / Reduction Gear Box After Cleaning Including Cost Of All Material, Labour Nad T&P Etc. Required For Proper Completion Of Work. Gate No. 6 To 20 5 Overhauling Of Redicon Unit By Repairing After Desmanting, Cleaning An Washing. Reparing Of Main Shaft Sheet By Welding And Turning, Replacing All Damaged / Broken Parts And Providing & Fitting New Parts As Per Required. Assemling The Redicon Unit With Proper Oiling And Greasing And Fitting At Site Including Cost Of All Material, Labour T&P Scaffolding Carrieage Etc. For Proper Completion Of Work. Gate No. 1 To 5 6 Replacing Broken / Missing, Damaged Bolts, Unitin Hydromechanical Equipments And Their Components After Proper Checking Of Bolts, Nut Including Cost Of All Material, Labour, T&P Etc. Required For Proper Completion Of Work. Gate No. 1 To 10 7 Digging And Taken Out Slush From The Boxes And Near By Gates Including Removal Of Slush Beyond30.00 Meter From Boxes Including Cost Of All Labour And T&P Etc. For Proper Completion Of Work In Gate No. 17 To 20. 8 Harewali Head Regulator ( Gate Size : 8.80 X 2.65 Mtr.= 05 Nos. ) 9 Greasing, Oiling Of Components Of Lifting Mechanism Of Gates Excluding Proper Cleaning With Replacing Grease Cap / Grease Nipple As Required Including Cost Of All Material, Labour And T&P Etc.Required For Proper Completion Of Work. ( Gate No. 1 To 5. ) 10 Applying Cardium Compound On Steel Wire Ropes, Teeth Ofdrums Gears, Pinions Of Gates After Proper Cleaing Including Cost Of All Materials, Labour, T&P And Scaffolding With Safety Arrangments As Required For Proper Completion Of Work. ( Gate No. 1 To 5. ) . Last date of submission for this tender is 2023-05-27. This is a Bolts tender in Bijnor, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
5 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3xlsxXLSX document
- Tender Document 4pdfPDF document
- Tender Document 5pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free