East Central Railway
Important Info
AOC Description
East Central Railway has published Supply Of Brake Control System (E-70 Brake Control).Brake Control System (E-70 Brake Control).,Brake Control System (E-70 Brake Control) Including Drivers Vigilance Control Device For Wag-9Hc Of Electrical Locomotives, Specn. No. Clw/Ms/3/001 Alt.17 And Latest. As Per Annexure Attached. Only M/S Faively Make E-70 Brake Control System Ft0053084-104 Rev.-A 01 (E-70 Brake Control). [ Warranty Period: 72 Months After The Date Of Delivery ] ]. Last date of submission for this tender is 2025-08-11. This is a Railway Ancillaries tender in Mughalsarai, Uttar Pradesh
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

