🎉 Your free trial plan has started. Plan will expire in 0 days

Department Of Irrigation

kanpur, uttar pradesh

AOC value
₹14.37L
AOC date
18 Mar
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 18 Mar 25AOC date

Important info

Result ID
Refer Docs
Award of contract
18/03/2025
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Department Of Irrigation has published Tender For Bridge Work - Repair Of Revona Dy V.R.B At Km 24.559 - E/W in embankment/road diversion including caution radium sign board, baricating with bamboo/balli & necessary safety fixtureslift upto 1.50 m. and lead upto 60 m. and including filling, watering and ramming of excavatedearth asdirectedbytheEngineer-in-charge. 2 Earth work in foundation in dry ordinary soil (Loam, clay or sand) including lift upto 1.50 m. and lead upto 30 m. including filling, watering and ramming of excavatedearthintothetrenchesorintothespace betweenthestructureandthesidesoffoundation trenches or into the plinth with removal and disposal ofsurplusearthasdirectedbytheEngineer-in- chargeupto adistance of 30 m. from the foundation trenches. 3 Earthworkincuttingorinembankmentinordinary soil, excavation to be in the form of irregular pits and earthworkinembankmenttobein20cm.layers, includingramminganddressingthesurfacetothe requiredlevelandslopesandalsoincluding1.5m. lift and 30 m. lead: The earth form cutting to be used inmakingembankmentortobedepositedasspoil bank within 30 m. distance as directed by theEngineer-in-charge. 4 Providing & laying Cement Concrete (M10) 1:3:6 (1 cement :3 coarse sand : 6 Aggregate) in foundation with cement coarse sand and stone grit 20-40mm gauge including proper curing and compaction including cost of all material, Labour T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. 5 1st class Brick (M150) work 1:4 Cement Mortar including Labour T&P etc complete workas per ID specification & directionas per Engineer-in -charge. 6 Cenetering & shuttering for Reinforced Cement Concrete work including cost of shuttering, material, Labour, T&P etc required for proper completion of workas per ID specification & directionas per Engineer-in -charge. 7 Providing & laying Reinforced Cement Concrete (M20) 1:1.5:3 (1 cement :1.5 coarse sand : 3 Aggregate) with cement coarse sand and stone grit 20mm gauge including proper curing and compaction including cost of all material, Labour T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. 8 Providing andLayingSteel reinforcement including cutting, bending, binding & placing in position including cost of all material, Labour T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. 9 Providing & laying Wearing coat with Cement Concrete (M20) 1:1:2 (1 cement :1 coarse sand : 2 Aggregate) with cement coarse sand and stone grit 20mm gauge including proper curing and compaction including cost of all material, Labour T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. 10 Cement Plasterin 1:4 (cement 1: 4 coarse sand )including cost of all material, Labour T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. 11 Brick on edge floor with class 150 brick laid dry joint sand filling ancludingpreparation of base with proper slops and its rammming including cost of all material, Labour T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. 12 Providing & laying Reinforced Cement Concrete (M20) Coping Work 1:1.5:3 (1 cement :1.5 coarse sand : 3 Aggregate) with cement coarse sand and stone grit 20mm gauge including proper curing and compaction including cost of all material, Labour T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. 13 Painting work with two coat acrylic smooth exterier paint including cost of all material, Labour T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. 14 Letter writting upto 10 cm Ht. such as Name, chanaige, span etc.including cost of all material, Labour T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. . Last date of submission for this tender is 2025-02-18. This is a Bridge Work tender in kanpur, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

7 issued
  • Tender Document 1html
  • Tender Document 2xlsx
  • Tender Document 3pdf
  • Tender Document 4pdf
  • Tender Document 5pdf
  • Tender Document 6pdf
  • Tender Document 7pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in