Dakshinanchal Vidyut Vitran Nigam Limited
- AOC value
- Refer Docs
- AOC date
- Refer Docs
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- -AOC date
- -Published
- -Closes
- -Bid opens
- -AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- Refer Docs
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Dakshinanchal Vidyut Vitran Nigam Limited has published Construction Of Line , Line Shifting Work-2 Carriage Of Line Material From Store Centre Hansari To Work Site Errection And Commissioning Of 11 Kv Line On Single Pole Work Includes Earthing, Grouting, Laying, Sagging, Strengthing, Binding Of Conductor Andall Work Required To Errect The Line As Per Respo Manual And Rates. 3 Pcc Pole 8.5 / 9 Mtr. Long 4 St Pole 11 / 13 Mtr. Long 5 Complete Stay Set ( Material Will Be Provided By Department ) . 6 Complete Earthing Rod ( Material Will Be Provided By Department ) . 7 Weasel Conductor ( Material Will Be Provided By Department ) . 8 Rabbit Conductor ( Material Will Be Provided By Department ) . 9 Dog / Racoon ( Material Will Be Provided By Department ) . 10 Abc 3X50 ( Material Will Be Provided By Department ) . 11 Abc 3X95 ( Material Will Be Provided By Department ) . 12 Abc 3X120 ( Material Will Be Provided By Department ) . 13 Errection And Commissioning Ofdouble / Tri Suport Pcc Pole 8.5 / 9 Meter Long / St Pole 11 / 13 Mtr. Long Work Includes Earthing, Grouting, Laying, Sagging, Strengthing, Binding Of Conductor Andall Work Required To Errect The Lineand Work Includes Carriage Of All Centralized Required Material And Material Will Be Provided By The Department ( Grouting Material Will Be Provided By The Contractor ) As Per Respo Manual And Rates. 14 Double Pole Structure For Stp 15 Double Pole Structure For Pcc 16 Concreating Of Support 17 Concreating Of Stay 18 Providing And Fixing Of Nut Bolt And Washer As Per Site Requirement 19 Extra Pit Digging As Per Site Requirement 20 Errection And Commissioning Of11 / 0.4 Kva Sub-Station And Material Required For Ht / Lt Metering System On Pcc Pole / Meter Room Incuding All Work Required For Energising The Line And Work Includes Carriage Of All Centralized Required Material And Material Will Be Provided By The Department ( Grouting Material Will Be Provided By The Contractor ) As Per Respo Manual And Rates. 21 16 / 25 / 63 / 100 Kva Transformer. 22 Tree & Tree Branches Promming / Cutting 23 Guarding Of 11Kv Line At Road Crossing And Htline Inside Of Village By Laying Two Nos. G.I Wire Paraller And Fixing Of Lacing Till At A Distance At 2-3 Mtr. As Per Respo Manual And As Per Direction Of Engineer Incharge. 24 Fixing Of Distrubution Box On Pole As Per Direction Of Engineer Incharge. 25 Laying Of 11 Kv Xlpe 3X70 & 3X120 Cable As Per Respo Maual And Including Costof Labour. 26 Fixing Of 11 Kv 3X70 & 3X120 I / D And O / D Cable Boxes 27 Carriage Of 11 Kv Metering Cubical Different Ratio 28 Instalation Of 11 Kv Metering Cubical Different Ratio 29 Dismentlling Of Old Pcc / Stp Pole 30 Dismentlling Of Old Weasal Conductor. Last date of submission for this tender is 2022-12-27. This is a Bolts tender in Mauranipur, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
3 issued- Tender Document 1pdfPDF document
- Tender Document 2pdfPDF document
- Tender Document 3htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free