🎉 Your free trial plan has started. Plan will expire in 0 days

Dakshinanchal Vidyut Vitran Nigam Limited

etawah, uttar pradesh

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Dakshinanchal Vidyut Vitran Nigam Limited has published Work to be done under deposit scheme head against various packages approved under Electricity Distribution Section II, Etawah - Carriage of PCC pole from Store Center Kunera Etawah to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. 2 ST 11 Mtr. Long/PCC 8.5 Mtr. Long Pole 3 Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel, Different type of Clamps and other required material 4 ACSR Weasel Conductor 5 11 Kv XLPE Cable 3x185 Sqmm 6 25 KVA Distribution Transformer 7 63 KVA Distribution Transformer 8 100 KVA Distribution Transformer 9 Erection Grouting, Concreting and plinting of single support on PCC Pole 8.5 Mtr. Long with cement, coarse sand & stone ballast duly grouted including necessories clamps, accessories required fixing of HT/LT fittings as per Resspo norms. The support shall be grouted in cement, sand and brick ballast. It including the cost of all labour, T&P etc. required for proper completion of work. 10 Erection Grouting, Concreting and plinting of Double Pole with cement, coarse sand & stone ballast duly grouted including necessories clamps, accessories required fixing of HT/LT fittings as per Resspo norms. The support shall be grouted in cement, sand and brick ballast. It including the cost of all labour, T&P etc. required for proper completion of work. 11 Laying, sagging, stringing, binding & jumpering of ACSR Weasel Conductor on the newly erected pole asperRESPOmanualandasperdirectionofsupervising engineer,includingthecostofarrangementoflabour,T&P carrier etc. required for proper completion of work. 12 Erection and grouting of staycomplete including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of allgrouting material, labour, T&P etc. required for proper completion of work as per RESSPO Manual. 13 Fixing &connectingofEarthingRods as perRESSPOManual includingthecostoflabour,T&Petc.requiredforproper completion of work. 14 Mounting of 25 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof. 15 Mounting of 63 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof. 16 Mounting of 100 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof. 17 Digging, laying and back filling of 3X185 Sqmm XLPE cable including the cost of Cable hoisting and making loops/ HDPE pipe/clamps as per RESPO manual and as per direction of supervising engineer including the cost of arrangementof brick, sand, labour and T&P etc. required for proper completion of the work. 18 Filling Of 11 Kv Heat Shrinkable Cable Jointing Kit (Indoor/Outdoor Type) Suitable for XLPE 3x185 Sqmm with Supply. (including the cost arrangement of labour, T&P, carrier etc. required for proper completion of work) 19 Guardingof HT/LT 11 Kv Line with GI wire as per RESPO Norms. includingthe costofarrangementoflabour, T&P etc required for proper completion of work. 20 Installation & Fixing of following accessories. includingthecostoflabour, T&P and carrier etc. required for proper completion of work. 21 11 Kv Polymer Pin Insulator 22 11 Kv Polymer Disc Insulator 23 11 Kv X Arm Clamp 24 F Clamp 25 T-Off Channel 26 Holding Clamp 27 Dropper Channel 28 Top Channel 29 Nut Bolt with Washer off Size 30 T/F Base Angle 31 Fuse Set 32 11 Kv DP Clamp 33 Guarding Angle . Last date of submission for this tender is 2025-05-02. This is a Wall Construction tender in Etawah, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

3 issued
  • Tender Document 1html
  • Tender Document 2xlsx
  • Tender Document 3pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in