Dakshinanchal Vidyut Vitran Nigam Limited
- AOC value
- Refer Docs
- AOC date
- Refer Docs
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- -AOC date
- -Published
- -Closes
- -Bid opens
- -AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- Refer Docs
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Dakshinanchal Vidyut Vitran Nigam Limited has published tender for Work to be done under Deposit Scheme item against various packages under Electricity Distribution Division II, Etawah., 1 Carriage of PCC pole from Store Center Kunera Etawah to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. 2 ST/PCC pole 3 Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel, Different type of Clamps and other required material 4 3x50 Sqmm AB Cable 5 ACSR Weasel Conductor 6 3.5x120 Sqmm XLPE Cable 7 3.5x70 Sqmm All. Cable 8 25 KVA Distribution Transformer 9 63 KVA Distribution Transformer 10 Erection ofsinglesupportbyST/PCC pole includingfixingcompleteHT/LT fittingsasperRESSPOMunualincludingthecostoflabour, T&P and carrier etc. required for proper completion of work. 11 Groutingofsinglesupport ST/PCC pole asperRESSPOManual including of the cost of labour,T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. 12 Erection & grouting ofdouble pole including fixing completeHT/LTfittingasperRESSPOManualincludingthe cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. 13 Laying, sagging, stringing, binding & jumpering of ACSR Weasel Conductor on the newly erected pole asperRESPOmanualandasperdirectionofsupervising engineer,includingthecostofarrangementoflabour,T&P carrier etc. required for proper completion of work. 14 Laying, sagging, stringing, binding & jumpering of 3.5x70 Sqmm All. Cable on the newly erected pole asperRESPOmanualandasperdirectionofsupervising engineer,includingthecostofarrangementoflabour,T&P carrier etc. required for proper completion of work. 15 Layingspreading,liftingandfinalsaggingofArialBunched Cable(allsize). includingfixingof allaccessoriesasper RESSPO Manual and as per direction ofsupervising engineer, includingthecostofarrangementoflabour,T&Pcarrieretc. required for proper completion of work. : 16 Erection and grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of allgrouting material, labour, T&P etc. required for proper completion of work as per RESSPO Manual. 17 Fixing &connectingofearthingrods as perRESSPOManual includingthecostoflabour,T&Petc.requiredforproper completion of work. 18 Mounting of 25 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof. 19 Mounting of 63 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof. 20 Digging, laying and back filling of 3X120 Sqmm XLPE cable including the cost of Cable hoisting and making loops/ HDPE pipe/clamps as per RESPO manual and as per direction of supervising engineer including the cost of arrangementof brick, sand, labour and T&P etc. required for proper completion of the work. 21 Filling Of 11 Kv Heat Shrinkable Cable Jointing Kit (Indoor/Outdoor Type) Suitable Size with Supply. (including the cost arrangement of labour, T&P, carrier etc. required for proper completion of work) 22 Guardingof HT/LT 11 Kv Line with GI wire as per RESPO Norms. includingthe costofarrangementoflabour, T&P etc required for proper completion of work. 23 Installation & Fixing of following accessories. includingthecostoflabour, T&P and carrier etc. required for proper completion of work. 24 Polymer Pin Insulator 25 Disc Insulator 26 11 Kv Fuse set 27 Top Channel 28 11 Kv F Clamp 29 Distribution Box 30 T-Off Channel 31 T/F Base Angle 32 MS Dropper Channel 33 11 Kv V type Steel Cross Arm 34 11 Kv Cross Arm Clamp for PCC 35 11 Kv DP Clamp 36 Nut Bolt 37 Guarding Angle . Last date of submission for this tender is 2024-12-09. This is a Fuses tender in Etawah, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
3 issued- Tender Document 1htmlHTML document
- Tender Document 2xlsxXLSX document
- Tender Document 3pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free