🎉 Your free trial plan has started. Plan will expire in 0 days

Dakshinanchal Vidyut Vitran Nigam Limited

mathura, uttar pradesh

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Dakshinanchal Vidyut Vitran Nigam Limited has published tender for T-03 The Work Of Construction Ht/Lt Line And Double Pole And Other Work At Various Places Under Deposit Scheme At The Area Of Edsd-Farah In Jurisdiction Of E.D.D.-Ist, Mathura, 1 Carriage of 8.5 Mtr Long PCC Pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 2 Carriage of 9/11Mtr Long ST Pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 3 Carriage of 11 KV XLPE Cable size 3x70 sq.mm. form Store Center Mathura/Agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cableincluding loading & unloading at both ends. 4 Carriage of 25/63/100 KVA T/F form Store Center Mathura to Site of work including loading & unloading at both ends (Distance 00-70Kms.) 5 Carriage of 10/16 KVA T/F form Store Center Mathura to Site of work including loading & unloading at both ends (Distance 00-70Kms.) 6 Carriage of Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends. 7 Erection of single pole structure 8.5 Mtrs on PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms. 8 Erection of single pole structure 9/11 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms. 9 Erection of Double pole structure 8.5 Mtrs on PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms. 10 Erection of Double pole structure 9/11 Mtrs onST Pole by digging of pits fitting of all relevant accessories as per RESPO norms. 11 Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works. 12 Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work. 13 Laying, sagging and stringing and jumpering / binding etc. of ACSR Weasel Conductor as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work 14 Laying, sagging and stringing and jumpering / binding etc. of Arial Bunch Conductor size 3x50/95/120 sq.mm in LT lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work 15 Laying of various size 11 KV XLPE Cable size 3x70 sq.mm. on the poles as per direction of supervising engineer. 16 Chopping of Tree branches to Clear the route properly. 17 Cutting of CC Road for making depth foundation for erection of pole. 18 Mounting of 25/63/100 KVA Transformer on the Double pole structures and connections thereof. 19 Mounting of 10/16 KVA Transformer on the Double pole structures and connections thereof. 20 Grouting of PCC/ST pole in ratio 1:4:8 cement, sand and brick ballast as per standard norms, including cost of all grouting material. 21 Installation of 11 KV Fuse Set as per RESPO Norms. 22 Installation of Distribution Box On etrected Pole. 23 Body and neutral earthing of transformers by digging pits 6” dia up to 3 mtr deep including inserting lowering 80mm dia G.I. and insert 50mm G.I. pipe chemical filled pipe (Pipe in pipe earthing) I.S.I. Mark B-Grade connecting with G.I. flat 50x6 mm Power Transformer to 80mm dia G.I. pipe and filling of chemical mixture around the G.I. pipe up to 3mtr. Including making of chamber. 24 Fixing of 11 KV Cable Indoor/Outdoor Jointing Kit of size 3x70 sq.mm Outdoor including removal of insulation, semi-conductor of the cable end and filling of cable box complete work as per direction of supervising engineer. 25 Carriage of 25 KVA T/F form Site to Store Center Mathura including loading & unloading at both ends (Distance 00-70Kms.) . Last date of submission for this tender is 2024-07-27. This is a Fuses tender in Mathura, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

3 issued
  • Tender Document 1html
  • Tender Document 2pdf
  • Tender Document 3pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in