🎉 Your free trial plan has started. Plan will expire in 0 days

Dakshinanchal Vidyut Vitran Nigam Limited

firozabad, uttar pradesh

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Dakshinanchal Vidyut Vitran Nigam Limited has published Work Of Issuing Connections Applied For Peyjal Schemes, Government Institutes And Other Works On Jhatpat And Nivesh Mitra Portal From Time To Time Under The Full Deposit Scheme (Advance) Under The Area Of Electricity Distribution Division, Firozabad. - Cartage of the following material fromStore Centre, Asfabad, Firozabad to dump site of work including loading and unloading at the respective ends and also including the work of dragging etc. [Distance 00.00 Km to 40 Km] 2 8.5/9 meter long PCC pole 3 11/13 meter long ST pole 4 Conductor, GI earth wire, cross arm, angle, channel, insulator other line material. 5 CT PT Unit of diff. ratings 6 11 KV/33 KV Cubical Box of diff. ratings 7 16 KVA transformer 8 25 KVA transformer 9 63 KVA transformer 10 11 KV XLPE cable 3x70 mm² / 3 x 120 mm²/3x185 mm²/3x300 mm² 11 Drilling of hole in channel, angle. 12 Painting of dropper channel, top channel, T channel and guarding angle with 2 quote of Red Oxide including the cost of paint. 13 Safe placement of 8.5/9 meter long PCC pole/ 11/13 meter long ST pole from dump site to the pit site of work including the work of dragging of the same through Kachha Pakka road. 14 Erection and grouting of double pole structure of 8.5/9 meter long PCC pole including fixing of HT fittings as per RESPO norms. The support shall be grouted in cement, sand, and brick ballast in ratio 1:2:4. 15 Erection of Single support of 8.5/9 meter long PCC pole including fixing of HT/LT fittings as per RESPO norms. The support shall be grouted in cement, sand, and brick ballast. 16 Erection of single support of 11/13 meter long ST pole duly grouted in cement, sand and brick ballast in ratio 1:4:8 including fixing of all HT fittings 17 Erection of double pole structure of 11/13 meter long ST pole duly grouted in cement, sand and brick ballast in ratio 1:4:8 including fixing of all HT fittings. 18 Construction of plinth of aforesaid newly erected 11/13 meter long ST pole as per RESPO norms in CC 1:2:4 ratio in cement, sand and stone grit duly 12 mm thick plaster in 1:4 ratio of cement and sand to give strengthening. 19 Grouting, fixing and nozzling of stay rod, andgrouting of stay rod shall be in ratio 1:4:8 [Cement, sand and brick ballast], as per RESPO norm, 20 Earthing of HT support through earthing rod & and connecting it properly as per RESPO norms. 21 Chopping of tree branches for clearance of line 22 Installation of Extra “T” as per RESPO manual 23 Installation of following Material in proper alignment and direction as per RESPO manual including the cost of arrangement of labourer, T&P etc required for proper completion of work. 24 16 KVA transformer 25 25 KVA transformer 26 63 KVA transformer 27 Digging, laying and back filling 11 KV XLPE cable 3x70 mm² / 3 x 120 mm²/3x185 mm² /3x300 mm² XLPE cable trench as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement ofbricks, sand, labourer, T&P etc. required for proper completion of work. 28 CT PT Unit of diff. ratings 29 Installation material Contractor arrangeby own his coast Installation of following line material in proper alignment and direction as per RESPO manual, including the cost fo arrangement of labourer, T&P etc. required for proper completion of work for the supervising engineer. 30 11 KV cross arm holding clamp with nut & bolt 31 11 KV U clamp with nut & bolt 32 11 KV F clamp with nut & bolt 33 Laying of 3x70 / 3x120 / 3x185 / 3x300 sqmm. XLPE cable in open and its making connection with transformer and 11 KV feeder also as per direction of supervising engineer. 34 Laying, stringing, sagging, binding and jumpering etc of weasel conductor as per RESPO norms. 35 Laying of Ariel bunch conductor cable of size 3x50 sqr. mm/ 3x95sqr mm 36 Laying, stringing, sagging, binding and jumpering etc of dog conductor as per RESPO norms. 37 Guarding of 11 KV line. 38 Installation of Distribution box as per RESPO manual and as per direction of supervising engineer. 39 Fixing of TPMO fuse set on newly erected transformers. 40 Installation of 11 KV/33 KV Cubical Box of diff. ratings 41 Filling and fixing of cable box suitable for XLPE cable, including the cost of arrangement of labourer, T&P etc. required for proper completion of work, but the box shall be provided by the corporation free of cost, as per actual sit requirement. . Last date of submission for this tender is 2025-06-16. This is a Civil Work tender in Firozabad, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

3 issued
  • Tender Document 1pdf
  • Tender Document 2pdf
  • Tender Document 3html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in