🎉 Your free trial plan has started. Plan will expire in 0 days

Dakshinanchal Vidyut Vitran Nigam Limited

etawah, uttar pradesh

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Dakshinanchal Vidyut Vitran Nigam Limited has published Tender for Work to be done against various packages approved under the deposit scheme under Electricity Distribution Section II, Etawah - Carriage of PCC Pole 8.5 Mtr. Long/STP-55 11 Mtr. Long from Store Center Kunera Etawah to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. 2 Safe carriage ofLine materialfrom store center Etawah to site of work. Including loading & unloading at both ends. including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. 3 Erection and grouting of Single pole structure. It also includes its grouting with cement, sand and brick for support, along with all relevant accessories, clamps and complete fixing of HT/LT fittings as per RESPO norms. 4 Erection and grouting of Double pole structure. It also includes its grouting with cement, sand and brick for support, along with all relevant accessories, clamps and complete fixing of HT/LT fittings as per RESPO norms. 5 Mounting of 25 Kva Transformer on the Single Pole/Double pole/Plinth structures and connections thereof. 6 Mounting of 63 Kva Transformer on the Single Pole/Double pole/Plinth structures and connections thereof. 7 Installation of stay set with grouting and Nuzzling etc. as per Resspo drawing /norms along with all routine material to be used for such works. 8 Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work. 9 Laying, sagging and stringing and jumpering / binding etc. ofACSR Weasel conductor in 11 KV/ LT lines as per Resspo manual and as per direction of Executive engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work 10 Installation & Fixing of following accessories. 11 Dropper Channel 12 Top Channel 13 TF Base Angle 14 11 Kv Fuse Set 15 11 Kv Composite Polymer Pin Insulator 16 11 Kv Polymer Disc Insulator 17 Nut Bolt with Washer Off Size 18 11 Kv Cross Arm Clamp for PCC 8.5 Mtr. Long 19 11 Kv F Clamp for PCC 8.5 Mtr. Long 20 MS T-Off Channel 21 11 Kv DP Clamp for PCC 8.5 Mtr. Long . Last date of submission for this tender is 2025-02-26. This is a Power Distribution Work tender in Etawah, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

3 issued
  • Tender Document 1html
  • Tender Document 2xlsx
  • Tender Document 3pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in