Dakshinanchal Vidyut Vitran Nigam Limited
- AOC value
- Refer Docs
- AOC date
- Refer Docs
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- -AOC date
- -Published
- -Closes
- -Bid opens
- -AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- Refer Docs
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Dakshinanchal Vidyut Vitran Nigam Limited has published Tender for Work to be done against various packages approved under the deposit scheme under Electricity Distribution Section II, Etawah - Carriage of PCC Pole 8.5 Mtr. Long/STP-55 11 Mtr. Long from Store Center Kunera Etawah to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. 2 Safe carriage ofLine materialfrom store center Etawah to site of work. Including loading & unloading at both ends. including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. 3 Erection and grouting of Single pole structure. It also includes its grouting with cement, sand and brick for support, along with all relevant accessories, clamps and complete fixing of HT/LT fittings as per RESPO norms. 4 Erection and grouting of Double pole structure. It also includes its grouting with cement, sand and brick for support, along with all relevant accessories, clamps and complete fixing of HT/LT fittings as per RESPO norms. 5 Mounting of 25 Kva Transformer on the Single Pole/Double pole/Plinth structures and connections thereof. 6 Mounting of 63 Kva Transformer on the Single Pole/Double pole/Plinth structures and connections thereof. 7 Installation of stay set with grouting and Nuzzling etc. as per Resspo drawing /norms along with all routine material to be used for such works. 8 Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work. 9 Laying, sagging and stringing and jumpering / binding etc. ofACSR Weasel conductor in 11 KV/ LT lines as per Resspo manual and as per direction of Executive engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work 10 Installation & Fixing of following accessories. 11 Dropper Channel 12 Top Channel 13 TF Base Angle 14 11 Kv Fuse Set 15 11 Kv Composite Polymer Pin Insulator 16 11 Kv Polymer Disc Insulator 17 Nut Bolt with Washer Off Size 18 11 Kv Cross Arm Clamp for PCC 8.5 Mtr. Long 19 11 Kv F Clamp for PCC 8.5 Mtr. Long 20 MS T-Off Channel 21 11 Kv DP Clamp for PCC 8.5 Mtr. Long . Last date of submission for this tender is 2025-02-26. This is a Power Distribution Work tender in Etawah, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
3 issued- Tender Document 1htmlHTML document
- Tender Document 2xlsxXLSX document
- Tender Document 3pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free