🎉 Your free trial plan has started. Plan will expire in 0 days

Dakshinanchal Vidyut Vitran Nigam Limited

etah, uttar pradesh

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Dakshinanchal Vidyut Vitran Nigam Limited has published Tender For Work Of Maintenance Of Ht/Lt Lines In The Area Of Edd-Jalesar Under Edc, Etah. - Safe carriage of 8.5 mtr. long PCC pole from store center Etah/nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading & unloading at both ends. 2 Safe carriage of11/13 mtr STPfrom store center Etah/nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading & unloading at both ends. 3 Safe carriage of9 mtr STPfrom store center Etah/nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading & unloading at both ends. 4 Safe carriage of line material from store center Etah/nearest substation to pit site in distance range 0 to 60 Km. including loading & unloading at both ends. 5 Opening of binding & removal of following conductor with 33 KV/HT/LT line from broken PCC poles/rails/ STP and stacking at safer place. 6 1- Dog/ Raccoon/ Rabbit conductor 7 2- AAAC/ACSR weasel conductor/ GI wire. 8 3- ABC 3X95+1X35+1X16/3x50mm 9 4- ABC 3x120+1x70+1x16 10 Erection of 8.5 mtr. long PCC poles as single support including fixing of all HT/LT accessories etc. complete.Pole should be grouted properly as per DVVNL/RESPO normes 11 Erection of 9 mtr. STP as single support including fixing of all HT/LT accessories etc. complete.Pole should be grouted properly as per DVVNL/RESPO normes 12 Errection of 11/13 mtr.STP as single support including fixing of all HT/LT accessories etc. complete.Pole should be grouted properly as per DVVNL/RESPO normes 13 Errection of 8.5 mtr. long PCC poles as Double Pole/ section pole including drilling,cutting etc. andfixing of all accessories etc. complete. 14 Errection of 11mtr. STP as Double Pole/ section pole including drilling,cutting etc. andfixing of all accessories etc. complete. 15 Laying stringing & sagging of 3 phase 3 wire 33/HT/LT line with following condudctor including binding & nozzling. 16 1- Dog/ Raccoon/ Rabbit conductor 17 2- AAAC/ACSR weasel conductor/ GI wire. 18 3-ABC 3*95 mm/3*50 mm 19 4- ABC 3x120+1x70+1x16 20 Straightening of tilted PCC poles/ST P/Railsingle support of HT/LT line after opening of nuzzling, digging of pit applying anti direction force for making of proper alignment of line. 21 Straightening of tilted D/P after opening of connection applying anti direction force, digging of dug for proper alignment of line including reconnection etc. complete. 22 Opening of HT/LT connections & lowering of followingT/F from D/P/Plinth and shifting up to in safer place. 23 1- 25/63 KVA T/F 24 2- 100 KVA T/F 25 Dismanteling of old/damage STP/RS Joistof HT/LT line andcarriage to store centre Etah 26 Re-sagging of loose 33/HT/LT conductor after opening, binding, nozzling etc. 27 1- Dog/ Raccoon/ Rabbit conductor 28 2- AAAC/ACSR weasel conductor/ GI wire. 29 3- ABC 3X120+1X70+1X16 30 4-ABC 3X95+1X35+1X16 31 5-ABC 3X50+1X35+1X16 32 Replacement of following broken/damaged/missing accessories by new accessories including opening of the same and refixing. 33 1-11 KV cross arms V type 34 2-11 KV pin insulator 35 3-11 KV pin with nut 36 4-11 KV Disc insulator 37 5-Cross Arms holding clamps 38 6-F Clamps 39 7-LT shackle insulator 40 8-33 KV cross arm. 41 9-33 KV pin with nut 42 10- 33 KV pin insulator 43 Retightening of Stay rod. Etc. complete. 44 Providingfixing of stay rod with nuzzling etc. complete. 45 Consumeable like nut & bolts of off size, cleaning chemical/material, cleaning clothes, insulating tape etc. will be required to complete the work shall be at contractor cost. 46 Earthing of PCC/RS Joist/STP as per RESPO norms. 47 Carriage of old material from pit site to JE store/store center, Etah in distance range 0 to 10 km including loading & unloading and proper stacking. 48 Mounting of Following Transformers on double pole/Plinth including making of the connection etc complete. 49 1- 25/63 KVA T/F 50 2- 100 KVA T/F 51 Chopping of tree branches 52 Repairing/ Resagging / new guarding of HT lines with GI wire as per RESPO norms . Last date of submission for this tender is 2025-08-29. This is a Overhead Line tender in Etah, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

3 issued
  • Tender Document 1html
  • Tender Document 2xlsx
  • Tender Document 3pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in