🎉 Your free trial plan has started. Plan will expire in 0 days

Dakshinanchal Vidyut Vitran Nigam Limited

orai, uttar pradesh

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Dakshinanchal Vidyut Vitran Nigam Limited has published Tender For Electric Work , Replacement Of Damage Pole , Work- 1 ( Part-A ) Carriage Offollowing Line Materials From Orai To Site Including Weiging, Measuringloading & Unloading At Both End And Proper Stacking At Safe Place. 2 Carriage Of St Pole 11 / 9 Mtr Long From Orai Store To Site 3 Carriage Of Pcc Pole 9.0 / 8.5 Mtr Long From Orai Store To Site 4 Carriage Of Dog / Rabbit / Weasel Conductorfrom Orai Store To Site 5 Carriageof Ab Cable 3X120 / 3X95 Sqmm From Orai Store To Site 6 Carriageof Ab Cable 3X50 / 1X16 Sqmm From Orai Store To Site 7 Carriage Of Other Line Material Top, T-Off, X-Arm, Clamps S / S Base Earthing Rod, Stay Set Complete, Pin Insulator Etc. 8 ( Part-B ) Erection Of The Following Supports After Making Of Pits As Per Resspo Norms & Filling Of Pits By Concrete Of Ratio 1:4:8 ( Cement Brick Balast & Sand ) . Fitting Of All Accessories As Cross Arm, Top Channel Etc. Plinthing Of Support 300Mm Above Ground Level By Concrete Of Ratio 1:4:8 ( Cement Brick Balast & Sand ) Will Be Done At The Time Of Erection Of Pole. Painting Of St Pole Structure As Per Resspo Norms Also ( All Type Of Nut, Bolts & Grouting Material Etc. Will Be Provided By Contractor ) . 9 Erection Of Double Pole Structure On St Pole 11 / 9 Mtr Long Complete With Bracing 10 Erection Of Single Support Of St Pole 11 / 9 Mtr Long With All Fitting 11 Erection Of Double Pole Structure On 9 / 8.5 Mtr Pcc Pole With All Fitting 12 Erection Of Single Pole Structure On 9 / 8.5 Mtr Pcc Pole With All Fitting 13 Replacement Of Rotten Dog / Weasel Conductor After Removing Rotten Conductor And Resagging Of Line 14 Straighting Of Tilted St / Pcc Pole After Digging Of Pits And Regrouting Of Poles. 15 Erection Of New Stay With Its Grouting For Straighting Ofst / Pcc Poles 16 Tighting Of Ht / Lt Line After Opening Of Old Binding And Rebinding After Tightening 17 Tighting Of Ab Cable Of Size 3X120 / 3X95 Sqmm After Opening Old Binding And Tighting Of Cable And Rebinding 18 Replacement Of Distribution Box 19 Repairing Of Rotten St Poles After Breaking Of Old Plingthing & Grouting , Welding Of 3 Angle Of Size 50X50x5mm At 120 Degree Angle And Re Grouting & Plingthing Of Poles 20 Trimming Of Trees Near Ht / Lt Lines. Last date of submission for this tender is 2022-11-01. This is a Bolts tender in Orai, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

3 issued
  • Tender Document 1html
  • Tender Document 2pdf
  • Tender Document 3pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in