🎉 Your free trial plan has started. Plan will expire in 0 days

Dakshinanchal Vidyut Vitran Nigam Limited

etawah, uttar pradesh

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Dakshinanchal Vidyut Vitran Nigam Limited has published tender for Work to be done under full deposit scheme head against various approved packages under Electricity Distribution Section II, Etawah., 1 Carriage of PCC pole from Store Center Kunera Etawah to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. 2 ST/PCC pole 3 Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel, Different type of Clamps and other required material 4 AB Cable 1x16+1x25 5 ACSR Dog Conductor 6 ACSR Weasel Conductor 7 Cable Alluminium PVC 2x16 Sqmm 8 Cable Alluminium PVC 3.5x70 Sqmm 9 33 Kv XLPE Cable 3x120 Sqmm 10 25 KVA Distribution Transformer 11 63 KVA Distribution Transformer 12 Erection ofsinglesupportbyST/PCC pole includingfixingcompleteHT/LT fittingsasperRESSPOMunualincludingthecostoflabour, T&P and carrier etc. required for proper completion of work. 13 Groutingofsinglesupport ST/PCC pole asperRESSPOManual including of the cost of labour,T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. 14 Erection & grouting ofdouble pole including fixing completeHT/LTfittingasperRESSPOManualincludingthe cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. 15 Laying, sagging, stringing, binding & jumpering of ACSR Dog Conductor on the newly erected pole asperRESPOmanualandasperdirectionofsupervising engineer,includingthecostofarrangementoflabour,T&P carrier etc. required for proper completion of work. 16 Laying, sagging, stringing, binding & jumpering of ACSR Weasel Conductor on the newly erected pole asperRESPOmanualandasperdirectionofsupervising engineer,includingthecostofarrangementoflabour,T&P carrier etc. required for proper completion of work. 17 Layingspreading,liftingandfinalsaggingofArialBunched Cable(allsize). includingfixingof allaccessoriesasper RESSPO Manual and as per direction ofsupervising engineer, includingthecostofarrangementoflabour,T&Pcarrieretc. required for proper completion of work. : 18 Erection and grouting of staycomplete including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of allgrouting material, labour, T&P etc. required for proper completion of work as per RESSPO Manual. 19 Fixing &connectingofearthingrods as perRESSPOManual includingthecostoflabour,T&Petc.requiredforproper completion of work. 20 Mounting of 25 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof. 21 Mounting of 63 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof. 22 Digging, laying and back filling of 3X120 Sqmm XLPE cable including the cost of Cable hoisting and making loops/ HDPE pipe/clamps as per RESPO manual and as per direction of supervising engineer including the cost of arrangementof brick, sand, labour and T&P etc. required for proper completion of the work. 23 Filling Of 11 Kv Heat Shrinkable Cable Jointing Kit (Outdoor Type) Suitable for XLPE 3x120 Sqmm with Supply. (including the cost arrangement of labour, T&P, carrier etc. required for proper completion of work) 24 Guardingof HT/LT 11 Kv Line with GI wire as per RESPO Norms. includingthe costofarrangementoflabour, T&P etc required for proper completion of work. 25 Installation & Fixing of following accessories. includingthecostoflabour, T&P and carrier etc. required for proper completion of work. 26 Disc Fitting 27 Disc Insulator 28 Stay Clamp 29 T/F Base Angle 30 DP Clamp 31 Pin Insulator 32 T-Off Channel 33 Dropper Channel 34 Top Channel 35 Nut Bolt 36 11 Kv Cross Arm 37 F Clamp 38 Holding Clamp 39 Fuse Set 40 Guarding Angle 41 LT Distribution Box 42 Suspension Clamp . Last date of submission for this tender is 2024-10-09. This is a Bolts tender in Etawah, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

3 issued
  • Tender Document 1html
  • Tender Document 2xlsx
  • Tender Document 3pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in