🎉 Your free trial plan has started. Plan will expire in 0 days

Dakshinanchal Vidyut Vitran Nigam Limited

mathura, uttar pradesh

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Dakshinanchal Vidyut Vitran Nigam Limited has published tender for Deposit Work In The Area Of Edsd Laxminagar Under Edd-Iii, Mathura, 1 Carriage of 8.5 Mtr Long PCC Pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 2 Carriage of 9/11 Mtr Long ST Pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 3 Carriage of 16 KVA Transformer from Store Centre, Mathura to pit site with loading & unloading at both ends 4 Carriage of 25 KVA Transformer from Store Centre, Mathura to pit site with loading & unloading at both ends 5 Carriage of 100 KVA Transformer from Store Centre, Mathura to pit site with loading & unloading at both ends 6 Carriage of 250 KVA Transformer from Store Centre, Mathura to pit site with loading & unloading at both ends 7 Carriage of 11 KV XLPE Cable size 3x70/3x120 sq.mm. Cable form Store Center Mathura/Agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cableincluding loading & unloading at both ends. 8 Carriage of 11 KV XLPE Cable size 3x185/3x300 sq.mm. Cable form Store Center Mathura/Agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cableincluding loading & unloading at both ends. 9 Carriage of Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends. 10 Erection of single pole structure 8.5 Mtrs on PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms. 11 Erection of single pole structure 9/11 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms. 12 Erection of Double pole structure 8.5 Mtrs on PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms. 13 Erection of Double pole structure 9/11 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms. 14 Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works. 15 Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work. 16 Laying, sagging stringing and binding of ACSR Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual. 17 Laying, sagging stringing and binding of ACSR Dog Conductor on the erected PCC pole/STP including jumpering as per RESPO manual. 18 Laying, sagging stringing and binding of Arial Bunch Conductor on the erected PCC pole/STP including jumpering as per RESPO manual. 19 Laying, sagging stringing and binding of LT PVC Cable on the erected PCC pole/STP including jumpering as per RESPO manual. 20 Laying of 11 KV XLPE Cable size 3x70/3x120 sq.mm. in the trench/G.I pipe/HDPE pipe and re-dressing of trench after laying of XLPE Cablefor proper completion of work as per direction of supervising engineer. 21 Laying of 11 KV XLPE Cable size 3x185/3x300 sq.mm. in the trench/G.I pipe/HDPE pipe and re-dressing of trench after laying of XLPE Cablefor proper completion of work as per direction of supervising engineer. 22 Filing of cable box as suitable size as per direction of supervising engineer. 23 filing of Straight through as suitable size as per direction of supervising engineer. 24 Chopping of Tree branches to Clear the route properly. 25 Mounting of 16 KVA Transformer on the Double pole/Plinth structures and connections thereof. 26 Mounting of 25 KVA Transformer on the Double pole/Plinth structures and connections thereof. 27 Mounting of 63KVA Transformer on the Double pole/Plinth structures and connections thereof. 28 Mounting of 100 KVA Transformer on the Double pole/Plinth structures and connections thereof. 29 Mounting of 250 KVA Transformer on the Double pole/Plinth structures and connections thereof. 30 Cutting of CC Road for making depth foundation for erection of pole. 31 Installation of 11 KV CT/PT Combined metering unit on existing double pole structure of large & heavy, power consumers to avoid possibility of theft of energy & 11 KV feeders at 33/11 KV sub- station including the cost of accessories (Nut & Bolt, PVC Tape etc.) required for proper completion of work also provided by the contractor. (including carriage of New 11 KV CT/PT combined metering unit from Store Center Mathura to Site of work.) 32 Fixing of meter pilfer box (service connection meter holding capacity) including its carriage from Electricity Store Centre Mathura to site of work including grouting of meter pillar box in ratio 1:4:8 cement, sand and brick ballast as per standard norms. 33 Grouting of PCC/ST pole in ratio 1:4:8 cement, sand and brick ballast as per standard norms, including cost of all grouting material. 34 Guarding of 11 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. It includes the cost o f labour T&P carriage etc required for proper completion. 35 Fixing of Distribution Box on erected PCC Pole. 36 Re-sagging of loose H.T/L.T line as per direction of supervising engineer. It includes the cost of labour, T&P etc required for proper completion of work.(work will be done inside and outside of village) 37 Dismantle of old/damaged ACSR weasel conductor/G.I. Wire from the existing line and its bundling and stacking in roll and send to J.E. Store/ Mathura Store. 38 Straightening of tilted Single pole at various places by straighteningof pole including the cost of labour ,T&P charges required for proper completion of work (inside/outside village) . Last date of submission for this tender is 2024-07-16. This is a Electrification Work tender in Mathura, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

3 issued
  • Tender Document 1html
  • Tender Document 2xlsx
  • Tender Document 3pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in