Dakshinanchal Vidyut Vitran Nigam Limited
- AOC value
- Refer Docs
- AOC date
- Refer Docs
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- -AOC date
- -Published
- -Closes
- -Bid opens
- -AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- Refer Docs
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Dakshinanchal Vidyut Vitran Nigam Limited has published Work Of Repairing And Maintenance Of 11 Kv Lines Of 33 / 11Kv Sub Station -Raya Under Edd-Iii, Mathura.- 1 Safe Carriage Of 9 / 11 Mtr. Long Stp Pole From Store Center Mathura / Nearest 33 / 11 Kv S / S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading & Unloading At Both Ends. 2 Safe Carriage Of 8.5 / 9 Mtr. Long Pcc Pole From Store Center Mathura / Nearest 33 / 11 Kv S / S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading & Unloading At Both Ends. 3 Safe Carriage Of Line Material From Store Center Mathura To Pit Site In Distance Range 0 To 60 Km. Including Loading & Unloading At Both Ends. 4 Errection Of 9 / 11Mtr. Long Stp Poles As Single Support Including Fixing Of All 11 Kv Accessories Etc, Grouting And Plinth As Per Respo Norms. 5 Errection Of 8.5 / 9Mtr. Long Pcc Poles As Single Support Including Fixing Of All 11 Kv Accessories Etc And Other Work Complete As Per Respo Norms. 6 Errection Of 9 / 11 Mtr. Long Stp Poles As D.Pole / Section Poleincluding Fixing Of All 11 Kv Accessories Etc, Grouting And Plinth As Per Respo Norms. 7 Errection Of 8.5 / 9 Mtr. Long Pcc Poles As D.Pole / Section Poleincluding Fixing Of All 11 Kv Accessories Etc And Other Work Complete As Per Respo Norms. 8 Dismantling And Removal Of Existing Acsr Weasel / Dog / Raccon / Rabbit Conductor From The Various Area, Stacking And Placement Their Coils And Their In The Respective J.E.’S ( Store ) As Per Direction Of Supervising Engineer. It Includes The Work Of Cartage The Cost Of Labour T & P Carrier Etc. Required For Proper Completion Of Work. 9 Laying Sagging Stringing, Binding, Jumpering & Fixing Of All Accessories Etc Of Following Conductor On The Newly / Old Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Required For Proper Completion Of Work. ( I ) Acsr Dog / Raccon 10 Laying Sagging Stringing, Binding, Jumpering & Fixing Of All Accessories Etc Of Following Conductor On The Newly / Old Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Required For Proper Completion Of Work. ( I ) Acsr Weasel 11 Straighting Of Tilted Pcc / R.S.Joist Poles Of 11 Kv Line After Opening Of Nozzling, Digging Of Pit Applying Anti Direction Force For Making Of Proper Alignment Of Line. 12 Strainthing Of Tilted D / P After Opening Of Connection Applying Anti Direction Force, Digging Of Dug For Proper Alignment Of Line. 13 Opening Of 11 Kv / Lt Connections & Lowering Of 25 / 63 Kva T / F From D / P And Shifting Up To In Safer Place. 14 Re-Sagging Of Following Loose Conductor As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P Carrier Etc Required For Proper Completion Of Work. ( A ) Of Lt Line 15 ( B ) Of 11 Kv Line 16 Earthling Of Pole With Ms Earth Rod As Per Respo Specification. 17 Retightening Of Stay Rod. Etc. Complete. 18 Fixing Of Stay Rod With Nuzzling Etc. Complete. 19 Replacement Of Following Broken / Damaged / Missing Accessories By New Accessories Including Opening Of The Same And Refixing. ( I ) 11 Kv Cross Arms ‘V’ Type 20 ( Ii ) 11 Kv Pin Insulator 21 ( Iii ) 11 Kv Pin With Nut 22 ( Iv ) 11 Kv Disc Insulator 23 ( V ) Cross Arms Holding Clamps 24 Carriage Of Old Material From Pit Site To Je Store / Store Center Mathura In Distance Range 0 To 60 Km. Including Loading & Unloading And Proper Stacking. 25 Mounting Of 25 / 63 Kv Transformers On Double Pole Including Making Of The Connection Etc Complete. 26 Repairing / Resagging / New Guardingof Ht Line With Gi Wire As Per Respo Norms. 27 Chopping Of Tree Branches 28 Dismantling Of Pcc Pole By Opeinging Of All Accessories. Last date of submission for this tender is 2022-09-19. This is a Nuts Supply tender in Mathura, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
3 issued- Tender Document 1htmlHTML document
- Tender Document 2xlsxXLSX document
- Tender Document 3pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free