Dakshinanchal Vidyut Vitran Nigam Limited
- AOC value
- Refer Docs
- AOC date
- Refer Docs
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- -AOC date
- -Published
- -Closes
- -Bid opens
- -AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- Refer Docs
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Dakshinanchal Vidyut Vitran Nigam Limited has published Work Of Maintenance Of Ht / Lt Lines In The Area Of Edsd Iiird Jalesar Under Edd Iind Etah.= 1 Safe Carriage Of 8.5 Mtr. Long Pcc Pole From Store Center Etah / Nearest 33 / 11 Kv S / S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading & Unloading At Both Ends. 2 Safe Carriage Of11 / 13 Mtr Stpfrom Store Center Etah / Nearest 33 / 11 Kv S / S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading & Unloading At Both Ends. 3 Safe Carriage Of9 Mtr Stpfrom Store Center Etah / Nearest 33 / 11 Kv S / S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading & Unloading At Both Ends. 4 Safe Carriage Of Line Material From Store Center Etah / Nearest Substation To Pit Site In Distance Range 0 To 60 Km. Including Loading & Unloading At Both Ends. 5 Opening Of Binding & Removal Of Following Conductor With 33 Kv / Ht / Lt Line From Broken Pcc Poles / Rails / Stp And Stacking At Safer Place. 6 1- Dog / Raccoon / Rabbit Conductor 7 2- Aaac / Acsr Weasel Conductor / Gi Wire. 8 3- Abc 3X95+1X35+1X16 9 4- Abc 3X120+1X70+1X16 10 Errection Of 8.5 Mtr. Long Pcc Poles As Single Support Including Fixing Of All Ht / Lt Accessories Etc. Complete.Pole Should Be Grouted Properly As Per Dvvnl / Respo Normes 11 Errection Of 9 Mtr. Stp As Single Support Including Fixing Of All Ht / Lt Accessories Etc. Complete.Pole Should Be Grouted Properly As Per Dvvnl / Respo Normes 12 Errection Of 11 / 13 Mtr.Stp As Single Support Including Fixing Of All Ht / Lt Accessories Etc. Complete.Pole Should Be Grouted Properly As Per Dvvnl / Respo Normes 13 Errection Of 8.5 Mtr. Long Pcc Poles As Double Pole / Section Pole Including Drilling, Cutting Etc. Andfixing Of All Accessories Etc. Complete. 14 Errection Of 11Mtr. Stp As Double Pole / Section Pole Including Drilling, Cutting Etc. Andfixing Of All Accessories Etc. Complete. 15 Laying Stringing & Sagging Of 3 Phase 3 Wire 33 / Ht / Lt Line With Acsr / Weasel / Reccoon / Dog Conductor Including Binding And Nuzzling Etc. Complete. 16 1- Dog / Raccoon / Rabbit Conductor 17 2- Aaac / Acsr Weasel Conductor / Gi Wire. 18 3-Abc 3*95 Mm / 3*50 Mm 19 4- Abc 3X120+1X70+1X16 20 Straighting Of Tilted Pcc Poles / St P / Railsingle Support Of Ht / Lt Line After Opening Of Nuzzling, Digging Of Pit Applying Anti Direction Force For Making Of Proper Alignment Of Line. 21 Straighting Of Tilted D / P After Opening Of Connection Applying Anti Direction Force, Digging Of Dug For Proper Alignment Of Line Including Reconnection Etc. Complete. 22 Opening Of Ht / Lt Connections & Lowering Of Followingt / F From D / P / Plinth And Shifting Up To In Safer Place. 23 1- 25 / 63 Kva T / F 24 2- 100 Kva T / F 25 Dismanteling Of Old / Damage Stp / Rs Joistof Ht / Lt Line Andcarriage To Store Centre Etah 26 Re-Sagging Of Loose 33 / Ht / Lt Conductor After Opening, Binding, Nozzling Etc. 27 1- Dog / Raccoon / Rabbit Conductor 28 2- Aaac / Acsr Weasel Conductor / Gi Wire. 29 3- Abc 3X120+1X70+1X16 30 4-Abc 3X95+1X35+1X16 31 5-Abc 3X50+1X35+1X16 32 Replacement Of Following Broken / Damaged / Missing Accessories By New Accessories Including Opening Of The Same And Refixing. 33 1-11 Kv Cross Arms V Type 34 2-11 Kv Pin Insulator 35 3-11 Kv Pin With Nut 36 4-11 Kv Disc Insulator 37 5-Cross Arms Holding Clamps 38 6-F Clamps 39 7-Lt Shackle Insulator 40 8-33 Kv Cross Arm. 41 9-33 Kv Pin With Nut 42 10-33 Kv Pin Insulator 43 Retightening Of Stay Rod. Etc. Complete. 44 Providingfixing Of Stay Rod With Nuzzling Etc. Complete. 45 Earthing Of Pcc / Rs Joist / Stp As Per Respo Norms. 46 Carriage Of Old Material From Pit Site To Je Store / Store Center, Etah In Distance Range 0 To 10 Km Including Loading & Unloading And Proper Stacking. 47 Mounting Of Following Transformers On Double Pole / Plinth Including Making Of The Connection Etc Complete. 48 1- 25 / 63 Kva T / F 49 2- 100 Kva T / F 50 Chopping Of Tree Branches 51 Disconnecting Of Lt Service Line Of Following Category Of Consumers Before Dismantling Of Old Lt Line And The Reconnections Through Distribution Boxes / Kiosk, Supply & Fixing Of Clamp / Connectors Etc. For Consumer Service Cables After Commissioning Ofline. 52 Single Phase Consumer 53 Three Phase Consumer 54 Repairing / Resagging / New Guarding Of Ht Lines With Gi Wire As Per Respo Norms. Last date of submission for this tender is 2022-10-03. This is a Overhead Line tender in Etah, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
3 issued- Tender Document 1htmlHTML document
- Tender Document 2xlsxXLSX document
- Tender Document 3pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free