Dakshinanchal Vidyut Vitran Nigam Limited
- AOC value
- ₹4.19L
- AOC date
- 30 Jun
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 30 Jun 24AOC date
- -Published
- -Closes
- -Bid opens
- 30 Jun 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 30/06/2024
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Dakshinanchal Vidyut Vitran Nigam Limited has published Tender For The Electrification Work Of 11 No. Stw At Various Places / Villages Under Edd, Banda ( Rural ) , 1 The Following Works Under Various Places / Sub-Stations Under Full Deposit Scheme 2023-24 Under Edd, Banda ( Rural ) , Including Carriage Of All Required Material From Esc Banda To Work Site, Alongwith Its Loading, Unloading & Dragging At The Respective Ends And Also Safe Carriage Of Old Line Material / Scraped From Site To Store Centre, If Any. The Bidder Shall Be Responsible For Complete Execution Of The Work Under The Scope Of Tender Specification. Any Work / Activity Not Specifically Indicated But Is Required For Systematic Execution Of Job Shall Be Carried Out By The Contractor Without Any Extra Payment. Details Of The Work As Given Below ;- 2 Erection Of 11 Kv Lines And 63 Kva Sub-Staions Work -For Electrification Of Stw At Various Places As 51-Naraini Vill. Ajitpura, 05-Jaspura Vill. Raipura ( Gadariya ) , 21-Jaspura Vill. Rampur, 27-Jaspura Vill. Sikahula ( Sikuwa ) , 28-Jaspura Vill. Gadariya, 29-Jaspura Vill. Raipura ( Gadariya ) , 41-Jaspura Vill. Rampur, 17-Jaspura Vill. Sonamau, 54-Jaspura Vill. Dandamau, 59-Jaspura Vill. Pachakauri, 29-Banda Vill. Gokharahi Etc. 3 Safely Cartage Of Following Poles From Esc To Site Of Work - 4 Pcc Poles 8.5 Mtr. Long 5 Safely Cartage Of Line Material Viz. Conductor, Cable, Wire, X-Arm, Clamps, Channels, Angles, Earthing Rod, Stay Etc. 6 Erection Of Pcc Poles 8.5 Mtr. Long As Sp With Complete Ht / Lt Fittings Of All Accessories As Per Direction Of Engineer Incharge / Resspo Norms. 7 Erection Of Pcc Poles 8.5 Mtr. Long As Dp / Sdp With Complete Ht / Lt Fittings Of All Accessories As Per Direction Of Engineer Incharge / Resspo Norms. 8 Concreting / Grouting Of Newly Erected Single / Double Pole Structure On 8.5 Mtr. Pcc Poles Asper Direction Of Supervising Engineer / Resspo Manual. The Support Shall Be Grouted With Cement, Sand And Brick Ballast / Stone Ballast In Ratio 1:4:8 ( 0.285 Cu. Mtr. Each ) , Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast / Stone Ballast, Stone Pad Etc. As Per Actual Sire Requirement, Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 9 Laying, Sagging, Stringing, Binding And Jumpering Ofacsr Weasel Conductor On The Newly Erected Poles With Fitting Of All Related Accessories As Per Direction Of Supervising Engineer / Resspo Manual. 10 Laying, Sagging, Stringing, Binding And Jumpering Ofabc Cable On The Newly Erected Poles With Fitting Of All Related Accessories As Per Direction Of Supervising Engineer / Resspo Manual. 11 Erection Of Stay Set Complete As Per Resspo Norms Alongwith Nozeling & Binding Of Stay Set, Stay. 12 Fabrication Of 11 Kv V-Type X-Arm ( 16 Mm Hole, 02 No. Each V-Type X-Arm ) As Per Resspo Drawings With Loading, Unloading & Cartage All Complete Work. 13 Fabrication Of 11 Kv Sub-Station Base Angle ( 16 Mm Hole, 04 No. Each S / S Base Angle ) As Per Resspo Drawings With Loading, Unloading & Cartage All Complete Work. 14 Fabrication Of 11 Kv Top Channel ( 16 Mm Hole, 10 No. Each Top Channel ) As Per Resspo Drawings With Loading, Unloading & Cartage All Complete Work. 15 Fabrication Of 11 Kv Dropper Channel ( 16 Mm Hole, 07 No. Each Dropper Channel ) As Per Resspo Drawings With Loading, Unloading & Cartage All Complete Work. 16 Fabrication Of 11 Kv T-Off Channel ( 16 Mm Hole, 08 No. Each T-Off Channel ) As Per Resspo Drawings With Loading, Unloading & Cartage All Complete Work. 17 Grouting Of Stay Set Complete At Digging Of Pit Including The Cost Of Grouting With Cement, Sand And Brick Ballast / Stone In Ratio 1:4:8 As Per Resspo Norms. 18 Fixing Of Earthing Rod As Per Direction Of Supervising Engineer / Resspo Manual, Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. 19 Safely Cartage Of 63 Kva Capacity Transformers From Esc / Ask Store To Site Of Work With Loading And Unloading On Both Sites As Per Direction Of Engineer Incharge / Resspo Manual. 20 Safely Installation Of 63 Kva Capacity Transformers On Double Pole Structure In Proper Alignment As Per Direction Of Engineer Incharge / Resspo Manual. 21 Safely Cartage Of Old 63 Kva Capacity Transformers From Site Of Work To Esc / Ask Store, Banda Alongwith Loading And Unloading On Both Sites As Per Direction Of Engineer Incharge. 22 Chopping Of Tree Branches In Visinity Of 11 Kv / Lt Lines At Various Places.. Last date of submission for this tender is 2024-06-20. This is a Electrification Work tender in banda, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
5 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3xlsxXLSX document
- Tender Document 4pdfPDF document
- Tender Document 5pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free