Archaeological Survey Of India
- AOC value
- ₹32.08L
- AOC date
- 3 Jan
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 3 Jan 24AOC date
- -Published
- -Closes
- -Bid opens
- 3 Jan 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 03/01/2024
- Authority
- Archaeological Survey Of India
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Archaeological Survey Of India has published Structural Repairs To Dauji Temple At Hathras As Per Tender Document; 1 Demolishing Brick Work In Cement Mortar Manually Including Stacking Of Serviceable Material And Disposal Of Unserviceable Material Within 50 Metres Lead As Per Direction Of Engineer-In-Charge. ( Rate Including Gst ) . 2 Demolishing Lime Concrete Manually / By Mechanical Means And Disposal Of Material Within 50 Metres Lead As Per Direction Of Engineer-In-Charge. ( Rate Including Gst ) . 3 Dismantling Old Plaster Or Skirting Raking Out Joints And Cleaning The Surface For Plaster Including Disposal Of Rubbish To The Dumping Ground Within 50 Metres Lead.As Per Direction Of Engineer - In- Charge. ( Rate Including Gst ) . 4 Taking Out / Dismantling Stone Slab Roofing Over Wooden Karries Or R.C.C. Battensdismantling Karries And Battens To Be Paid For Separately ) , Including Stacking Of Erviceable Material And Disposal Of Unserviceable Material Within 50 Meters Lead. ( Rate Including Gst ) . 5 Taking Out Wooden Struts And, Wooden Karries Including Stacking Within 50 Metres Lead. As Per Direction Of Engineer - In- Charge. ( Rate Including Gst ) . 6 Dismantling Marble Flooring In Cement Mortar Including Stacking Of Serviceable Material And Disposal Of Unserviceable Material Within 50 Metres Lead. As Per Direction Of Engineer - In- Charge. ( Rate Including Gst ) . 7 Removing Of Old Damaged M.S. Iron Teen Shade Etc. Including Disposal Of Unserviceable Material Within 50 Metres Lead As Directed By Engineer-In-Charge. ( Rate Including Gst ) . 8 Removing / Scrapping Oil Paint By Manualy Labour From Walls Of Temple Campus Etc. Complete. ( Rate Including Gst ) . 9 Provision For Removal Of Grass, Vegitation & Racking Out Of Joints For Graouting And Water Titting Work At Top Of Parapet Wall And Roof For Sefty Of Rainy Water Etc. ( Rate Including Gst ) . 10 Taking Out Old And Damaged M.S. Iron Channel Gate Of Size 2.00M X 2.40 M And Refixing After Minor Repairing With Welding Etc. Complete. ( Rate Including Gst ) . 11 Earth Work In Excavation By Mechanical Means ( Hydraulic Excavator ) / Manual Means Over Areas ( Exceeding 30 Cm In Depth, 1.5 M In Width As Well As 10 Sqm On Plan ) Including Getting Out And Disposal Of Excavated Earth Lead Upto 50 M And Lift Upto 1.5 M, As Directed By Engineer-In-Charge. ( Rate Including Gst ) . 12 Providing & Laying In Position Lime Concrete With Brick Aggregate 25 Mm Nominal Size & 50% Composite Lime Mortar 1:1:1 ( 1 U.Lime : 1 Shurkhi : 1 C. Sand ) Including Supply Of All Materials Labours T&P Etc. Required For Proper Completion Of Work. ( Rate Including Gst ) . 13 Filling Available Excavated Earth ( Excluding Rock ) In Trenches, Plinth, Sides Of Foundations Etc. In Layers Not Exceeding 20Cm In Depth, Consolidating Each Deposited Layer By Ramming And Watering, Lead Up To 50 M And Lift Upto 1.5 M. ( Rate Including Gst ) . 14 Providing And Fixing 40 Mm Av. Thick Red Sand Stone Slab For Roofing Over Wooden Arries Or R.C.C. Battens Or Structural Steel Sections ( Karries Or Battens Or Structural Steel Sections To Be Paid Separately ) , Including Pointing The Ceiling Joints With Lime Mortar 1:1:1 Ratio ( 1 Lime: 1 C.Sand : 1 Surkhi Of Ist Class Of Bricks ) Complete : ( Rate Including Gst ) . 15 Providing Laying 25-30Mm Lime Plaster On The Wall / Roof With Lime Mortar 1:1:1 ( 1 Lime, 1 Surkhi, 1 C Sand ) Mixed With Binding Material Including Supply Of All Materials Labour T&P. E.T.C Required For Proper Completion Of Work. ( Rate Including Gst ) . 16 50 Mm Thick Fine Dressed Buff Stone Flooring Over 20 Mm ( Average ) Thick Base Of Lime Mortar 1:1:1 ( 1 Cement : 1 Coarse Sand ) , Including Pointing With Lime Mortar With An Admixture Of Pigment To Match The Shade Of Stone. ( Rate Including Gst ) . 17 Errecting Tubelor Departmental Scaffolding For Work At Outer Side, Ground Level To Top Of Parapite Wall At Temple Including Dismantling After Completion Of Work At Site. ( Rate Including Gst ) . 18 Providing And Laying In Position Cement Concrete 1:3:6 ( 1 Cement : 3 Coarse Sand : 6 Graded Stone Aggregate 20 Mm Nominal Size ) . Of Specified Grade Excluding The Cost Of Centering And Shuttering. As Per Direction Of Engineerin- Charge. ( Rate Including Gst ) . 19 Brick Work With Common Burnt Clay F.P.S. ( Non Modular ) Bricks Of Class Designation 7.5 In Foundation And Plinth In Cement Mortar 1:6 ( 1 Cement : 6 Coarse Sand ) As Per Direction Of Engineer-In-Charge. ( Rate Including Gst ) . 20 P / L D.P.C. 50Mm Thick With Cement Concrete 1:2:4 ( 1 Cement : 2 C. Sand : 4 Stone Aggregate 20Mm Nominal Size ) On Plinth Level. As Per Direction Of Engineer-Incharge. ( Rate Including Gst ) . 21 Brick Work With Common Burnt Clay F.P.S. ( Non Modular ) Bricks Of Class Designation 7.5 In Above Plinth Level Up To Approximate Height 1.00 Mtr. In All Shapes And Sizes In Cement Mortar 1:6 ( 1 Cement : 6 Coarse Sand ) As Per Direction Of Engineer-In-Charge. ( Rate Including Gst ) . 22 Providing M.S. Iron Gate Size 3.00X1.50 Made Of ( 50X50x6 ) Mm Angle Iron Frame With 12Mm. Square Bars Having 15 Cm. Spikes At Top Placed At 7.50 Cm. Center To Center Rough To Required Shape And Grill Size 3.00X0.75Mt. Made Of ( 50X50x6 ) Mm Angle Iron Frame With 12Mm. Square Bars Having 15 Cm. Spikes At Top Placed At 7.50 Cm. Center To Center , 2 Nos. 30 Cm. Long Holdfast With Nut Bolt Etc. Required For Proper Completion Of Work. ( Rate Including Gst ) . 23 Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Up To Plinth Level :1:2:4 ( 1 Cement : 2 Coarse Sand : 4 Graded Stone Aggregate 20Mm Nominal Size ) . ( Rate Including Gst ) . 24 15 Mm Cement Plaster On The Brick Wall Of Mix 1:4 ( 1 Cement: 4 Coarse Sand ) As Per Direction Of Engineer-Incharge. ( Rate Including Gst ) . 25 Painting With Synthetic Enamel Paint Of Approved Brand And Manufacture Required Colour To Give An Even Shade : Two Or More Coats On New Work Complete. As Per Direction Of Engineer-In-Charge. ( Rate Including Gst ) . 26 Finishing Walls With Acrylic Smooth Exterior Paint Of Required Shade : ( Two Or More Coat ) . ( Rate Including Gst ) . 27 Removal Of Collected Malwa And Debries From The Monument To Outside Of Municipality Limits ( As Directed By The Engineer - Incharge ) Using Manual Labour And Tractor Trolly ( Lead Up To 1.50 Km Av. And Lift Up To 1.5M Av. ) . ( Rate Including Gst ) . 28 Providing And Laying 2 To 3Mm Thick Lime Punning Over Plastered Surface In Lime Mortar 1:2 ( 1 U. Lime, 2 Marble Dust ) Including Cleaning And Rubbing Of Old Surface Before Lime Punning. ( Rate Including Gst ) . 29 Surface Dressing Of The Ground Level And Inequalities Not Exceeding 30 Cm Deep As Directed By Engineer-In-Charge. ( Rate Including Gst ) . 30 Providing And Fixing Plywood Board Panel With Wooden Frame, Size 0.90X1.20M. Including Hinges Channel, Locks, Mica Sheet, Screw, Gully Patch, And Necessary Required Materials Etc. Complete. With Labour Material. ( Rate Including Gst ) . 31 Providing And Laying Lime Concrete With Brick Aggregate 25 Mm Nominal Size ( Old Brick Available At Site For Prepare Brick Aggregate ) With 50% Composite Lime Mortar 1:1:1 ( 1 U.Lime : 1 Shurkhi : 1 C. Sand ) Including Supply Of All Materials Labours T&P Etc. Required For Proper Completion Of Work. ( Rate Including Gst ) .. Last date of submission for this tender is 2023-12-06. This is a Earth Moving Machinery tender in Hathras, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
3 issued- Tender Document 1htmlHTML document
- Tender Document 2xlsxXLSX document
- Tender Document 3pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free