🎉 Your free trial plan has started. Plan will expire in 0 days

Rural Development Department

west tripura, tripura

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Rural Development Department has published Procurement Of Steel Items (Grill, Rolling Shutter Etc And Fabrication Of Steel Work) In Different Areas Of Mmc And All 4 Blocks Under Rd Mohanpur Division, West Tripura. , Manufacturing &Supplying Of Complete M.S. Ornamental Grill With Square Bar Of Size 12 Mm. , Manufacturing & Supplying Of Complete M.S. Grill Gate With Square Bar Of Size 12 Mm & Ms Angle 35 Mm X 35 Mm X 5Mm / 40 Mmx 40 Mm X 5Mm Incl. Ms Sheet (3Mm Thick) And Other Related Accessories For Complete Item / Higher Specification As Per Reqd. Design. , Manufacturing, Supplying Including Fitting & Fixing Of The Finished Product In The Worksite Of Complete Ms Collapsible Steel Gate With Vertical Channels 20 Mm X 10 Mm X 2Mm Braced With Flat Iron Diagonals, 20Mm X 5Mm Size Top & Bottom Rails Of Iron 40 X 40 X 6Mm With 38 Mm Dia Steel Pulleys Complete With Bolt, Nut, Locking Arrangement, Stoppers, Handles Etc Incl. Applying A Priming Coat Of Red Lead Paint. , Manufacturing & Supplying Of Complete Steel Door (Obb / Awc) Pattern) Inc. Steel Shutter (Specification Is Enclosed). , Manufacturing &Supplying Of Complete Steel Window Made With M.S. Ornamental Grill With Square Bar Of Size 12 Mm Including Shutter Frame But Excluding Shutter. , Fabrication Including Fitting & Fixing Of The Finished Product In The Worksite Of Steel Tubular Truss Incl. Cost Of All Related Materials (Except Bip) - Span- (Upto 9 M). Rates Should Be Incl. Cost Of Base Plate , Cleat & Other. (Bip Will Be Issued From Department And Cost Of Holding Down Bolt / Nut Bolt Will Be Borne By The Department). , Fabrication Including Fitting & Fixing Of The Finished Product In The Worksite Of Steel Tubular Truss Incl. Cost Of All Relatedmaterials (Except Bip) - Span-(More Than 9 M). Rates Should Be Incl. Cost Of Base Plate, Cleat & Other. (Bip Will Be Issued From Department And Cost Of Holding Down Bolt / Nut Bolt Will Be Borne By The Department). , Manufacturing & Supplying Including Fitting & Fixing Ofthe Finished Product In The Worksite Of Fabricated Steel Tubular Truss Ofspacing 3.0M C/C With All Accessories Such As Required Purlin, Bottom Runner, Bracing, Trusses, Cleat, Base Plate & Other Fittings Of Trusses & Projection Of Rafter & Purlin To Gravel Wall Etc Completespan-(Up To 9 M) , Manufacturing & Supplying Including Fitting & Fixing Ofthe Finished Product In The Worksite Of Fabricated Steel Tubular Truss Ofspacing 3.0M C/C With All Accessories Such As Required Purlin, Bottom Runner, Bracing, Trusses, Cleat, Base Plate & Other Fittings Of Trusses & Projection Of Rafter & Purlin To Gravel Wall Etc Complete Span Above 9 Mtr , Manufacturing, Supplying Including Fitting & Fixing Of The Finished Product In The Worksite Of Complete M.S. Rolling Shutter Made Of 80 X 1.35 Mm Ms Laths Interlocked Together Through Their Entire Length & Joined Together At The End By End Locks Mounted On Specially Designed Pipe Shaft With Brackets Side Guides & Arrangement For Inside & Outside Locking Push & Pull Operation Complete But Incl. Fixing Of The Top Cover, Ball Bearing & Spring Etc. , Manufacturing & Supplying Of Ms Grill Incl. Arrow For Boundary Wall As Per Reqd. Design & Specification , Ms Hard Drawn Steel Wire Fabric (75X25mmmesh Weight Not Less Than 7.75 Kg/ Sqm). , Manufacturing And Supplying Of Ms Chain Link (Made Of Gi Wire, 100 Mm X 100 Mm , 8 G) , Fabrication Charge Including Fitting & Fixing Of The Finished Product In The Worksite Charge Of Any Structure.Rates Should Be Incl. Cost Of Base Plate, Cleat. (Pipe/Angle/ Holding Down Bolt Will Be Issued From Department). , Manufacturing & Supplying Including Fitting & Fixing Of The Finished Product In The Worksite Of Fabricated Steel Tubular Truss Of Spacing 3.09M C/C With All Accessories Such As Required Purlin, Bottom Runner, Bracing, Trusses, Cleat, Base Plate & Other Fittings Of Trusses & Projection Of Rafter & Purlin To Gravel Wall Etc Complete (Only Cost Of Holding Down Bolt / Nut Bolt Will Be Borneby The Department) Span-(Up To 9 M) , Manufacturing & Supplying Including Fitting & Fixing Of The Finished Product In The Worksite Of Fabricated Steel Tubular Truss Of Spacing 3.09M C/C With All Accessories Such As Required Purlin, Bottom Runner, Bracing, Trusses, Cleat, Base Plate & Other Fittings Of Trusses & Projection Of Rafter & Purlin To Gravel Wall Etc Complete (Only Cost Of Holding Down Bolt / Nut Bolt Will Be Borneby The Department) Span-(Above 9M) , Manufacturing, Supplying Including Fitting & Fixing Of The Finished Product In The Worksite Of Complete M.S. Rolling Shutter Made Of 80 X 1.35 Mm Ms Laths Interlocked Together Through Their Entire Length & Joined Together At The End By End Locks Mounted On Specially Designed Pipe Shaft With Brackets Side Guides & Arrangement For Inside & Outside Locking Push & Pull Operation Complete But Incl. Fixing Of The Top Cover, Ball Bearing & Spring Etc. , 100 X 100X 8 Mm - Ms Angle , 65 X 65 X 8 Mm - Ms Angle , 50 X 50X 5 Mm- Ms Angle , Manufacturing & Supplying Of Complete Steel Door As Per Jail Specification (Specification Is Enclosed). , Manufacturing & Supplying Of Completesteel Window As Per Jail Specification (Specification Is Enclosed) , Fabrication / Repairing Charge Of Old Grill & Other Steel Item. , Fabrication/Repairing Charge Of Old Rolling Shutter, Collapsible Gate Etc. , Manufacturing & Supplying Of Ms Grill Incl. Arrow For Boundary Wall As Per Reqd. Design &Specification , Manufacturing, Supplying Incl.Fabrication Of Minor Shed For Any Output Unit, Stand (Base) For Water Tank, Sign Board And Other Minor Structure (No Materials Will Be Issued From Department) , Ms Hard Drawn Steel Wire Fabric (75X25mm Mesh Weight Not Less Than 7.75 Kg/ Sqm). , Manufacturing & Supplying Of Complete M.S. Ornamental Grill With Square Bar Of Size 20Mm/ 25 Mm. , Manufacturing & Supplying Of Complete Steel Window Made With M.S. Ornamental Grill With Square Bar Of Size 20 / 25 Mm Including Shutter Frame But Excluding Shutter. , Manufacturing And Supplying Of Ms Chain Link (Made Of Gi Wire,100 Mm X 100 Mm , 8 G) , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply , Water Supply. Last date of submission for this tender is 2024-06-24. This is a Bolts tender in West Tripura, Tripura

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

3 issued
  • Tender Document 1html
  • Tender Document 2xlsx
  • Tender Document 3pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in