South Central Railway
- AOC value
- ₹43.03L
- AOC date
- 4 Jan
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 4 Jan 24AOC date
- -Published
- -Closes
- -Bid opens
- 4 Jan 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 04/01/2024
- Authority
- South Central Railway
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
South Central Railway has published Supply Of Supply, Installation, Commissioning, Training And Maintenance Of Track Based Way Side Lubricators (Electronic Type) With Dual Grease Applicator/Wiper Bar As Per Rdso Specification Irst-48 (June-2013) With Acs No-1, Dated :26.02.2020, Including Required Supply Of Grease/Lubricant And Maintenance Of The Machines With All Spares And Consumables Etc. During Initial Warranty Period Of 02 Years From Date Of Issue Of Commissioning Certificate. Firm Also To Provide Solar Panel And Battery As Per Para 7.2 Of Specification.Supply, Installation, Commissioning, Training And Maintenance Of Track Based Way Side Lubricators (Electronic Type) With Dual Grease Applicator/Wiper Bar As Per Rdso Specification Irst-48 (June-2013) With Acs No-1, Dated :26.02.2020, Including Required Supply Of Grease/Lubricant And Maintenance Of The Machines With All Spares And Consumables Etc. During Initial Warranty Period Of 02 Years From Date Of Issue Of Commissioning Certificate. Firm Also To Provide Solar Panel And Battery As Per Para 7.2 Of Specification.,Supply, Installation, Commissioning, Training And Maintenance Of Track Based Way Side Lubricators (Electronic Type) With Dual Grease Applicator/Wiper Bar As Per Rdso Specification Irst-48 (June-2013) With Acs No-1, Dated :26.02.2020, Including Required Supply Of Grease/Lubricant And Maintenance Of The Machines With All Spares And Consumables Etc. During Initial Warranty Period Of 02 Years From Date Of Issue Of Commissioning Certificate. Firm Also To Provide Solar Panel And Battery As Per Para 7.2 Of Specification. Note: (1) The Firm Has To Supply The Materials To Stores And Then Make Their Own Arrangements For Shifting Of Materials From Stores To Installation Locations (Different Locations In Guntur-Guntakal Section Of South Central Railway) (2) 1 Km Curve Length Category. [ Warranty Period: 24 Months After The Date Of Delivery ] , Supply Of Required Grease /Lubricant As Per Annexure Ii And Comprehensive Annual Maintenance Charge For Mac. Last date of submission for this tender is 2023-10-30. This is a Dry Cell Batteries tender in Hyderabad, Telangana
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free