South Central Railway
- AOC value
- ₹91.86L
- AOC date
- 7 Jun
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 7 Jun 23AOC date
- -Published
- -Closes
- -Bid opens
- 7 Jun 2023AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 07/06/2023
- Authority
- South Central Railway
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
South Central Railway has published Supply Of Supply, Installation, Commissioning, Training And Maintenance Of Track Based Way Side Lubricators ( Electronic Type ) With Dual Grease Applicator / Wiper Bar As Per Rdso Specification Irs-T-48 ( June-2013 ) With Acs No-1, Dated :26.02.2020 Including Required Supply Of Grease / Lubricant As Per Annexure-Ii And Maintenance Of The Machines With All Spares And Consumables Etc. During Initial Warranty Period Of 02 Years From Date Of Issue Of Commissioning Certificate. Firm Also To Provide Solar Panel And Battery As Per Para 7.2 Of Specification.Supply, Installation, Commissioning, Training And Maintenance Of Track Based Way Side Lubricators ( Electronic Type ) With Dual Grease Applicator / Wiper Bar As Per Rdso Specification Irs-T-48 ( June-2013 ) With Acs No-1, Dated :26.02.2020 Including Required Supply Of Grease / Lubricant As Per Annexure-Ii And Maintenance Of The Machines With All Spares And Consumables Etc. During Initial Warranty Period Of 02 Years From Date Of Issue Of Commissioning Certificate. Firm Also To Provide Solar Panel And Battery As Per Para 7.2 Of Specification., Supply, Installation, Commissioning, Training And Maintenance Of Track Based Way Side Lubricators ( Electronic Type ) With Dual Grease Applicator / Wiper Bar As Per Rdso Specification Irs-T-48 ( June-2013 ) With Acs No-1, Dated :26.02.2020 Including Required Supply Of Grease / Lubricant As Per Annexure-Ii And Maintenance Of The Machines With All Spares And Consumables Etc. During Initial Warranty Period Of 02 Years From Date Of Issue Of Commissioning Certificate. Firm Also To Provide Solar Panel And Battery As Per Para 7.2 Of Specification. Note: ( 1 ) The Firm Has To Supply The Materials To Stores And Then Make Their Own Arrangements For Shifting Of Materials From Stores To Installation Locations ( Different Locations In Hyderabad Division ) ( 2 ) 1 Km Curve Length Category , Supply Of Required Grease / Lubricant As Per Annexure-Ii And Comprehensive Annual Maintenance Charge For Machine For 03 ( Three ) Year After Expiry Of 02 Years Warranty Period From Date Of Commissioning. The Camc Shall Include Cost Of Preventive Maintenance, Breakdown Maintenance, Essential Spares, Staff / Personal, Transportation And Supply Of Consumable Etc. Warranty Period: 2 Years, Amc Period: 3 Years, Rate Of Discounting: 10 % At ( Location ) Sse / P.Way / Nzb , Scr Telangana 13.00 Numbers Page 1 Of 6 Run Date / Time: 09 / 09 / 2022 10:56:11Hyd / Div / South Central Rly. Last date of submission for this tender is 2022-10-05. This is a Lubricating Oils tender in Hyderabad, Telangana
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free