South Central Railway
- AOC value
- ₹6.96L
- AOC date
- 30 Apr
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 30 Apr 26AOC date
- -Published
- -Closes
- -Bid opens
- 30 Apr 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 30/04/2026
- Authority
- South Central Railway
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
South Central Railway has published Supply Of disconnecting and earthing device 8 pole 2 way on - off on load 63a 750 volt ac ( 1000 v insulation) 2no + 2nc with heavy handle and pad locking arrangement in earth position mounted in a stainless steel enclosure suitable for ac 23 duty confirming to is : 13947/ iec 947 suitable for non ac lhb coaches. as per bom item no 12 a1 from rcf spec .no. edts - 355 rev - 01. makes : schaltbau / l&t. , disconnecting and earthing device 8 pole 2 way on - off on load 63a 750 volt ac ( 1000 v insulation) 2no + 2nc with heavy handle and pad locking arrangement in earth position mounted in a stainless steel enclosure suitable for ac 23 duty confirming to is : 13947/ iec 947 suitable for non ac lhb coaches. as per bom item no 12 a1 from rcf spec .no. edts - 355 rev - 01. makes : schaltbau / l&t. [ warranty period: 30 months after the date of delivery ] ] , disconnecting and earthing device 8 pole 2 way on - off on load 63a 750 volt ac ( 1000 v insulation) 2no + 2nc with heavy handle and pad locking arrangement in earth position mounted in a stainless steel enclosure suitable for ac 23 duty confirming to is : 13947/ iec 947 suitable for non ac lhb coaches. as per bom item no 12 a1 from rcf spec .no. edts - 355 rev - 01. makes : schaltbau / l&t. [ warranty period: 30 months after the date of delivery ] ] , disconnecting and earthing device 8 pole 2 way on - off on load 63a 750 volt ac ( 1000 v insulation) 2no + 2nc with heavy handle and pad locking arrangement in earth position mounted in a stainless steel enclosure suitable for ac 23 duty confirming to is : 13947/ iec 947 suitable for non ac lhb coaches. as per bom item no 12 a1 from rcf spec .no. edts - 355 rev - 01. makes : schaltbau / l&t. [ warranty period: 30 months after the date of delivery ] ]. Last date of submission for this tender is 2026-04-13. This is a Electrical Spares tender in Secunderabad, Telangana
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free