Tamil Nadu Generation And Distribution Corporation Limited
- AOC value
- ₹9.31L
- AOC date
- 10 Oct
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 10 Oct 25AOC date
- -Published
- -Closes
- -Bid opens
- 10 Oct 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 10/10/2025
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Tamil Nadu Generation And Distribution Corporation Limited has published Tender For Works Contract For Rural Mettur Section In Mettur Division In Mettur Edc; 1 Work contract schedule 2 Excavationofpolepitupto27 (8.0 m) Pole by using JCB or manual 3 Excavation of pole pit above 8.0 Mtr pole PSC/RCC/RSJ pole by using JCB or manual 4 Excavation of Stay pit 4.5 to 5 depth by using JCB or manual 5 Hard rock without blasting (Where houses are located)upto 27inch 6 Hard rock without blasting (Where houses are located)upto 9m and above 7 Erection of stay set complete 8 Erection of PSC/ RCC poles/Metal poles upto 8.00m. (27) by using JCB or manual 9 Erection of PSC/ RCC poles/Metal poles above 8.00m by using JCB or maual 10 Fixing of HT/LT TI Fittings 11 Fixing of HT V X arms/ Channel X arms,Guarding X arms 12 Fixing of HT Pin Insulators - 22 KV 13 Fixing of HT 11 KV Strain disc 14 Fixing of LT 1 -phaseX arm 15 Fixing of LT 3 -phaseX arm 16 Fixing of LT Pin insulators 17 Fixing of LT Shackle 18 Fixing of Alu Knob 19 Paving , Stringing, Binding & Jumpering ofACSR 7/4.09 mm Raccoon conductor 20 Paving , Stringing, Binding & Jumpering of ACSR 7/3.35 & AAAC 7/3.15 mm 21 Paving , Stringing, Binding & Jumpering of ACSR 7/2.59 mm & ACSR 7/2.11 mm AAC 7/2.50 22 Transport of poles/Materials/ Conductors (Excluding loading & Unloading charges) Below 8 Kms 23 Loading of line materials 24 Unloading of line materials 25 Loadingof PSC pole 24 & 27 26 Unloading of PSC pole 24 & 27 27 Loadingof PSC pole 9.0 mtr pole (300Kg) 28 Unloading of PSC pole 9.0 mtr pole (300Kg) 29 Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual up to 100 m 30 Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m 31 Transportofpoles/Materials/ conductors andother materials (excludingloading andunloadingcharges.) Above8Kms.ForadditionalKm (Irrespective of weight in 32 Massconcreting including materials (Cement+ River sand/ M sand and Blue metals and watering) 33 Sleeveconcreting including materials (Cement + River Sand/ M sand and Blue metals and watering) 34 Stay Concreting includingcost of materialsand labour 375mmx375mmx50mm 35 Base Concreting includingcost of materialsand labour2x2x1 (If base plate not provided) 36 Labour chargesfor alteration of Back clamp 37 Labour chargesfor alteration of Stay clamp 38 Labour chargesfor Cutting of Coconut Leaves (Per Tree) 39 Labour chargesfor Cutting Clearing of Branches of Tree 40 Loading or unloading of Transformer above 200 KVA 41 Labour chargesfor Drilling of hole in channel only 3/4 & 1 per hole 42 Labour charge for Cutting of Channel/ Angle/Flat 43 Erection of New Transformer all capacities (with jumpering) 44 ErectionofTransformerstructure completeinallrespectswithwiring, Earthing,fixingofopentypefuseunits, HT/LT LASandjumpering3 Nos.Earth pitswith collar includingpaintingofmetal parts, structurepoles,fixingoftopchannel, seatingchannel, beltingangle including concreting (Except erectionofTransformer) 45 Erection of Single Pole Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting (Except erection of Transformer) Per 46 Earthing of pole with coil earthing including burying looping and binding. 47 Erectionofstreetlightincluding fixurefitting 48 Erection of street light service 49 Dismantling of ErectionofTransformerstructure completeinallrespectswithwiring, Earthing,fixingofopentypefuseunits, HT/LT LASandjumpering3 Nos.Earth pitswith collar includingpaintingofmetal parts, structurepoles,fixingoftopchannel, seatingchannel, beltingangle including concreting (Except erectionofTransformer) 50 Dismantling ofPole 8.0 Mtr 51 ReleasingofgrillsfromRCC Poles 52 Releasing of 3 phase service and refixing 53 Releasing of 1 phase service and refixing 54 Dismantling of HT V Cross arms(all type) 55 Dismantling of HT 22 KV Pin Insularors 56 Dismantling of HT/LT TI Fittings 57 Dismantling of HT 22KV Strain Disc 58 Dismantling of LT 1 PH X arm 59 Dismantling of LT 3 PH X arm 60 Dismantling of LT Shackle 61 Dismantling of LT Pin insulators 62 Dismantling of Alu Knob 63 Dismantling of Stay set complete 64 Dismandling of ACSR 7/3.35mm conductor 65 Dismantling of ACSR 7/2.59 mm / AAAC 2.50 mm weasel and ACSR 7/2.11 mm Conductor . Last date of submission for this tender is 2025-08-19. This is a Paver Blocking tender in Mettur, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
5 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3xlsxXLSX document
- Tender Document 4pdfPDF document
- Tender Document 5pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free