🎉 Your free trial plan has started. Plan will expire in 0 days

Tamil Nadu Generation And Distribution Corporation Limited

tuticorin, tamil nadu

AOC value
₹14.57L
AOC date
18 Sep
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 18 Sep 25AOC date

Important info

Result ID
Refer Docs
Award of contract
18/09/2025
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Tamil Nadu Generation And Distribution Corporation Limited has published Tender For Civil Maintenance Circle - Cmd - I - Improvement Works To The Hydrogen Plant - I And Ii; 1. Providing two legged scaffolding, for works upto various heights as specified using 13 to 15 cm dia casuarina props, the distance between the two rows being 1.25m and the spacing of posts being 2m in both the rows with two horizontal posts with 0.5m overlap on either side and braces at 2m c/c including longitudinal & transverse middle braces to step up and providing a platform with country wood planks of 40 mm thick & 1m width, etc. including cost of all materials, labours, lead, lift, safety measures, etc. complete. a 27.30 Rm For a height of 3.00 mtr. 1 Rm (One Running Metre only) b 59.00 Rm For 5 mtr. Height 1 Rm (One Running Metre only) 2. 75.00 M 2 Providing wooden platform with scaffolding arrangement using 10 to 13cm dia. Casurina posts and 40mm thick country wood planks for providing platform over the scaffolding including cost of all materials labour, lead, lift etc., complete. 1 M2 (One Square Metre only) 3. 5.00 M 3 Dismantling the spalled/ distressed RCC and loose particles from the existing concrete including roughening the surface after thorough cleaning, rate including cost of all labour, lead, lift etc., complete. 1 M3 (One Cubic Metre only) 4. 30.00 M 2 Dismantling the existing the rolling shutter door including removal of frames, hinges & fastenings, including cost of all materials, labours, lead, lift, devolution to sores, etc. complete. 1 M2 (One Square Metre only) 5. 7.00 M 3 Providing RCC 1:1.5:3 using OP/PP cement with 12 to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete 1 M3 (One Cubic Metre only) 6. 350.00 Kg Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting 1 Kg (One bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift, tools etc., complete. Kilogram only) 7. 16.60 M 2 Providing centering and shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all labour, lead, lift, tools etc., complete. 1 M2 (One Square Metre only) 8. 1.80 M 3 Brick work in CM 1:5 using fly ash bricks (230x110x70mm) including cost of all materials, labours, lead, lift, curing, etc. complete 1 M3 (One Cubic Metre only) 9. 102.80 M 2 Plastering with CM 1:3, 10mm thick including cost of all materials, labour, lead, lift etc., complete. 1 M2 (One Square Metre only) 10. 95.00 M 2 Plastering with CM 1:5, 12mm thick including cost of all materials, labour, lead, lift etc., complete. 1 M2 (One Square Metre only) 11. 271.00 M 2 Removing the existing damaged felt and cleaning the surface free from oil, dust, dirt, grease etc., and transporting the debris with 1km lead away from the site and lowering from the surface with water till the saturation for the entire area, rate including labour, lead lift etc., complete. 1 M2 (One Square Metre only) 12. 422.00 M 2 Terrace flooring (weathering course) with one course of pressed tiles 200x200x20mm over CM 1:3, 20mm thick mixed with crude oil 10% by weight of cement and pointing with the same oiled mortar over a bed of 80mm thick concrete broken brick jelly 20mm size in pure slaked lime with required slope over RCC roof slab including cost of all materials, labours, lead, lift, curing, etc. complete. 1 M2 (One Square Metre only) 13. 79.30 M 2 Removing the damaged gear box and side channel with gear rod upto top, greasing, replacing of new gear box, welding the gear wheel with gear rod alignment checking refixing in position over wall and removing of bottom T angle, bend removing and welding the broken plates, top cover removing dismantling the lath from the roller, removing the spring, removing shaft, reconditioning of the shaft and replacing the spring, cleaning the old grease strengthening if roller assembly and refixing in position loading the springs and overhauling the rolling shutter, gear box, roller, ball bearing etc., complete. 1 M2 (One Square Metre only) 14. Supplying and fixing spare parts including cost of labour, materials etc., complete a 4.00 Set Gear box assembly 1 Set (One Set only) b 6.90 Rm Shutter bottom plate with stiffner angle 1 Rm (One Running Metre only) c 89.70 Rm Shutter lath leaf 1 Rm (One Running Metre only) d 10.00 Nos Shutter Spring (Heavy duty) 1 No (One Number only) 15. 659.20 M 2 Providing two coats of ready mixed plastic emulsion(interior walls) of first quality paint and approved colour over a priming coat including cost of all materials scaffolding charges thorough cleaning of surface, labours, lead, lift, curing, etc. complete. 1 M2 (One Square Metre only) 16. 622.50 M 2 Providing two coats with ready mixed plastic emulsion (exterior walls) of first class quality paint & approved colour over a priming coat including cost of all materials, scaffolding charges, thorough cleaning of surface, labours, lead, lift, curing, etc. complete 1 M2 (One Square Metre only) 17. 158.50 M 2 Painting the old iron works with two coats of best synthetic enamel paint of industrial quality Asian Paint or equivalent of approved colour with sand paper rate including cost of paint, brush, labour, lead, lift etc., complete. 1 M2 (One Square Metre only) 18. 1.60 M 2 Writing of letter painting in the Hydrogen plant-I & Hydrogen plant-II with two coat of enamel paint for background and writing letter of size 15cm bordering alround including cost of paint, labour, lead, lift, etc., complete. 1 M2 (One Square Metre only). Last date of submission for this tender is 2025-06-19. This is a Dismantling Work tender in Tuticorin, Tamil Nadu

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

5 issued
  • Tender Document 1html
  • Tender Document 2xlsx
  • Tender Document 3pdf
  • Tender Document 4pdf
  • Tender Document 5pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in