Southern Railway
Important Info
AOC Description
Southern Railway has published Supply Of slack adjuster, irsa 600 , slack adjuster, irsa 600 for freight stock (control rod length-1256/1254 mm) to drg.no. wd-82064-s/1 rc, alt.12 to rdso spec.07-abr92,amendment. no.5 of sept 2016 [ warranty period: 36 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] , slack adjuster, irsa 600 for freight stock (control rod length-1256/1254 mm) to drg.no. wd-82064-s/1 rc, alt.12 to rdso spec.07-abr92,amendment. no.5 of sept 2016 [ warranty period: 36 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] , slack adjuster, irsa 600 for freight stock (control rod length-1256/1254 mm) to drg.no. wd-82064-s/1 rc, alt.12 to rdso spec.07-abr92,amendment. no.5 of sept 2016 [ warranty period: 36 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]. Last date of submission for this tender is 2026-08-07. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

