🎉 Your free trial plan has started. Plan will expire in 0 days

Southern Railway

chennai, tamil nadu

AOC value
₹8.4L
AOC date
2 Dec
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 2 Dec 24AOC date

Important info

Result ID
Refer Docs
Award of contract
02/12/2024
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Southern Railway has published Supply Of Vertical Top Loading Cylindrical Autoclave Machinevertical Top Loading Cylindrical Autoclave Machine,Supply, Installation And Commissioning Of Vertical Top Loading Cylindrical Autoclave Machine For Ste Am And Pressure Sterilization As Per The Enclosed Specification. [ Warranty Period: 36 Months After The Date Of D Elivery ] Admo/Cgl, Sr Tamil Nadu 1.00 Numbers , Comprehensive Maintenance Contract For Vertical Top Loading Cylindrical Autoclave Machine For Steam And Pressure Sterilization. Camc : Bidders To Note That This Is A Composite Tender For Procure Ment Of Vertical Top Loading Cylindrical Autoclave Machine For Steam And Pressure Sterilization And Camc For 05 Years Beyond 3 Years Warranty Period. Bidders Are Required To Quote Charges For Camc For 5 Years Post Warrant Y Period Of 03 Years. The Evaluation Of Offers Will Be Based On Total Cost Of Vertical Top Loading Cylindrical Autocla Ve Machine For Steam And Pressure Sterilization And Net Present Value Of Camc Cost For 5 Years After Warranty Period. The Npv Will Be Worked Out At A Discounting Rate Of 10%. Note:- 1. Firms To Quote Camc Charges Separ Ately For Each Year I.E Year 1 Tab (For 4Th Year), Year 2 Tab (For 5Th Year) , Year 3 Tab (For 6Th Year), Year 4 T Ab (For 7Th Year), Year 5 Tab (For 8Th Year). 2. Firm Should Quote Actual Rate Of Camc In The Bid. Discounted Rat E As Per Npv Will Be Generated By The Ireps System For Ranking Purpose. (1) The Condition Of Comprehensive Annual Maintenance Contract After Completion Of Warranty Period Will Be As Per The Tendered Specification Which W Ill Be Executed By The Consignee. The Supply Contract Will Include Rate Of Camc But The Actual Camc Will Be Oper Ated By The Consignee And The Supplier Will Be Bound To Accept The Camc Contract Rate Against This Tender/Po. (2) Spl. Condition For Camc After Completion Of Warranty: After Completion Of Warranty Period, The Camc Contract Will Be Entered Into By The Consignee As Per Terms And Conditions In This Tender/Po.. Last date of submission for this tender is 2024-07-25. This is a Loading Work tender in chennai, Tamil Nadu

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

1 issued
  • Tender Document 1html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in