🎉 Your free trial plan has started. Plan will expire in 0 days

Public Works Department

chennai, tamil nadu

AOC value
₹22L
AOC date
6 Oct
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 6 Oct 25AOC date

Important info

Result ID
Refer Docs
Award of contract
06/10/2025
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Public Works Department has published Tender For Renewal Of Emergency Backup Ups In Various Icu In Periyar Government Hospital, Periyar Nagar, Chennai-82.; 1 Renewal by Supply and fixing of 15kVA (three phase input/ Single phase output) microprocessor controlled double conversion true online ups system with built in isolation transformer and power factor correction with smf batteries for 1 hours backup time and with suitable ms powder coated rack for batteries and interlink cables complete with the following specifications: CONFIGURATION TRUE ON-LINE Double conversion ups system with pulse width modulation(PWM)Technology using IGBT inverter.RECTIFIER :Full wave (shall fully meet the specified input power requirements)NPUT:-176-280V(Line-Neutral), 305V-405V (Line-LineOUTPUT:- 230v± 1% FREQUENCY:- 50 Hz ±0.1 %SYSTEM DC VOLTAGE:- 360V (12V x 30 Nos)INVERSION TECHNOLOGY:-Micro processor controlled, PWM with instantaneous SINE WAVE control using IGBT.CHARGER :- Built in solid state automatic float-cum boost charger with constant current, constant voltage mode of chargingalong with current limiting features. Ripple in DC shall not exceed 2% when battery is disconnected. 2 PROTECTIONS(in built):-i. Output under voltage.ii. output over voltage.iii. output over load.iv. output short circuit.v.HRC Fuses-input/output/ battery.vi. Battery low trip. vii. battery charging current limit.INDICATIONS:-i. Mains ONii. Inverter ONiii. UPS ON Batteryiv. Load ON UPSv. Battery LOWvi. Mains Failurevii. Overload Tripviii. Inverter TripMETERING:-i. Output AC voltageii. Output DC voltageiii. FrequencyTERMINALS:-Input- 4 Pole MCBOutput – 2 Pole MCB 3 Renewal by Supply and fixing of stand for the UPS batteries for 15 kVA UPS 4 Renewal by Supply and fixing of 3KVA (single phase input/ Single phase output) microprocessor controlled double conversion true online ups system with built in isolation transformer and power factor correction with smf batteries for 1 hour backup time and with suitable ms powder coated rack for batteries and interlink cables complete with the following specifications: CONFIGURATION TRUE ON-LINE Double conversion ups system with pulse width modulation(PWM)Technology using IGBT inverter.RECTIFIER :Full wave (shall fully meet the specified input power requirements)INPUT:-230v± 15%OUTPUT:- 230v± 15% FREQUENCY:- 50 Hz ±0.5 HzSYSTEM DC VOLTAGE:- 96V (12V x 8 Nos)INVERSION TECHNOLOGY:-Micro processor controlled, PWM with instantaneous SINE WAVE control using IGBT.CHARGER :- Built in solid state automatic float-cum boost charger with constant current, constant voltage mode of chargingalong with current limiting features. Ripple in DC shall not exceed 2% when battery is disconnected 5 PROTECTIONS(in built):-i. Output under voltage.ii. output over voltage.iii. output over load.iv. output short circuit.v.HRC Fuses-input/output/ battery.vi. Battery low trip. vii. battery charging current limit.INDICATIONS:-i. Mains ONii. Inverter ONiii. UPS ON Batteryiv. Load ON UPSv. Battery LOWvi. Mains Failurevii. Overload Tripviii. Inverter TripMETERING:-i. Output AC voltageii. Output DC voltageiii. FrequencyTERMINALS:-Input- 2 Pole MCBOutput – 2 Pole MCB 6 Renewal by Supply and fixing of stand for the UPS batteries for 3 KVA UPS 7 Renewal by Supply and fixing of 40A 2P changeover MCB with enclosure on wall with earth connection 8 Renewal by Supply and Run of 4 of 10 sq.mm. PVC insulated SC unsheathed FRLS copper conductor of 1100 V grade in suitable PVC rigd pipe on wall and ceiling with continuous earth wire connection of 10 sq.mm copper wire with painting of suitable colour. 9 Renewal by Supply and Run of 2 of 10 sq.mm. PVC insulated SC unsheathed FRLS copper conductor of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with continuous earth wire connection of 10 sq.mm copper wire with painting of suitable colour. . Last date of submission for this tender is 2025-09-12. This is a Ups tender in Chennai, Tamil Nadu

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

6 issued
  • Tender Document 1html
  • Tender Document 2pdf
  • Tender Document 3xlsx
  • Tender Document 4pdf
  • Tender Document 5pdf
  • Tender Document 6pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in