Integral Coach Factory
- AOC value
- ₹2.44Cr
- AOC date
- 25 Jan
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 25 Jan 24AOC date
- -Published
- -Closes
- -Bid opens
- 25 Jan 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 25/01/2024
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of S&I Of Frp Paneling With Fixing Requirements For Emu Coachess&I Of Frp Paneling With Fixing Requirements For Emu Coaches,Supply And Installation Of Frp Paneling With Fixing Requirements For Side Wall, End Wall, Partition And Roof Of Emu/3Ph Coaches To Specn. No. Icf/Md/Spec-167A, Issue Status-01, Rev-05 With Amd-01 To 04 And General Arrangement And Dimensions To Drg. Nos. Emu/M/3Ph-4-2-001, Col-I, Alt-Nil, (Items 1 To 6), Emu/M/3Ph-4-3-001, Alt-Nil, Item-2 And 5, Icf/Mrvc/M/Bt-4-4-006, Col-I, (Except Item-1) Alt-H. Please Visit Icf Vendor Portal For Downloading Drawing Https://Vp.Icf.Gov.In/Vendtendordetnew.Php Using Key:0723V6zwjdt1830 [ Warranty Period: 30 Months After The Date Of Delivery ] Furnishing Depot/Icf,Chennai, Tamil Nadu 131.00 Set. Last date of submission for this tender is 2023-11-20. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free